SIX - LANING OF GURGAON- KOTPUTLI - JAIPUR SECTION OF NH - 8 FROM Km 42.

70 T
(LENGTH - Km 225.60) IN THE STATE OF HARYANA AND RAJASTHAN ON DBFO BA
CONTRACT PACKAGE - NHDP- PHASE V
NHAI

CONCESSIONAIRE

PMC

CONT

LEA ASSOCIATES SOUTH ASIA PVT. LTD.

LONGJIAN ROAD

Calibration of Rapid Moisture Meter No. R-1


Date
RMM No.
Calibration of RMM

:
:
:

Accuracy of measuring device =


RMM capacity =

31.03.2010
R-1
Lab.

Observed reading

Actual
Moisture
Taken

RMM
Reading

Oven Dry MC

18

3.02

2.99

16

6.04

6.06

14

12

9.52

8.93
RMM10
Reading

12

11.55

12.03
8

15

14.57

15.09

18

17.53

18.11

Corrected Moisture Content( 1to 18)

C. f = 1.016

Oven D

14

12

RMM10
Reading

0
0

1
2
3

1.02
2.03
3.05

4
5
6

4.06
5.08
6.09

7
8
9

TESTED BY

7.11
8.13
9.14

10
11
12

10.16
11.17
12.19

CHECKED BY/APPROVED BY

SIGN:

SIGN:

NAME:

NAME:

Oven D

- JAIPUR SECTION OF NH - 8 FROM Km 42.70 TO 273.00


TE OF HARYANA AND RAJASTHAN ON DBFO BASIS

PACKAGE - NHDP- PHASE V

INDEPENDENT ENGINEER
SNC-AARVEE (JV)

CONTRACTOR
LONGJIAN ROAD AND BRIDGE LTD. CO.

Rapid Moisture Meter No. R-1


Accuracy of measuring device =

1
50

%
%

18

16

14

12

RMM10
Reading

0
0

10

Oven Dry

12

14

16

18

14

12

RMM10
Reading

0
0

10

Oven
13 Dry

14
15

12

14

13.20
14.22
15.24

16
17
18

16

REVIEWED BY (IE)
SIGN:
NAME:

18

16.25
17.27
18.28

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Tra

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

Calibration of Rapid Moisture Meter No. R-1


Date

: 19.01.13

Accuracy of measuring device

RMM No.

: 58+360L/S (Lab.)

RMM capacity

Calibration of RMM

: R-1

Due Date

Observed reading

Actual
Moisture
Taken

RMM
Reading

Oven Dry MC

20
18
16

2.00

1.98
14

3.50

3.97

6.00

6.05

12
RMM Reading
10
8

7.50

7.98
6

10

10.00

10.05

12

12.00

11.65

4
2
0

14

14

13.55

10
Oven Dry

16

16.5

16.12

C. f = 0.998

1.00

3.99

Corrected Moisture Content( 1 to 18 %)


7
6.99
10
9.98

12

2
3

2.00
2.99

5
6

4.99
5.99

8
9

7.98
8.98

Construction Team

Independent Engineer

Date:

Date:

11
12

10.98
11.97

ntenance of Pathankot to Amritsar sectioofNH15fromKm


on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

National Highways Authority of India


IRB Pathankot Amritsar toll road pvt. Ltd
II From Km 57+900 to 108+502

Rapid Moisture Meter No. R-1


: 1%
: 50%
: 18.07.13

10

12

14

16

18

20

Oven Dry

Moisture Content( 1 to 18 %)
13

12.97

16

15.97

14
15

13.97
14.97

Supervision Team

Date:

17
18

16.96
17.96

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Tra

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

Calibration of Rapid Moisture Meter No. R-2


Date

: 19.01.13

Accuracy of measuring device

RMM No.

: 58+360L/S (Lab.)

RMM capacity

Calibration of RMM

: R-2

Due Date

Observed reading

Actual
Moisture
Taken

RMM
Reading

Oven Dry MC

20
18
16

2.00

1.89
14

3.50

3.87

6.00

6.12

12
RMM Reading
10
8

8.00

8.33
6

10

10.50

10.32

12

12.00

11.82

4
2
0

14

14.0

13.85

10
Oven Dry

16

16

16.33

C. f = 1.007

1.01

4.03

Corrected Moisture Content( 1 to 18 %)


7
7.05
10
10.07

12

2
3

2.01
3.02

5
6

5.04
6.04

8
9

8.06
9.07

Construction Team

Independent Engineer

Date:

Date:

11
12

11.08
12.09

ntenance of Pathankot to Amritsar sectioofNH15fromKm


on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

National Highways Authority of India


IRB Pathankot Amritsar toll road pvt. Ltd
II From Km 57+900 to 108+502

Rapid Moisture Meter No. R-2


: 1%
: 50%
: 18.07.13

10

12

14

16

18

20

Oven Dry

Moisture Content( 1 to 18 %)
13

13.10

16

16.12

14
15

14.10
15.11

Supervision Team

Date:

17
18

17.13
18.13

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Tra

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

Calibration of Rapid Moisture Meter No. R-3


Date

: 19.01.13

Accuracy of measuring device

RMM No.

: 58+360L/S (Lab.)

RMM capacity

Calibration of RMM

: R-3

Due Date

Observed reading

Actual
Moisture
Taken

RMM
Reading

Oven Dry MC

20
18
16

2.00

1.85
14

3.50

4.05

6.00

6.05

12
RMM Reading
10
8

8.50

8.33
6

10

10.50

10.04

12

12.50

12.01

4
2
0

14

14.5

14.02

10
Oven Dry

16

16.5

16.12

C. f = 0.979

0.98

3.92

Corrected Moisture Content( 1 to 18 %)


7
6.86
10
9.79

12

2
3

1.96
2.94

5
6

4.90
5.88

8
9

7.83
8.81

Construction Team

Independent Engineer

Date:

Date:

11
12

10.77
11.75

ntenance of Pathankot to Amritsar sectioofNH15fromKm


on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

National Highways Authority of India


IRB Pathankot Amritsar toll road pvt. Ltd
II From Km 57+900 to 108+502

Rapid Moisture Meter No. R-3


: 1%
: 50%
: 18.07.13

10

12

14

16

18

20

Oven Dry

Moisture Content( 1 to 18 %)
13

12.73

16

15.67

14
15

13.71
14.69

Supervision Team

Date:

17
18

16.65
17.63

Design, Engineering, Finance, Construction, Operation and Maintenance of Pathankot to Amritsar sectioofN
6.082 to Km 108.502 in the state of Punjab Under NHDP III B on Design, Build, Finance, Operate and Tra

Client

: National Highways Authority of India

Concessionaire

: IRB Pathankot Amritsar toll road pvt. Ltd

Section

: II From Km 57+900 to 108+502

Calibration of Rapid Moisture Meter No. R-4


Date

: 18.07.13

Accuracy of measuring device

RMM No.

: 58+360L/S (Lab.)

RMM capacity

Calibration of RMM

: R-4

Due Date

Observed reading

Actual
Moisture
Taken

RMM
Reading

Oven Dry MC

20
18
16

2.00

2.13
14

4.00

3.86

6.00

5.98

12
RMM Reading
10
8

8.50

8.25
6

10

10.50

10.25

12

12.50

12.33

4
2
0

14

14.5

14.16

10
Oven Dry

16

16.5

16.19

C. f = 0.982

0.98

3.93

Corrected Moisture Content( 1 to 18 %)


7
6.87
10
9.82

12

2
3

1.96
2.95

5
6

4.91
5.89

8
9

7.86
8.84

Construction Team

Independent Engineer

Date:

Date:

11
12

10.80
11.78

ntenance of Pathankot to Amritsar sectioofNH15fromKm


on Design, Build, Finance, Operate and Transfer(DBFOT)Basis

National Highways Authority of India


IRB Pathankot Amritsar toll road pvt. Ltd
II From Km 57+900 to 108+502

Rapid Moisture Meter No. R-4


: 1%
: 50%
: 18.07.13

10

12

14

16

18

20

Oven Dry

Moisture Content( 1 to 18 %)
13

12.76

16

15.71

14
15

13.75
14.73

Supervision Team

Date:

17
18

16.69
17.67