12.2
It was mentioned that the use of the Projection Program or the Planning Program of a complete
calculation for mill material balance is best to make the projection of an optimal performance of
a milling tandem.
The program made through scientific calculation based upon the existing mill tandem and the
quality of cane crushed obtaining adequate and reasonable values, which is then used for the
operation targets of the sugar factory normally stated in the budgeting purposes; not just taken as
average from the previously milling seasons.
The program is in one file with the Evaluation Program. The Projection Program also consists of
2 (two) sheets that are:
Sheet-III, inputs for the Projection, and
Sheet-IV, the result of the Projection.
12.2.1 Projection Data
All the inputs for the Projection must be typed in sheet-III, which is identical with sheet-I for the
Evaluation inputs. Here all the data must also be typed replacing the blue letters in the red lined
boxes only, first the name of the sugar factory, the tandem composition, operational year
(crushing season), the period (usually bi-weekly) number or purpose of projection, etc.
Then the technical data of the mill rollers in use, the projected mill rotation per hour based upon
the drive nominal speed, the hydraulic pressure, the top angle, the shaft dimensions and so on
(the same dimensions for the Evaluation Program is used here).
M I L L M A T E R I A L B A L A N C E
I N P U T F O R P R O J E C T I O N ( a v e r a g e o r t o t a lize d o f d a t a a c h ie v e d )
A TTENTION:
Ty p e i n t h e d a t a ( b l u e l e t t e r s ) i n t h e r e d l i n e d s q u a r e b o x e s o n l y .
Sugar Factory
M ill Tra in
E X A M P LE
2 CC + 5 MILLS
M illing Se a s o n ( y e a r )
P e rio d o f 1 5 m illing da y s , n u m b e r
1977
X
P e rio d d a t e s e v a lua t e d u p t o
I.
Last date
III
IV
1,052.0
1,050.0
1,048.0
1,073.0
1,069.0
1,066.8
1,051.0
1,048.0
1,040.0
1,050.0
1,048.0
1,040.0
1,064.0
1,052.0
1,048.0
2 5 .0
2 5 .0
2 5 .0
2 5 .0
1 5 .0
1 5 .0
1 5 .0
1 5 .0
1 5 .0
1 5 .0
d e liv e r y
top
2 5 .0
1,002.0
2 5 .0
1,023.0
1 5 .0
1,021.0
1 5 .0
1,020.0
1 5 .0
1,034.0
fe e d
d e liv e r y
1,000.0
998.0
1,019.0
1,016.8
1,018.0
1,010.0
1,018.0
1,010.0
1,022.0
1,018.0
L e n g t h o f s h e ll
M ill rolle r s p e e d
H y d r a u lic p r e s s u r e
L
n
ph
2,133
270
180
2,133
270
190
2,133
270
200
2,133
270
210
2,133
270
220
H y d r a u lic ra m d ia .
Transm ission factor
d
r
330
86
330
86
330
86
330
86
330
86
M ill rolle r s h a f t d ia .
M ill rolle r s h a f t l e n g t h
dp
l
420
4,220
420
4,220
420
4,220
420
4,220
420
4,220
T o p a n g le
Top roller lift
a
t
78
6.0
78
6.0
78
6.0
78
6.0
78
6.0
- o n f e e d o p e n in g
- o n d e liv e r y o p e n i n g
tf
td
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
4.7
O u t s i d e d ia m e t e r ( D o ) :
M e a n d ia m e t e r ( D k ) :
top
fe e d
d e liv e r y
top
fe e d
XII-11
Then further we have to fill in the projected capacity and the quality of cane together with the
projection of mixed juice quantity and its Brix degree, the foam correction factor, imbibition
water rate, etc.
Finally simulation of Brix degrees for each juice extracted by the mills together with its Pol
degrees.
Cane:
crushed, total
crushing duration
pol
brix
fiber
Mixed juice:
gross
brix
dirt corr.
Imbibition water, total
A pplied on:
Q
jg
pt
4,800.0 TCD =
24.00 hours
10.32 %
bt
f
Gnm
13.41 %
16.07 % cane
4,800.0 Tons =
bnm
knm
Gi
12.60 %, pol =
1.00308
1,581.3 Tons =
bagasse 1
bagasse 2
bagasse 3
bagasse 4
A verage value of fiber density
Bx ratio juice#1 to cane
bn1/bt =
J uice:
M I L L NO: --------------->
brix
bn
pol
pn
200.00 TCH
Purity =
76.96 %
200,000 kg/hr =
1 0 0 . 0 0 % cane
10.04 Purity =
79.68 %
65,887 ltr/hr =
2 0 5 . 0 0 % fiber
32.94 % cane
0 %
0 %
30 %
70 %
1.60000 kg/dm3
1.19
Last mill bagasse juice to fiber =
I
16.02
12.98
II
9.82
7.65
III
5.60
4.05
IV
3.10
2.10
1 0 5 . 0 0 % ----->
V
1.90
1.18
Unit
%
%
gnhs =
khar =
PSHK =
100%
32.97 %
1.05 %
97.44 %
During the simulation please observe the values underneath, which shall be met with the limits.
J uice:
purity
HK
extraction
En
brix distr. coeff.
kB
Normal value
Compression ratio
K
Bagasse: no-void density
da
absorp.ability factor
r
ditto, normal
r'
fiber content
kf
fiber index
c
red. fiber loading
q'
pol
pa
brix
ba
dry matter
zk
81.02
77.90
72.32
67.74
62.11 Decreasing from one to the following mills
53.42
66.12
65.89
66.23
60.72 Best > 60% (decreasing to the following mills)
1.000
0.935
0.830
0.715
0.607
0,9-1,1 0,8-1,0 0,7-0,9 0,6-0,8 0,5-0,7
Decreasing from one to the following mills
2.56
3.24
3.08
3.01
2.55
1.1851 1.2015 1.2154 1.2232 1.2322 Increasing from one to the following mills
1.3501 1.3316 1.3164 1.3081 1.2985 Decreasing from one to the following mills
1.3492 1.3380 1.3269 1.3158 1.2962
29.13
36.25
41.18
44.68
48.78 Increasing from one to the following mills
Increasing from one to the following mills
0.47
0.58
0.66
0.71
0.78
134.89 129.41 129.92 130.17 126.67 q' = 120-130 gr/dm2 - normal
8.19
4.75
2.90
1.72
0.94
q' = 130-140 gr/dm2 - Donnelly chute
11.33
40.46
7.51
43.77
5.27
46.46
3.74
48.42
2.58
51.36
When the values match or lies between the limits, then the projection of mill material balance
shown on the Projection sheet (sheet-IV, page 1 through page 3) for overall as well as the
individual performance is final and good. Otherwise, simulation has to be redoing until all the
values are relevant to the limits.
XII-12
Step descriptions
Type in the file name.
Remarks
First row, say: "Jat-2000"
Meaning SF Jatiroto, milling season 2000, or
"Jat00-XI"; means SF Jatiroto milling season
2000, period of 15-days, Nr. XI.
File name max. 8 digits.
Understood.
Type in the data of the mill rollers in The outside diameter, groove correction,
use.
roller length, projected roller speed (rph)
based on 90-95% from the prime mover
nominal speed, top roller lift and top angle of
triangle formed by the rollers.
XII-13
1.15 - 1.16
1.15 - 1.17
1
2
1
2
1.15
1.15
1.15
1.15
Crusher + 1 Unigrator
Cane Cutter
Cane Cutter + 1 Unigrator
Cane Cutter + 1 Unigrator/Shredder
1.18
1.18
1.19
1.20
XII-14
5 mill tandem
Mill No.1
0.25 Mill No.2
0.28 Mill No.3
0.32 Mill No.4
0.37 -
0.35
0.40
0.45
0.50
Mill No.5
0.35
0.38
0.42
0.47
0.45 - 0.50
0.900
0.900
0.800
0.600
0.500
1.100
1.000
0.900
0.800
0.700
Extracted from C.R. Murray & J.E. Holt, The Mechanics of Crushing Sugar Cane, 1967
XII-15
It is advised when simulating the Brix degree of juice#1, the value of kB for mill#1 shall be
made equals to 1.0 (one point zero).
7. The ratio of extracted juices between the feed and the delivery openings (y):
y = positive, juice is extracted by the feed opening.
y = negative, juice is not extracted by the feed opening.
In the projection the value of y should be positive with an average between 0.10 and 0.30.
8. Cofficient of friction ()
Cofficient of friction between bagasse / cane and the roller surface depends on the
number of rotation of the roller, normally between 0.32 and 0.38.
9. The Compression (K)
The value of compression K is between 3.50 and 2.00; defined from the following formula:
Vim
Ved
Whereas: Vim = no-void volume of incoming material per hour.
K
XII-16