Sunteți pe pagina 1din 13

PT.

BESTINDO PUTRA MANDIRI

Company Reference

PROJECT REFERENCES

Bandung Institute of Technology


Water Treatment Plant ( 1997)
Capacity 20 liter/ second

Ground Water Water treatment plant for Iron and Mangganes


Removal for Banding Institute of Technology

Institute Technology Bandung

Heavy Metal Treatment Plant ( 1997)


for Faculty of Environmental

Institute Technology Bandung

Wastewater Treatment Plant ( 1997)

PT. Panasia Indosintec


(Tangerang)
PT. Panasia Indosintec

Water Softener ( 1997)

Water Softener ( 1997)

(Semarang)
PT. Tridarma Megamitra

Water Softener Capacity : 50 m3/hour

PT. Indovon

Activated Carbon & Water Softener


Capacity : 288 m3/day

PT. Setia Kidji Red

Activated Sand Filter, Activated Carbon & Water Softener

RS. Alihksan

Activated Carbon Filter & Activated Sand Filter

Capacity : 288 m3/day

Water Softener & RO


Capacity 240 m3/day
Ron-88

PT. Trijaya

PT. Hexatex

Activated Sand Filter & Water Softener


Capacity 240 m3/day

Water Softener Capacity 480 m3/day

PT. Medika Griya Hospital

Reverse Osmosis System For Haemodialisys


Capacity : 28 m3/hour

PT. Arta Trimustika


Activated Carbon Filter And Softener
Capacity 50 m3/hour

PT. Intiroda - Tangerang

Filter Press

Savoi Homan Hotel

Sewage Treatment Plant

PT. Toyota

Wastewater Water

PT. Intiroda

Demineralization Plant was built to be used for electroplating


purpose.
The plant had meet the requirement of quality water below 1
mircroscm

PT. Bikasoga

Pressure Filter

PT. Digdaya

Demineralization Plant Capacity 24 m3/day

PT. Sinar Garuda

Activated Carbon Filter & Water Softener Capacity 12 m3/hour

PT. Panasia Indosintec

Carbon Filter, Water Softener, Sand filter

Bank Indonesia

Pressure Filter (1988)

PT. Melvin
Water Softener
Capacity : 240 m3/day
(1998)

PT. Melvin
Water Softener
Capacity : 60 m3/day
(1998)

Quality of water for textile dying is very important. One of the


parameter should be removed is hardness. Softener was installed
to remove calcium and magnesium from feed water. Lewatit was
used as media ion exchange resin.

PT. Biofarma

Ultraviolet Disinfections

PT. Tawakal Jaya I


Activated Carbon
Capacity : 75 m3/day
(2002)

PT. Medion

Water Softener (2002)

PT. Sari Sandang

Sand Filter Capacity : 75 m3/hour

PT. Tawekal Jaya II

Water Tretment Plant( 2004 ) Capacity 100 m3/Jam

PT. Sinar makin Mulya II

Water treatment Plant ( 2004 )Capacity 60 m3/Jam

PT. GS Battery
Demineralization Plant (2001)
Capacity : 120 m3/day

GS Battery is the biggest manufacturer of rechargeable batteries


in Indonesia.
The use of Lewatit combined with the counter-current process
give a big performance boost in demineralization water
efficiency , approx. 40% less regenerant chemicals, improved
final water quality, reduced filter sizing.

PT. Panasia

Gadjah Mada University


Wastewater Treatment Plant
(2002 2003)

Gadjah Mada University is one of the largest university in


Indonesia. The wastewater plant was needed for treating the
discharge water from laboratories. There were 9 (nine) wastewater
treatment plant for 7 deferent faculties.
Features:

Neutralization,

aeration,

sedimentation

following

with

filtration and disinfection.

Instrumentation

Faculties :Faculty Of Medicine, Faculty Of Dentistry, Faculty Of


Agriculture, Faculty Of Agricultural Technology, Faculty Of Forestry,
Faculty Of Veterinary Medicine, Faculty Of Animal Husbandry,
Integrated Labs

Gajah Mada University


Location : Yogyakarta Province
Java Island
Water Treatment Capacity 180
m3/hour (2003 - 2004)
Successful in built the wastewater treatment plant, we have been
given another responsibility to design and built of water treatment
plant. The plant was built for 2 locations of treatment plant for east
and west side of Gadjah Mada University.
Features:

Aeration, Iron & manganese removal, Activated carbon, ,


and chlorination.

Instrumentation and PLC

PDAM Kab. Pasir (Kaltim)


Location : East Kalimantan Province
Kalimantan Island
Water Treatment Capacity 180
m3/hour (2003 - 2004)
For the first time in history of indonesia, the water treatment plant
was build fully automatically operated by PLC and Scada System.
Bestindo s team involved in detail engineering and construction of
intake station,

11 Km Water transmission line, water treatment

plant 720 m3/hour,

reservoir 2000 m3 complete with pumping

system, Distribution pipe line.


The project located in East Kalimantan, the owner,PDAM Tirta
Kandio ( The Indonesian Local Government Water Authority) will
operate the systems and supply clean water for 100.000
inhabitants.

PDAM Kab. Pasir (Kaltim)


Bottling Water Plant (2003)

Capacity : 300 Bottle per hour


PDAM Kab. Pasir (Kaltim)
Revese Osmosis
Capacity : 130 m3/day
(2004 - 2005

Deltamas Industrial Estate


Wastewater Treatment plant
Capacity 400m3/day
2003-2004

The waste water treatment plant was built for Industrial waste
belonging of Deltamas industrial estate
The scope of work included the equalization tank, aeration tank,
sedimentation tank, sludge drying bed.

PDAM Kabupaten Cirebon

Upgrading Water Treatment Plant (2003)

Institute Technology Bandung


Heavy Metal Removal
(2003)

Institute Technology Bandung


Institute Technology Bandung

Batch Acid Base Neutralization (2003)


Basic Science Building A
Batch Acid Base Neutralization (2003)
Basic Science Building B

Aneka Tambang

Water Softener Capacity 2 x 50 m3/hour


Sand Filter capacity 2 x 50 m3/hour

Hyatt Hotel Bandung


Water Treatment Plant
Capacity 30 L/S
( 2005 )

Grand Hyatt Hotel is one of five star hotels in Bandung. The

plant was needed to improve standard quality of water.


The treatment consisted:
Clarifier unit, Pressure Sand Filter and Disinfection

Water Supply For Aceh


Recovery
( 2006 2007)

Awward Contract for Supply and Install 245 km PE 100 Pipe For
Aced From Glynweld Pipe Systems (as Main Contractor of JICS
(the Japan International Cooperation System)).

Water Supply For Nias

Awward Contract for Supply and Install 25 km PE 100 Pipe For

Eartquake Recovery

Nias and WTP 10 Liter/second From Glynweld Pipe Systems (as

( 2006 2007)

Dago Butik Apartment

Main Contractor of JICS (the Japan International Cooperation


System)).

Sewage Treatment Plant ( STP ) Capacity 50 m3/day (2005)

Bandung
PDAM Banjarmasin
Water Treatment Plant
Capacity : 500 l/s
(2006 2007 )

New water treatment plant was built for PDAM Bandarmasih ( The
Indonesian Local Government Water Authority), the treatment plant
consisted of 2 clarifloculators (capacity 720 m3/hours each) and 8
rapid sand filter.
Fully automation by SCADA system

Bendang 3
Water Supply System For Samarinda
City
Capacity : 400 l/s

(2009 2010)
New water supply systems Project , Owner PT. Davindo . The
systems consisted of intake station, 400l/s WTP and Reservoir.

PT. Swing Indonesia


Water Supply System For PT. Swing
Indonesia
Capacity : 10 l/s
(20012 2012)
New water supply systems 10 l/s, complete with Intake, reservoir
and Distribution.
Fully automation by PLC and HMI system

PT. Biofarma
Waste Water Effuent Recycling Plant
Capacity : 30 m3/h
(20010 2011)
Recycling plant by Ultrafiltration Membrane, water will be used for
Raw water for Biopharma Industry
Fully automation by PLC & HMI system

PT. Moya Indonesia


Water Treatment Plant
Capacity : 230 Liter/Second
(20010 2011)
UpRate Water Treatment Plant from 40 L/Sec to 230 Liter/Sec by
Hi Gate Clarifier, Loading Rate 24 m/h.
Fully automation by SCADA system

Tanjung Redep Regency


Water Supply
Capacity : 150 Liter/Second
(20010 2011)

New Water Supply System included Dam, Intake, 4 km Raw Water


Transmition, WTP (Concrete), 2500 m3 Reservoir and and 60 km
Distribution Pipe Line.
Fully automation by SCADA system

PT. Swing Indonesia


Water Supply
Capacity : 80 Liter/Second
(2012 2013)
New Hi Rate Water WTP Plant, Reservoir 3000 m3 and Other
Fasilities.
Fully automation by SCADA system

PT. Moya Indonesia


Water Supply
Capacity : 500 Liter/Second
(2012 2014) On Going
EPC Contract for New Hi Rate Water WTP Plant, Reservoir 6000
m3. Power House, Chemical Injection Plant Other Fasilities.

Fully automation by SCADA system

PT. Wijaya Karya


Basic Design
Capacity : 5000 Liter/Second
(2014 .......) On Going
Basic Design for Jatiluhur Water Treatment Plant Total
Cap. 5000 Liter/Sec. Reservoir 38000 m3 and others Facilities.
Fully automation by SCADA system

PT. Darco Indonesia

EPC Contract for New Hi Rate Water WTP Plant, Reservoir 3000
m3. Power House, Chemical Injection Plant Other Fasilities.

Water Supply
Capacity : 100 Liter/Second
(2014 .......) On Going

PT. BESTINDO PUTRA MANDIRI


Water & Process Technologies

Bandung
Terusan Buah Batu 248, West Java, Indonesia
tel: +62 22 7562836, fax: +62 21 7562820

S-ar putea să vă placă și