Sunteți pe pagina 1din 3

Published on Aug 5 2009 10:38PM GOVERNMENT OF MAHARASHTRA

Modified on Aug 5 2009 11:17PM PUBLIC WORKS DEPARTMENT


Modified on Aug 5 2009 11:22PM HARBOUR ENGINEER DIVISION (NORTH) , NAVI
Modified on Aug 10 2009 8:23PM MUMBAI
Tender Notice No 5 for Year 2009-2010

Sealed tender for the following works are invited by the Executive Engineer, Harbour Engineer, North Konkan
Bhavan,, Administrative Building 5th floor, Konkan Bhavan, C.B.D., Navi Mumbai Tel. No.-022:27571534 from
the Contractors registered with the Government of Maharashtra in appropriate class. The blank tender forms
shall be issued by Executive Engineer, Harbour Engineer, North Konkan Bhavan, from 16/7/2009 to
10/8/2009 during office hours. Sealed tender forms will be received by the authority mentioned in the table
below.

Type&Cos Time limit


Earnest
Estimated t of for Class of
Name of Work Money Tender Receiving Authority Pre Bid Details
cost Rs. Tender completion contractor
Rs.
Form (months)
Construction of anti sea Coastal Engineer, Mumbai,
erosion bund at Shiv Shkati New Administrative Office of the Coastal Engineer,
Nagar Slum behind Manora 12 Building, Near Chetna Mumbai, New Administrative
B-1 Class
Hostel in Mumbai. 91,02,379 91,500 (Including College Bandra(E) Building, Near Chetna College
10000 IV&Above
monsoon) Mumbai-51 on or before Bandra(E) Mumbai-51 on
Download Documents 14/8/2009 upto 14.00 3/8/2009 at 17.00 Hrs.
hours.
Construction of anti sea 1,03,78,269 1,00,000 B-1 12 Class Coastal Engineer, Mumbai, Office of the Coastal Engineer,
erosion bund at Navikhadi 10000 ( Including IV&Above New Administrative Mumbai, New Administrative
to Palibunder from Bhati monsoon) Building, Near Chetna Building, Near Chetna College
Bunder to Custom Light College Bandra(E) Bandra(E) Mumbai-51 on
House at Uttan Tal. & Dist.
Thane ( Ch. 0/00 to 95/00 Mumbai-51 on or before
Mt.) 14/8/2009 upto 14.00 3/8/2009 at 17.30 Hrs.
hours.
Download Documents
Construction of anti sea Coastal Engineer, Mumbai,
erosion bund at Mahatma New Administrative Office of the Chief Engineer,
Phule Nagar Cuff Pared in 12 Building, Near Chetna Special Project,P.W. Region
B-1 Class
Mumbai ( Phase-II) 1,50,68,846 1,13,500 ( Including College Bandra(E) Mumbai, Marzaban Road, Fort,
10000 III&Above
monsoon) Mumbai-51 on or before Mumbai on 3/8/2009 at 11.00
Download Documents 14/8/2009 upto 14.00 Hrs.
hours.
Construction of retaining Coastal Engineer, Mumbai,
wall with anti sea erosion New Administrative
Office of the Chief Engineer,
bund at Beach Candy Club, 12 Building, Near Chetna
B-1 Class Special Project,P.W.Region ,
Beach Candy in Mumbai. 1,71,86,073 1,29,000 ( Including College Bandra(E)
10000 III&Above Marzaban Road ,Fort, Mumbai
monsoon) Mumbai-51 on or before
on 3/8/2009 at 11.30 Hrs.
Download Documents 14/8/2009 upto 14.00
hours.
Removing sub marine rock Coastal Engineer, Mumbai,
from Navigation channel at New Administrative Office of the Chief Engineer,
Ulva Belapur in Navi 12 Building, Near Chetna Special Project, P.W.
B-1 Class
Mumbai. 2,99,37,767 1,50,000 ( Including College Bandra(E) Region,Marzaban Road, Fort,
10000 III&Above
monsoon) Mumbai-51 on or before Mumbai. On 3/8/200 at 12.00
Download Documents 14/8/2009 upto 14.00 Hrs.
hours.
Construction of anti sea
erosion Bund at Navikhadi Coastal Engineer, Mumbai,
to Palibunder from New Administrative
Office of the Chief Engineer,
Velankani Church to Bhati 12 Building, Near Chetna
B-1 Class Special Project, P.W. Region
Bunder at Uttan Tal. & Dist. 2,29,06,915 1,50,000 10000
( Including
III&Above
College Bandra(E)
,Marzaban Road, Fort, Mumbai.
Thane ( Ch. 0/00 to 195/00 monsoon) Mumbai-51 on or before
on 3/8/2009 at 12.30 Hrs.
mt.) 14/8/2009 upto 14.00
hours.
Download Documents
Construction of anti sea 2,60,84,036 1,50,000 B-1 12 Class Coastal Engineer, Mumbai, Office of the Chief Engineer,
erosion bund at Patan 10000 ( Including III&Above New Administrative Special Project, P.W.Region ,
bunder Navikhadi at Uttan Building, Near Chetna
Tal. & Dist Thane (Ch.0/00 College Bandra(E)
Marzaban Road, Fort, Mumbai
to 220/00 Mt.) monsoon) Mumbai-51 on or before
on 3/8/2009 at 13.00 Hrs
14/8/2009 upto 14.00
Download Documents hours.
Construction of anti sea Coastal Engineer, Mumbai,
erosion bund at Awas Tal. New Administrative
Office of the Chief Engineer,
Alibag Dis. Raigad. (Ch. 12 Building, Near Chetna
B-1 Class Special Project, P.W. Region
550/0 to 930/00 Mt.) 1,78,44,357 1,34,000 ( Including College Bandra(E)
10000 III&Above ,Marzaban Road, Fort, Mumbai.
monsoon) Mumbai-51 on or before
on 3/8/2009 at 13.30 Hrs.
No Attachments 14/8/2009 upto 14.00
hours.
Construction of anti sea Coastal Engineer, Mumbai,
retaining wall with Beach New Administrative
Nourishment using Geo Office of the Chief Engineer,
12 Building, Near Chetna
tube at sea shore at INS B-1 Class Special Project, P.W.Region
4,62,27,902 2,31,500 ( Including College Bandra(E)
Hamala Marve Malad in 10000 II&Above Marzaban Road, Fort, Mumbai-
monsoon) Mumbai-51 on or before
Mumbai Suburban. on 3/8/2009 at 14.00 Hrs.
14/8/2009 upto 14.00
Download Documents hours.

Detailed tender notice can be seen on the notice board in the office of the Executive Engineer,HARBOUR
ENGINEER DIVISION (NORTH) , NAVI MUMBAI .(copy can be obtained free of cost from the Executive
Engineer's office on request)

Executive Engineer
HARBOUR ENGINEER
DIVISION (NORTH) , NAVI
MUMBAI

S-ar putea să vă placă și