Sunteți pe pagina 1din 20

TCE CONSULTING ENGINEERS LIMITED

SHEET i OF i

30421007-3CL00013-P0B

4.16 kV MV CABLE
SIZING REPORT

SAUDI ELECTRICITY COMPANY


EASTERN OPERATING AREA
Dammam, Saudi Arabia
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)

DESIGN BASIS
FOR
4.16 kV MV CABLE SIZING

DOCUMENT NO : 30421007-3CL-00013-P0B
NOVEMBER 2004

ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST.MARK'S ROAD
BANGALORE 560001
INDIA

CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O.BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL.00966-1-4633660 : FAX.00966-1-4631150
P0B
01.11.2004

MP

SR

P0A
08.09.2004

MP

SR

REV NO. DATE

PREPARED BY

CHECKED BY

275167996.xls
SECTION :cover sheeet

CLEARED BY

APPROVED BY

SHEET 1 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

ARAR 4.16kV CABLE SIZING REPORT

DOCUMENT NO. 30421007-3CL-00013-P0B.

CONTENTS

SECTION

DESCRIPTION

1.0

SCOPE

2.0

STANDARDS & REFERENCES

3.0

GENERAL PARAMETERS

4.0

SIZING CRITERIA

5.0

CONCLUSION

6.0

CABLE SIZING REPORT SUMMARY

275167996.xls
SECTION :Index

SHEET 2 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

275167996.xls
SECTION :Index

SHEET 3 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT
1.0

DOCUMENT NO. 30421007-3CL-00013-P0B

SCOPE
Scope of this report is to calculate the 4.16kV Cable sizes(3.6/6kV Grade) for the following 3 cases.
CASE-1
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station
Switchgear incoming breakers.
CASE-2
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Switchgear to Station Aux Transformer T201 or T202.
CASE-3
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Switchgear to Starting Motors GT#7 or GT#8

2.0

STANDARDS & REFERENCES

2.1

IEC 60986-short circuit sizing.

2.2

IEC 60364-5-523 Selection and erection of electrical equipment-Current Carrying capacities in wiring system.

2.3

SES-P-104.03 - Cable Selection -Engineering standards.

2.4

Key One Line Diagram for Arar Plant Drawing No: KA667481 REV-P0D

2.5

SAUDI CABLE COMPANY - Medium Voltage Cables Catalogues

3.0

GENERAL PARAMETERS
- Depth of Burried Cables
- Ground Temperature at a depth of 1 meter
- Average Thermal Soil resistivity
- Ambient air Temperature
- Short Circuit current

4.0

=
=
=
=
=

1 meter
35 Deg C
2 Deg C-m/w
50 Deg C
25 kA for 3 second for CASE#1
25 kA for 1 second for CASE#2 & CASE#3

SIZING CRITERIA
The Power Cable size shall be selected on the basis of :
- Short circuit Rating.
- Current Carrying Capacity.
- Permissible Voltage Drop.

4.1

SHORT CIRCUIT SIZING.


According to SES-P-104.03 Engineering standards Cl No:4.9.6 the minimum cable cross section may be
calculated with the formula:
142 x S
I =
t
Where,
I = Maximum Allowable conductor Short Circuit Current in Amps
t = Duration of Short circuits in seconds
S = Cross Sectional Area of Current Carrying conductor in Sqmm
K = Temperature co-efficient of conductor resistance. = 142 for copper XLPE
therefore,
Ix t
S =

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 4 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT
S

DOCUMENT NO. 30421007-3CL-00013-P0B


142

FOR CASE-1
25000 x 3
142
304.930

Sqmm

Minimum nearest cable size is 400 Sqmm (Refer SAUDI CABLE COMPANY)
However,As per the Cl.No. 3.03-13 of PTS-1022, page 40 of 336, the size of cable from Station
Transformer to Station Switchgear is selected as 1C x 630 Sqmm/Phase Cu, XLPE Unarmoured.
FOR CASE-2
S

25000 x 1
142
176.056

Sqmm

Minimum nearest cable size 185 Sqmm (Refer SAUDI CABLE COMPANY)
However, as per the Cl.No. 3.03-13 of PTS-1022, page 40 of 336, the size of cable from Station
Switchgear to Station Aux Transformers T201or T202 is selected as 1C x 630 Sqmm/Phase Cu, XLPE
unarmoured.
FOR CASE-3
S

25000 x 1
142
176.056

Sqmm

Minimum nearest cable size 185 Sqmm (Refer SAUDI CABLE COMPANY)
However, as per the Cl.No. 3.03-14 of PTS-1022, page 40 of 336, the size of cable from Station
Switchgear to Starting Motor is selected as 3C x185 Sqmm, Cu, XLPE Unarmoured.

4.2

CURRENT CARRYING CAPACITY


CASE-1 from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station Switchgear incoming
breakers.
The total load current to be
carried by 4.16kV cable to
Station Switchgears

7.5 MVA
=

3 x 4.16 kV

= 1040.92Amps

CASE-2 from 4.16kV Station Switchgear to Station Aux Transformer T201 or T202.
The total load current to be
carried by 4.16kV cable to
Station Aux Transformer
T201or T202
275167996.xls
SECTION :Notes and Sizing Cal

3 MVA
=

= 416.37 Amps

SHEET 5 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT
The total load current to be
carried by 4.16kV cable to
Station Aux Transformer
T201or T202

DOCUMENT NO. 30421007-3CL-00013-P0B


=

= 416.37 Amps
3 x 4.16 kV

According to SAUDI CABLE COMPANY Catalogues for Medium Voltage Cable System,the nominal
current carrying capacities are,
FOR CASE-1 & case 2
Current Carrying capacity
Laying Conditions(in duct)
in Amps for 1C x 630
Sqmm
Laid directly in ground or duct ways, Ground
temp.in flat formation 30 DegC and Thermal
665
resistivity of soil = 1.2K m/W, depth of laying =
0.8m
Laid directly in ground or duct ways, Ground
temp.in trefoil formation 30 DegC and Thermal
resistivity of soil = 1.2K m/W, depth of laying =
0.8m

720

Current Carrying capacity


in Amps for 1C x 630
Sqmm

Laying Conditions (in Air)


Laid in Air (tray),in flat formation Ambient
Temperature 40 Deg C

980

Laid in Air (Tray), in trefoil formation Ambient


Temperature 40 Deg C

960

FOR CASE-1 & CASE-2


Derating factor Kd for 1C x 630 Sqmm Cable Laid in Duct ways :(for both Flat/trefoil formation)
-

Ground Temperature 35 DegC


K1
=
0.95
Thermal Resistivity of soil 2.0DegC m/W K2
=
0.84
Depth of Laying 1m
K3
=
0.98
Group Rating Factor
K4
=
0.80
-according to:
- installation system = spacing between two ducts(center line to center line) equl 0.3m
- No of ducts in ground = 3
Derating Factor Kd
= K1 x K2 x K3 x K4
Kd = 0.6256
Derating factor Ka for 1C x 630 Sqmm Cable installed in free air:(for both Flat/trefoil formation)
- ambient Air Temperature 50 DegC
K5
- Laying on Cable Tray(in touching form)
K6
according to:
- installation system in three phase circuits
- No of trays = 3
Derating Factor Ka
Ka

=
=

=
=

0.89
0.86

K5 x K6
0.7654

According to the above, the maximum current carrying capacity of the selected 1C x 630Sqmm cable
as follows
Maximum current carrying capacity of 1C x 630Sqmm Cable Laid in Duct ways(after considering
derating factor)
Laying cable in flat formation, current
275167996.xls
SECTION :Notes and Sizing Cal

665 x Kd =

416.05

SHEET 6 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT

DOCUMENT NO. 30421007-3CL-00013-P0B

Laying cable in trefoil formation, current

720 x Kd =

450.46

Maximum current carrying capacity of 1C x 630Sqmm cable Laid in Air(Cable Tray)


(after considering derating factor)
Laying cable in flat formation, current
Laying cable in trefoil formation, current

=
=

980 x Ka =
960 x Ka =

750.09
734.78

FOR CASE-1 (From Station Transformer to Staion Switchgear incoming breakers)


As per above calculation, 3-Nos of 1C x 630 Sqmm/Phase cable can carry the required load current
of 1040.96Amps under all site conditions when cable laid in duct ways.
As per above calculation, 2-Nos of 1C x 630 Sqmm/Phase cable can carry the required load current
of 1040.96Amps under all site conditions when cable laid in Air(Cable Tray)
FOR CASE-2 (From Station Switchgear to Station Aux Transformer)
Also as per above calculation,1C x 630 Sqmm/Phase cable can carry the required load current
of 416.37 Amps under all site conditions.

CASE-3 from 4.16kV Station Switchgear to Starting Motor GT#7 or GT#8


The total load current to be
carried by 4.16kV cable to
starting motors

596.8kW
=

3x4.16x0.85x0.95

The cable selected as 3C x 185 Sqmm size)


Laying Conditions(in duct)
Laid directly in ground or duct ways, Ground
temp.30 Deg C and Thermal resistivity of soil =
1.2K-m/W, depth of laying = 0.8m

Laying Conditions (in Air)


Laid in Air (tray),in Ambient Temperature 40 Deg
C

= 102.575 Amps

Current Carrying capacity


in Amps for 3C x 185
Sqmm
380

Current Carrying capacity


in Amps for 3C x 185
Sqmm
410

The following Derating factors have been considered as per SAUDI CABLE COMPANY Catalogues
for the site conditions specified:
Derating factor Kd for 3C x185 Sqmm Cable Laid in Duct ways :
- Ground Temperature 35 DegC
K1
=
0.95
- Thermal Resistivity of soil 2.0Deg C-m/W K2
=
0.87
- Depth of Laying 1m
K3
=
0.99
- Group Rating Factor
K4
=
0.90
-according to:
- installation system = spacing between two adjacent (center line to center line) ducts equal 0.3m
- No of ducts in ground = 2
Derating Factor Kd
= K1 x K2 x K3 x K4
Kd = 0.7364

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 7 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT

DOCUMENT NO. 30421007-3CL-00013-P0B

Derating factor Ka for 3C x185 Sqmm Cable installed in free air:


- ambient Air Temperature 50 DegC
K5
- Laying on Cable Tray(in touching form)
K6
according to:
- installation system in three phase circuits
- No of trays = 3
Derating Factor Ka
Ka

=
=

=
=

0.89
0.7

K5 x K6
0.6230

According to the above, the maximum current carrying capacity of the selected 3C x 185 Sqmm cable
as follows
Maximum current carrying capacity of 3C x 185 sqmm Cable Laid in Duct ways(after considering
derating factor)
Laying cable in duct, current

380 x Kd =

279.84

Maximum current carrying capacity of 3C x 185 Sqmm Cable Laid in Air(Cable Tray)
(after considering derating factor)
Laying cable in Cable Tray, current

410 x Ka =

255.43

From 4.16kV Station Switchgear to Starting motor


As per above calculation,3C x 185 Sqmm cable size can carry the required load current
of 102.575 Amps under all site conditions.

4.3

VOLTAGE DROP SIZING


The Voltage drop check is calculated as follows :
=
V%
3 x(RCOS + XSIN) x I x L x 100 /Un for three phase system
Where,
FOR CASE-1
FOR CASE-2
1C x 630
1C x 630
COS
=
Power Factor
= 0.8
0.8
SIN
=
= 0.6
0.6
Full load Current in A =
I
=
520.46
416.37
L
=
Length in Km
= 0.05
0.075
Un
=
Cable Voltage in V = 4160
4160
R
=
0.0434
Resistance /Km = 0.0434
X
=
0.11
Reactance /Km = 0.11
The Voltage Drop for CASE-1 from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station
Switchgear incoming breakers.
V%
=
0.109 % Volts
Hence, Voltage drop is within the limits.

which is < 5%

The Voltage Drop for CASE-2 from 4.16kV Station Switchgear to Station Aux
Transformer T201 or T202.
=
0.131 % Volts
V%
Hence, Voltage drop is within the limits.

which is < 5%

FOR CASE-3 from 4.16kV Station Switchgear to Starting Motor GT#7 or GT#8
The Voltage drop check is calculated as follows:
275167996.xls
SECTION :Notes and Sizing Cal

SHEET 8 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT

During starting
=
V%
Where,
Un
=

DOCUMENT NO. 30421007-3CL-00013-P0B

3 (I1Z1L1 + I2Z2L2)x100/Un
Voltage in V

4160

I1 is the current of Station Transformer


Secondary side cable

I1 = I2 + Base load on 4.16kV SWGR

I2 is the current of Station SWGR to Motor


Cable during starting condition.

I2 = 6 times the motor full load current =6x102.575 = 615.45 A

Base Load on 4.16kV SWGR

= 1941.5kVA

Base Load in Amps

= 269.46

Therefore, 615.45 + 296.46

I1 =

884.91 Amps

I2 =

615.45 Amps

Refer Cl.No.5.2.2 ,page 6 of 8 of Doc


No:30421007-3CL-00006-P0A 33/4.16kV
Station Transformer sizing Report

Z1 is Impedance of Station Transformer


Secondary side cable ie., 1C x 630 Sqmm

Z1 = R1COS1 + X1SIN1

Z2 is Impedance of Station Swgr to Motor


cable. ie., 3C x 185 Sqmm

Z2 = R2COS2 + X2SIN2

Power Factor for starting COS =


SIN =
1C x 630 Sqmm Cable Length in km
R1
=
Resistance /Km
X1

Reactance /Km

3C x 185 Sqmm Cable Length in km


R2
=
Resistance /Km
X2

Reactance /Km

L1 =

0.2
0.98
0.05

0.0434

0.11

L2 =

0.2

0.129

0.1

Z1 =

0.12

Z2 =

0.12

The Voltage drop in cable from secondary of station Transformer to 4.16kV Motor terminal during starting
condition of 4.16kV Motor
V%

0.849 % Volts

During Running
3 (I1Z1L1 + I2Z2L2)x100/Un
=
V%
Where,
I1 is the current in Station Transformer
I1 = I2 + Base load on 4.16kV SWGR
Secondary side cable
I2 is the current in Station SWGR to Motor
I2 = Motor full load current = 102.575amps
Cable during running
275167996.xls
SECTION :Notes and Sizing Cal

SHEET 9 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT

DOCUMENT NO. 30421007-3CL-00013-P0B

Power Factor for Running COS =


SIN =

0.85
0.53

I1 =

372.035

I2 =

102.575

Z1 =

0.09

Z2 =

0.16

The Voltage drop during running condition of 4.16kV Motor


V%

5.0

0.212 % Volts

CONCLUSION
CASE-1
From Station Transformers T 401 or T 402 to Station switchgear incoming breakers
3/6 kV Grade, XLPE insulated, Copper Conductor of size 3Nos-1C x 630 Sqmm/Phase,
Unarmoured cable has been selected based on the above calculations when cable laid in duct ways.
From Station Transformers T 401 or T 402 to Station switchgear incoming breakers
3/6 kV Grade, XLPE insulated, Copper Conductor of size 2Nos-1C x 630 Sqmm/Phase,
Unarmoured cable has been selected based on the above calculations when cable laid in Air (Cable Tray).
CASE-2
From Station Switchgear to Station Aux Transformers T 201 or T 202
3/6 kV Grade, XLPE insulated, Copper Conductor of size 1C x 630 Sqmm/Phase, Unarmoured
cable has been selected based on the above calculations.

CASE-3
From 4.16kV Station Switchgear to Starting motors GT#7 & GT#8
3.6/6 kV Grade, XLPE insulated, Copper Conductor of size 3C x 185 Sqmm, Unarmoured
cable has been selected based on the above calculations.

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 10 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
ARAR 4.16 kV CABLE SIZING REPORT

275167996.xls
SECTION :Notes and Sizing Cal

DOCUMENT NO. 30421007-3CL-00013-P0B

SHEET 11 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

V Grade) for the following 3 cases.

mer T 401 orT 402 to 4.16kV Station

ear to Station Aux Transformer T201 or T202.

ear to Starting Motors GT#7 or GT#8

urrent Carrying capacities in wiring system.

V-P0D

as per Cl.No.4.01.1 page 70 of


336, Cl.No.4.01.2 page 71 of
336 of PTS - 1022

nd for CASE#1
nd for CASE#2 & CASE#3

e minimum cable cross section may be

t Circuit Current in Amps

rying conductor in Sqmm


or resistance. = 142 for copper XLPE

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 12 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

the size of cable from Station


/Phase Cu, XLPE Unarmoured.

the size of cable from Station


as 1C x 630 Sqmm/Phase Cu, XLPE

the size of cable from Station


XLPE Unarmoured.

6kV Station Switchgear incoming

former T201 or T202.

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 13 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

Voltage Cable System,the nominal

for both Flat/trefoil formation)

center line) equl 0.3m

(for both Flat/trefoil formation)

as per IEC 60364-5-523


table 52-E5

the selected 1C x 630Sqmm cable

Laid in Duct ways(after considering

Amps
275167996.xls
SECTION :Notes and Sizing Cal

SHEET 14 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B


Amps

Laid in Air(Cable Tray)

Amps
Amps

oming breakers)
can carry the required load current

can carry the required load current

arry the required load current

DI CABLE COMPANY Catalogues

e to center line) ducts equal 0.3m

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 15 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

as per IEC 60364-5-523


table 52-E4

the selected 3C x 185 Sqmm cable

Laid in Duct ways(after considering

Amps

Laid in Air(Cable Tray)

Amps

required load current

three phase system


Note:
For Case-1:
The full load current for
2Runs of 1Cx630Sqmm/phase
is 1040.92A. Hence for 1Run
of 1Cx630Sqmm/phase is
considered as 1040.92/2 =
520.46Amps

r T 401 orT 402 to 4.16kV Station

r to Station Aux

or GT#7 or GT#8

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 16 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

n 4.16kV SWGR

or full load current =6x102.575 = 615.45 A


Refer Cl.No.5.2.2 ,page 6 of 8 of Doc
No:30421007-3CL-00006-P0A 33/4.16kV
Station Transformer sizing Report

to 4.16kV Motor terminal during starting

n 4.16kV SWGR

urrent = 102.575amps

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 17 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

ncoming breakers
s-1C x 630 Sqmm/Phase,
lations when cable laid in duct ways.

ncoming breakers
s-1C x 630 Sqmm/Phase,
lations when cable laid in Air (Cable Tray).

630 Sqmm/Phase, Unarmoured

x 185 Sqmm, Unarmoured

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 18 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)

DOCUMENT NO. 30421007-3CL-00013-P0B

275167996.xls
SECTION :Notes and Sizing Cal

SHEET 19 OF 20

GENERATION EXPANSION OF ARAR POWER PLANT


(CONTRACT NO : 30421007/00)
6.0 CABLE SIZING REPORT SUMMARY

ARAR 4.16kV CABLE SIZING REPORT


SL
NO.

FEEDER DESCRIPTION

DOCUMENT NO. 30421007-3CL-00013-P0B

LOAD

VOLTAGE

kVA / kW

VOLTS

FULL
LOAD
CURRENT CARRYING CAPACITY OF CABLE (SINGLE
CABLE SIZE SELECTED
CURRENT
RUN)
IFL
AMPS

SQ.MM
IN DUCT
BANKS

IN AIR

DERATING FACTOR

CURRENT CARRYING CAPACITY OF


CABLE AFTER DERATING FACTOR (SINGLE RUN)

CABLE LAID IN AIR(CABLE CABLE LAID IN DUCT CABLE LAID IN AIRCABLE LAID IN DUCT
CABLE LAID IN AIR(CABLE
BANKS
CABLE TRAYS
TRAY)
BANKS
TRAY)
(IN BOTH
(IN
FLAT/TREFOIL
BOTH FLAT/TREFOIL
IN FLAT
IN TREFOIL
IN FLAT
IN TREFOIL
IN FLAT
IN TREFOIL
IN FLAT
IN TREFOIL
FORMATION)
FORMATION)
FORMATION FORMATION FORMATION FORMATION
FORMATION FORMATION FORMATION FORMATION
CABLE LAID IN DUCT
BANKS

LENGTH
OF
CABLE

% VOLTAGE
DROP

KM

CASE-1
STATION TRANSFORMER T401 or
T402 TO STATION SWITCHGEAR
INCOMING BREAKERS (Load in
kVA)

7500

4160

1040.93

3 RUNS OF 2 RUNS OF
1C X
1C X
630 sqmm / 630 sqmm /
phase
phase

665.00

720.00

980.00

960.00

0.6256

0.7654

416.02

450.43

750.09

734.78

0.05

0.109

CASE-2
STATION SWITCHGEAR TO LV
STATION AUX TRANSFORMER
T201or T202 (Load in kVA)

3000

4160

416.37

I RUN OF
1C X 630
sqmm /
phase

665.00

720.00

980.00

960.00

0.6256

0.7654

416.02

450.43

750.09

734.78

0.075

0.131

CASE-3
STATION SWITCHGEAR TO
STARTING MOTORS GT#7 or
GT#8 (Load in kW)

596.8

4160

102.58

1 RUN OF 1 RUN OF
3C X 185
3C X 185

0.7364

0.6230

275167996.xls
SECTION :Cable Sizing Report Summary

I RUN OF
1C X 630
sqmm /
phase

380.00

410.00

279.83

255.43

0.2

for starting = 0.85


for running
= 0.21

SHEET 20 OF 20

S-ar putea să vă placă și