Objetivo
PIERINA
Pierina
Aerofotogrfica
Faja
Carretera
Jangas - Mina
Tajo
Transportadora
Silo de Mineral
Pila de
Lixiviacin
por Relleno
de Valle
Talleres /
Oficinas /
Almacenes
Planta
Merrill-Crowe
Pierina al Cierre
PIERINA
Al Final:
Pila de Lixiviacin
Botadero de Desmonte
Tajo
Whitttle
Qpit
UNIT
g/t
US$/oz
US$/oz
%
%
%
%
US$/t ore
US$/t ore
US$/t ore
US$/t ore
US$/t ore
US$/t ore
US$/oz
US$/oz
US$/oz
US$/oz
m.a.s.l
m.a.s.l
US$/t
US$/t
US$/t
US$/t
US$/t
US$/t
MedSystem
Excel
Access
76
0.52
6.21
78
0.45
7.28
20
0.52
2.13
2
0.59
3.39
11
0.44
3.90
25
0.44
5.07
18
0.45
2.56
9
0.46
9.61
11
0.45
2.60
6
0.42
1.97
12
0.44
1.58
310
0.496
6.231
1,027
2.22
10.02
1,037
2.13
12.50
924
2.54
14.58
1,057
2.52
16.98
1,070
2.35
16.88
1,119
2.77
20.27
1,112
2.99
21.52
1,068
2.09
18.33
1,105
2.87
15.23
993
3.39
16.98
752
2.73
12.97
12,311
2.59
15.52
2,306
3,308
2,057
3,008
2,134
3,093
2,060
2,964
2,651
3,706
2,600
3,658
2,631
3,725
2,629
3,724
2,546
3,605
2,630
3,724
2,360
3,347
2,346
3,087
28,950
40,950
Average Ktonnes/Plan
Average Ktonnes Mine
32.9
75.6
34.0
73.5
30.9
68.8
30.1
68.7
34.0
85.5
35.3
86.7
35.3
84.9
35.3
84.8
35.3
84.9
35.3
84.8
32.9
78.7
23.9
75.7
32.9
79.4
71
57
417
121
75
60
433
130
86
68
577
173
81
65
580
185
100
81
729
233
107
86
769
246
72
58
629
201
102
82
541
173
108
87
542
173
66
53
314
100
1,027
825
6,141
1,912
El presupuesto del ao en curso es un documento que contiene datos tales como las producciones de mineral, desmonte,
leyes, cantidad de metal, recuperaciones en planta, radios de desbroce, etc. A partir de este documento se realizan los
planes mensuales.
Fase I
Recoleccin de data a tiempo real, a travs del sistema Dispatch
Con 02 repetidoras que cubren las zonas de operacin diaria.
Fase III
Fase II
Fase I
Para el Levantamiento y Replanteo se usa los GPS con una precisin de +-0.10 m, y con el
uso de las memorias DIIM obtenemos los datos en tiempo real. Los monitoreos con
Estacin Total de precisin +-0.01 cm.
Fase II
138,397
279,934
W ASTE E
314,539
237,535
276,668
318,165
235,168
276,665
HUMEDAD ESTIMADA
% =
6.32
Date
1-Sep
6-Sep
7-Sep
8-Sep
9-Sep
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
19-Sep
20-Sep
21-Sep
22-Sep
23-Sep
24-Sep
25-Sep
26-Sep
27-Sep
28-Sep
29-Sep
30-Sep
Day
domingo
viernes
sabado
domingo
lunes
martes
miercoles
jueves
viernes
sabado
domingo
lunes
martes
miercoles
jueves
viernes
sabado
domingo
lunes
martes
miercoles
jueves
viernes
sabado
domingo
lunes
TOTAL
Fore ca st Re v. 2 (w e t
DIFF.
W ET TONNES
24,486
5,710
8,280
34,588
40,191
49,628
17,933
39,335
48,980
47,089
42,964
42,133
41,500
27,668
41,500
41,500
41,500
41,500
41,500
41,500
27,668
41,500
41,500
41,500
41,500
41,500
954,653
980,400
(25,747)
TO CRUSHER (PROCESS)
WASTE
TOTAL
Hum
2.90
2.45
0.45
955,300
1,130,400
-175,100
2.90
2.45
0.45
12.38
18.40
(6.02)
83,530
83,413
117
1,354,300
1,388,300
(34,000)
%
6.81
5.45
5.45
3.65
3.65
4.70
5.56
8.34
5.12
5.79
5.99
5.80
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
6.32
2,309,600
2,418,700
(409,100)
5.84
AU
AG
Plan
Plan
Plan
Plan
de
de
de
de
perforacin y disparo
pilas de lixiviacin
botaderos
Construccin, remediacin, drenajes etc..
4060-21
25,530
5,735
7,548
34,556
19,074
305
4070-20
20,996
50,211
18,222
39,432
47,757
47,030
42,780
7,792
41,500
4080-21
35,258
27,668
41,500
41,500
41,500
41,500
41,500
41,500
27,668
41,500
98,289
104,000
(5,711)
3.71
13.48
315,720
334,000
(18,280)
381,094
347,000
34,094
3.95
9.09
2.38
14.50
LOADING ASSUMPTIONS
TYPE
Loader
Ore Bin
Crusher
Speed (km/hr)
28.0
28.0
19.2
14.4
24.2
100%
93%
85%
Load time
2.85
1.50
2.50
Spot-Queue
0.98
1.50
1.00
TRUCK MECHANICALS
Tonnes per truck ~ 136- 8 un
Tonnes per truck ~ 145 - 4 un
Average tonnes per truck
Truck Availability
Truck Utilization
Truck Usage
Dump
1.49
1.50
2.46
level
3980
3970
3960
3870
3860
3850
4060
3980
3970
3870
3860
4060
3980
3970
3870
3860
4060
3980
3970
3870
3860
4133
Total
Material
ORE
ORE
ORE
ORE
ORE
ORE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
WASTE
ORE-BIN
May-02
Tonnes
94,428
644,849
90,329
60,805
97,585
99,905
16,618
50,210
22,538
21,802
612,143
51,841
55,560
94,068
121,803
93,375
1,087,901
3,315,760
Pit Exit
3970R
3970R
3970R
3920R
3920R
3920R
4090E
4040E
3970E
3920R
3920R
4090E
4040E
3970E
3920R
3920R
4090E
4040E
3970E
3920R
3920R
4133OB
Road
Dump
Dump One-way travel
Dist
Lift
Dist
Dist
time
510
3935
0
1236
5.5
510
3935
0
1189
5.1
510
3935
0
1032
5.2
487
3935
0
1490
9.3
487
3935
0
1506
9.9
487
3935
0
1573
10.8
833
4075
1978
3106
16.3
1696
3975
1050
3874
23.1
2109
3975
1050
3592
22.7
3760
3975
1050
5813
36.7
3760
3975
1050
5829
37.4
833
4075
1978
3106
16.3
1696
4055
950
3774
20.6
2109
4055
950
3492
20.2
3760
4055
950
5713
34.2
3760
4055
950
5729
34.9
833
4075
1978
3106
16.3
1696
4055
950
3774
20.6
2109
4055
950
3492
20.2
3760
4055
950
5713
34.2
3760
4055
950
5729
34.9
0
4080
1250
1250
5.8
1038
746
2244
12.3
calibrate
d cycle Required Required
time
Hours
Trucks
14.3
159
0.3
13.9
1050
1.7
13.9
148
0.2
18.0
129
0.2
18.7
214
0.3
19.6
229
0.4
24.2
0
0.0
31.0
60
0.1
30.6
181
0.3
44.6
0
0.0
45.3
0
0.0
24.2
64
0.1
28.5
73
0.1
28.1
2022
3.3
42.1
256
0.4
42.8
279
0.5
24.2
0
0.0
28.5
0
0.0
28.1
311
0.5
42.1
602
1.0
42.8
469
0.8
10.8
1277
2.1
19.6
7524
12.2
SEM 01:
BENCH
TM
4170
4160
4150
4140
4130
4120
4060
4020
3960
3950
3940
3930
3920
3860
3850
3840
Ore to Crusher
Au
Ag
50,000
0.98
1.14
68,000
80,000
116,000
3.20
12.54
41,500
2.80
67.00
2.59
20.69
5,000
78,500
15,000
Stock to Crusher 2
TOTAL
207,500
153,000
93,500
TOTAL
TM
118,000
80,000
199,500
15,000
41,500
454,000
Note (Sugestion)
OCS/MODEL
OCS\MODEL
OCS/MODEL
OCS\MODEL
OCS\MODEL
803
Cumplir el presupuesto (Budget) aprobado por la Coorporacin. Tal como: cantidad de metal a
producir, tonelaje de mineral y desmonte, Relacin de calidades de Mineral y Desmonte.
Mantener un tajo flexible para obtener buen rendimiento del equipo.
Planificar el minado segn los requerimientos de materiales y supervisar la calidad del material que
se enva a la cancha de lixiviacin para asegurar la percolacin.
Planificar para el cumplimiento del planeamiento de mediano y largo plazo, el cual esta vinculado al
planeamiento estratgico de la gerencia.
Cumplir el pronostico del mes en curso (forecast).
EVALUACION
Plan Mensual/Semanal
EVALUACION SEM ANAL : M ine ral - De s m onte
120,000
100,000
TN
80,000
60,000
40,000
20,000
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
11-Dec
12-Dec
13-Dec
14-Dec
15-Dec
16-Dec
17-Dec
Plan. Mineral
36283
36283
36283
15800
25479
30371
36283
Minado. Mineral
37390
35000
36100
15130
29347
30669
28099
Plan Desmonte
45284
66500
66500
66500
66892
57108
45284
52606
96451
73107
74903
63456
62368
65798
Plan. Mineral
Minado. Mineral
Plan Desmonte
100
90
80
70
60
50
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec
10-Dec
4-Dec
5-Dec
6-Dec
7-Dec
8-Dec
9-Dec
10-Dec
89
89
89
89
89
89
89
Util.Plan
92.2
92.2
92.2
92.2
92.2
92.2
92.2
Disp.
68.5
97.3
98
83
88.3
98.8
98.1
Util.
91.9
83.2
97.3
93.9
97.6
96.8
88.4
Disp. Plan
Util.Plan
Disp. Plan
Disp.
Util.
Dia
Perf.1
Perf.2
3850W
Miercoles
04-Sep Mineral/Desmonte
Jueves
05-Sep
Viernes
06-Sep
Sabado
07-Sep
Domingo
08-Sep
Lunes
09-Sep
Martes
10-Sep
Miercoles
11-Sep
DISPARO
Perf.3
4160W Mineral
"Trim"
3930W
Mineral
4160W,4140E
4140E Desmonte
3940E,3930W,38
50W
3850W
Mineral
3920W
Mineral/Desmonte
4140E,3920W
Dia
Celda
Const
Miercoles
04-Sep
4060-21
Jueves
05-Sep
Viernes
06-Sep
Sabado
07-Sep
Domingo
08-Sep
Lunes
09-Sep
Martes
10-Sep
Miercoles
11-Sep
4070-20
Dia
Miercoles 04-Sep
Jueves
05-Sep
Viernes
06-Sep
Sabado
07-Sep
Domingo
08-Sep
Lunes
09-Sep
Martes
10-Sep
Miercoles 11-Sep
Roca
Finos
Arcilla
RPA.
CONSTRUCCION.
4115W
4115
4095
4095
4035
3975
CONCLUSIONES
Los modelos de optimizacin del Plan de Minado, permiten
la explotacin racional del yacimiento, recuperando la
mxima reserva al mnimo costo.
Las modernas tecnologas hoy disponibles que reportan
informacin en tiempo real, requieren el imprescindible
soporte informtico para el adecuado uso de la informacin
y la oportuna toma de decisiones.
El manejo de un Plan Automatizado de Minado Diario,
es el nuevo reto del ingeniero de hoy y del futuro.