Sunteți pe pagina 1din 14

1

M ID H A N I

MISHRA DHATU NIGAM LIMITED


P.O.KANCHANBAGH, HYDERABAD

Part-II (Price Bid)

CONSTRUCTION OF OVERHEAD TANK AT


UTILITY SYSTEMS OF MELT SHOP IV

Employer

Contractor

2
PROJECTS MANAGEMENT OFFICE
Tender Notice No: MDN/PMO/CVL/13-14/O.H.TANK
To,

Date: - 14-09-2013

Dear Sir,
Sub: - CONSTRUCTION OF O VE R H E AD TAN K AT UTILITY SYSTEMS OF MELT
SHOP IV AT MIDHANI - reg
1. Please find enclosed here with a Tender Enquiry for the above, you are

2.
3.

4.
5.
6.

7.
8.

9.

requested to furnish your offer in a sealed cover subscribing the envelop with
name of work and last date of Submission, along with EMD of
Rs 2.9 lakhs drawn in favour of MIDHANI. The tenders without EMD
amount will be rejected; request for adjustment from pending bills will not
be entertained. Estimated Value Rs 115 lakhs.
Tender shall be submitted in
tender box kept at Corporate office on or
before 18/10/13 up to 10.00 hrs.
The period of completion of job will be 330 days from the date of signing the
contract agreement as per (ref page no. 4, clause no. (2)) part -I of technical bid.
Time is essence of the contract; contractor has to mobilize materials & labour to
complete within 330 days time period.
The tenderer shall inspect the site of work and understand the scope of work
before quoting.
All materials required for the work shall be arranged by the contractor unless until
specified in Bill of Quantities.
This is an item rate contract and the quantities are approximate, but payment will
be made only on actual work done based on joint measurement. MIDHANI
reserves the right to operate or delete any item in the BOQ.
You will be paid 8 R.A bills and one Final Bill only.
a) The 8 R.A bills will be paid with 50% advance without checking within 7days &
balance amount within 15 days from the date of certificate of Engineer-in-charge.
However, Final payment will be made within 30 days after satisfactory completion
of work and certification by Engineer-in-charge.
b) Apart from the RA bills for the work done, the contractor will be paid material
advance against material brought to the site at the rate of 75% of purchased bill
cost for structural steel, TMT reinforcement and cement 53 grade brought to the
site. However, while issuing advance to steel (reinforcement/structural) Engineerin-charge holds the right to reduce 20% of quantity brought to the site and to limit
within BOQ value.
The work shall be carried out as per MES-SSR-2009 specifications.

Employer

Contractor

3
10. Security Deposit should be in the form by for 10% value of contract and the same
should be submitted within the 15 days from the date of signing of contract
should be valid till completion of contract along with 3 months claim period.
11. The security and safety rules of MIDHANI to be followed. The contractor shall
take care of all labour laws regarding minimum wages, ESI, PF., Group
Insurance, CAR ( Contractors all risk policy) etc., MIDHANI is no way responsible
in this respect. MIDHANI is not liable for any claim in respect of any accidents or
otherwise excepting to the extent of work completed as per the contractor.
12. MIDHANI reserves the right to split the tender in order to expedite the work within
contract period specified in the document.
13. MIDHANI reserves the right to operate partial or delete any item specified in
BOQ without any compensation to contractor for the items non operated or
deleted.
14. You should not cause any loss or damage to MIDHANI property / or personnel, if
any loss or damage is caused the cost of the same will be recovered from your
bills cost of loss or damage will be deducted by MIDHANI, which will be final.
15. If the work is abandoned / stopped without bringing proper notice to Engineer-incharge, your contractor will be terminated and balance work will be carried out at
the cost and risk of contractor.
16. Liquidated Damages: - If the work is not completed within stipulated time.
Liquidated damages at 0 .1% per day delay up to maximum of 10% total value
will be deducted. MIDHANI management reserves the right to wave the LD as per
the conditions expressed in Technical bid.
17. The offer shall be valid for 3 months from the date of opening of tender.
18. Interested parties may attend tender opening on 18/10/13 at 11.00 hrs.
19. Incomplete or partially filled tenders will be rejected. MIDHANI reserves the right
to accept or reject any or all tenders without assigning any reason.
20. In case of successful tender all material bills shall be submitted along with final
bills.
21. Please submit detailed construction programs on a Bar-Chart within a week
time from the date of receipt of work order.
Yours faithfully,
For Mishra Dhatu Nigam Limited

General Manager (Projects)


DECLARATIONS: - 1) I have seen the site and understood the full scope of work.
2) I agree to return all the documents along with this offer.
3) Any information provided by contractor found to be false (at any
stage), MIDHAI is empowered to take action as per company rules.

CONTRACTOR
SIGNATURE AND SEAL
PS:- Interested may attend pre bid meeting on 30/9/13 at 11.00Hrs in the office of
D.G.M ( Projects)

Employer

Contractor

4
This tender covers the structural & civil details for the emergency over head tank:

EMERGENCY OVER HEAD TANK: This is a RCC structure with a conical funnel shaped
tank at a approximate height of 45.00m from ground. The storage capacity of tank is
225m3. The tank will store the raw water which will be used to meet the emergency
requirements of utility system during power failure. The tank is supported on a RCC shaft
with ID as 5.00mt & OD as 5.70 mt. The shaft is having a security watch tower at an El.
10.200mt. the shaft also has structural steel internal maintenance platforms at regular
interval of 4.40 mt along the shaft height. It is proposed to construct the shaft using
Conventional method of construction.
The item wise approximate quantities for the above mentioned overhead tank are as given
in the below table.

Employer

Contractor

MISHRA DHATU NIGAM LIMITED


NAME OF THE WORK: CONSTRUCTION OF OVERHEAD TANK AT UTILITY

SYSTEMS OF MELT SHOP IV


SUB HEAD: CIVIL & STRUCTURAL WORKS
S.No

Description of Work

Unit

Qty

a) Earth work excavation by mechanical


means
(hydraulic
excavator),Chisel
cutting, Pneumatic Concrete breakers
and manual means over areas including
disposal of excavated earth, lead upto
50m and lift upto 1.5m, disposed earth/ to
be leveled and neatly dressed. Maximum
depth of excavation is upto -4.50 mtr
from FFL.
a) Hard Rock Excavation up to 1.5m
depth

Cum

60

Cum

78

Cum

78

d) Hard/ dense soil Excavation up to


1.5m depth

Cum

85

e) Hard/ dense soil Excavation 1.5m to


3.0m depth
. Excavation 3.0 to
f) Hard/ dense soil

Cum

52

Cum

52

Cum

316

Cum

30

b)

Hard Rock Excavation 1.5m to


3.0m depth
.c) Hard Rock Excavation 3.0 to 4.5m
depth

4.5m depth

Refilling to the excavated earth in


sides of foundations, in layers not
exceeding 25cm in depth, consolidating
each deposited layer by ramming &
watering, lead up to 50m & lift up to 1.5m
in all depths.
Refilling, spreading , leveling in floors
above footing mat, in layers not
exceeding 25cm in depth, consolidating
each deposited layer by ramming &
watering, lead up to 50m & lift up to 1.5m
in all depths.

Employer

Rate in
Rs

Amount in
Rs.

Contractor

a) Shifting of the excavated hard rock up


to lead of 0.5Kms - Carrigage/Carting
of soil/murrum/rock brought from
excavated
pits
by
mechanical
transport including loading, unloading
& stacking for the required areas (up
to 0.5 Km).

Cum

100

b) Shifting of the excavated hard soil up


to lead of 0.5Kms - Carrigage/Carting
of soil/murrum/rock brought from
excavated
pits
by
mechanical
transport including loading, unloading
& stacking for the required areas (up
to 0.5 Km).

Cum

60

Sand filling under floors or in foundations


including watering and consolidation.

Cum

15

PCC 1:2:4:Providing & laying in


position cement concrete of M15 grade
excluding the cost of centering &
shuttering as leveling course under
foundations, flooring with 40 mm metal
including compaction, curing, levelling
( 1 cement, 2 coarse sand, 4 graded
stone aggregate 40mm nominal size).

Cum

13

a) Footings & foundations 0.0 to -4.5m

Cum

200

b) Pedestal for Shell

Cum

35

a) Concrete for RCC shell from 0.0 to


+7.50m lvl.

Cum

45

b) Concrete for RCC shell from +7.5 to


+15.0m lvl.

Cum

45

Providing & laying Cast-in-situ RCC


M30 Design Mix RMC of specified grade
excluding the cost of centering &
shuttering all work up to plinth level
including cost of mixing, placing,
compaction,
vibration,
pumping,
consolidation, curing complete, etc

Providing & laying Cast-in-situ RCC


M30 Design Mix RMC of specified grade
for RCC Shell, excluding the cost of
centering & shuttering all work including
cost of mixing, placing, compaction,
vibration, pumping, consolidation, curing
complete, etc

Employer

Contractor

c) Concrete for RCC shell from +15.0 to


+18.0m lvl.

Cum

18

d) Concrete for RCC shell from +18.0 to


+21.0m lvl.

Cum

18

e) Concrete for RCC shell from +21.0 to


+24.0m lvl.

Cum

18

f) Concrete for RCC shell from +24.0 to


+27.0m lvl.

Cum

18

g) Concrete for RCC shell from +27.0 to


+30.0m lvl.

Cum

18

h) Concrete for RCC shell from +30.0 to


+33.0m lvl.

Cum

18

i) Concrete for RCC shell from +33.0 to


+36.0m lvl.

Cum

18

j) Concrete for RCC shell from +36.0 to


+39.0m lvl.

Cum

18

k) Concrete for RCC shell from +39.0 to


+42.0m lvl.

Cum

18

l) Concrete for RCC shell from +42.0 to


+45.0m lvl.

Cum

18

m) Concrete for RCC shell from +45.0 to


+48.0m lvl.

Cum

a) Concrete for RCC Conical shell from


+45.0 to +48.0m lvl.

Cum

32

b) Concrete for RCC Conical shell from


+48.0 to +51.0m lvl.

Cum

20

c) Concrete for RCC Conical shell from


+51.0 to +54.0m lvl.

Cum

14

Providing & laying Cast-in-situ RCC


M30 Design Mix RMC of specified grade
for RCC domes, shell roofs, Vaults etc,
excluding the cost of centering &
shuttering all work including cost of
mixing, placing, compaction, vibration,
pumping, consolidation, curing complete,
etc

Employer

Contractor

10

11

Providing & laying Cast-in-situ RCC


M30 Design Mix RMC of specified grade
for RCC Fins, fascias, parapets etc,
excluding the cost of centering &
shuttering all work including cost of
mixing, placing, compaction, vibration,
pumping, consolidation, curing complete,
etc

Cum

a) Concrete for RCC Ring Beam &slab


at +45.0 lvl.

Cum

20

b) Concrete for RCC Ring Beam at


+49.195 m lvl.

Cum

19

Providing & laying Cast-in-situ RCC


M30 Design Mix RMC of specified grade
for RCC Ring beams, slabs etc.
excluding the cost of centering &
shuttering all work including cost of
mixing, placing, compaction, vibration,
pumping, consolidation, curing complete,
etc

c) Concrete for RCC Top slab at +53.025


m lvl.
12

Providing & fixing centering & shuttering


including strutting, propping etc., &
removal of form for:
a) Foundations, footings, bases
Shell etc., for mass concrete.

13

Cum

of
Sqm

228

Sqm

252

Sqm

252

Sqm

102

Sqm

102

Sqm

102

Sqm

102

Sqm

102

Providing
&
fixing
conventional
centering & shuttering including strutting,
propping etc., & removal of form for:
a) Shuttering for Shell wall from 0.0 to
+7.5m lvl
b) Shuttering for Shell wall from 7.5 to
+15.0m lvl
c) Shuttering for Shell wall from 15.0 to
+18.0m lvl
d) Shuttering for Shell wall from 18.0 to
+21.0m lvl
e) Shuttering for Shell wall from 21.0 to
+24.0m lvl
f) Shuttering for Shell wall from 24.0 to
+27.0m lvl
g) Shuttering for Shell wall from 27.0 to
+30.0m lvl

Employer

Contractor

h) Shuttering for Shell wall from 30.0 to


+33.0m lvl
i) Shuttering for Shell wall from 33.0 to
+36.0m lvl
j) Shuttering for Shell wall from 36.0 to
+39.0m lvl
k) Shuttering for Shell wall from 39.0 to
+42.0m lvl
l) Shuttering for Shell wall from 42.0 to
+45.0m lvl

Sqm

102

Sqm

102

Sqm

102

Sqm

102

Sqm

68

Sqm

40

Sqm

173

Sqm

109

Sqm

208

Sqm

63

Sqm

91

c) Shuttering for Ring beam at +52.025


m lvl

Sqm

26

Supplying & Fixing Reinforcement


steel
for RCC works including
straightening, cutting, bending, placing in
position and binding all complete cut to
length, bent to shape required, including
cranking, bending spirally for hooping for
columns, hooking ends and binding with
and including mild steel wire (annealed)
not less than 0.9mm dia etc complete.
Thermo- Mechanically treated bars
(TMT)
a) Foundations, footings, Pedestal,
Shell up to 7.5m lvl

M.T.

m) Shuttering for Shell wall from 45.0 to


+48.0m lvl
14

Providing & fixing centering & shuttering


including strutting, propping etc., &
removal of form for domes, Shell Roofs
a) Domes from +45.0 to +48.0 m lvl
b) Domes from +48.0 to +51.0 m lvl
c) Domes from +51.0 to +54.0 m lvl

15

16

Providing & fixing centering & shuttering


including strutting, propping etc., &
removal of form for Ring beam& slab
a) Shuttering for Ring beam & bottom
slab at +45.0 m lvl
a) Shuttering for Ring beam at +49.195
m lvl

Employer

30

Contractor

10

b) Reinforcement
+7.5 to +15.0m lvl
c) Reinforcement
15.0 to +18.0m lvl
d) Reinforcement
18.0 to +21.0m lvl
e) Reinforcement
21.0 to +24.0m lvl
f) Reinforcement
24.0 to +27.0m lvl
g) Reinforcement
27.0 to +30.0m lvl
h) Reinforcement
30.0 to +33.0m lvl

for Shell wall from

M.T.

2.5

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

1.2

M.T.

2.5

M.T.

7.0

n) Reinforcement from 48.0 to +51.0m


lvl

M.T.

5.0

p) Reinforcement from 51.0 to +54.0m


lvl

M.T.

5.0

Supplying & adding Water proofing


Compound for Concrete
Supplying, mixing, waterproofed
compound with Cement concrete for
Water retaining structure, as per
manufacturers instruction.
The Quantity shall not exceed 1% by
weight of cement. (For maximum cement
of 400kg/m3). Conplast WP400 or
equivalent

Litre

300

for Shell wall from


for Shell wall from
for Shell wall from
for Shell wall from
for Shell wall from
for Shell wall from

i) Reinforcement for Shell wall from


33.0 to +36.0m lvl
j) Reinforcement for Shell wall from
36.0 to +39.0m lvl
k) Reinforcement for Shell wall from
39.0 to +42.0m lvl
l) Reinforcement g for Shell wall from
42.0 to +45.0m lvl
m) Reinforcement from 45.0 to +48.0m
lvl

17

Employer

Contractor

11

18

19

20

21

22

23

24

25

Supplying & Fabricating structural


steel
Supplying, cutting, fabricating , Erecting
and finishing of Rolled sections of Fe 410/
Grade -250, with cleats or other
connecting plates for Structural platforms
of Shell at various levels including surface
finishing with one shop coat of Zinc
chromate primer .
Providing & fixing 25mm thk Grating
for platforms including the cost
of
cutting to size, positioning, including
surface finishing with one shop coat of
Zinc chromate primer.
Providing & fixing Handrail including
the cost of cutting to size, including
surface finishing with one shop coat of
Zinc chromate primer.
Supplying & fixing sheeting 0.8mm
thk
Galvanised, corrugated mild steel
sheeting with two corrugations side lap,
fixed with coach screws, washers in roofs,
walls etc with grade of zinc coating 275.
Supplying & fixing MS Rolling shutter
1.25 lath thickness
With out ball bearing, including top cover,
anchoring rod, hasp and stap with a coat
of primer but with gear operated type with
a bevel gear box and crank handle
Supplying & fixing Steel door including
projecting type hinges, steel handle,
complete, with glazing bars, dovetailed or
welded.
Puddle flanges
Providing & fixing of puddle flanges in
slab/walls during concreting to have water
tight connections between pipes &
concrete.
Water stopper
Providing & fixing of 230 thick PVC water
stopper at construction joints.

Employer

M.T.

M.T.

10

2.5

M.T.

2.0

Sqm

Sqm

10

Sqm

No

10

Meter

200

Contractor

12
Internal Plastering
12thk 1:6+6thk 1:3

26

27

Providing & Plastering 18 mm cement


plaster in two coats under layer 12 mm
thick cement plaster 1:5 (1 cement : 5
coarse sand) and a top layer 6mm thick
cement plaster 1:3 (1 cement : 3 coarse
sand) with lime rendering finishing for
water retaining portion of the structure
with void sealing with pressure grouting.
Supplying & adding Water proofing
Compound to internal plastering
Supplying, mixing, waterproofed
compound in internal plastering for Water
retaining structure, as per manufacturers
instruction.
The Quantity shall not exceed 1% by
weight of cement.(For maximum cement
of 220kg/m3).

Sqm

375

KG

4.0

Total Rs

Employer

Contractor

13

SUB HEAD: MECHANICAL/PIPING WORKS


S.No

Description of Work

Supply of bare Pipes, Pipe fittings,


flanges, fasteners, gaskets, valves,
fasteners, U Bolts as per MTO
mentioned in drawing no.2174-B000A00000-0003-0317-0002 sheet 3 of 3.

3
4

Shifting all Pipes, Pipe fittings, flanges,


fasteners, gaskets, valves, fasteners, U
Bolts, etc from MIDHANI storage location
within plant premises to overhead tank
site ( maximum 200 mtrs ) & temporary
storage near overhead tank
Cleaning of insert plates for pipe
supports.
Supply & Fabrication of pipe supports.

Unit

Qty

Lot

01

Lot

MT

01

Lot

01

Lot

01

6
7

Painting of pipe supports.

Lot

01

Fabrication of pipe puddles/ nozzles.200 mm dia 02 nos, 400 mm dia- 01


nos, 100 mm dia 02 nos.( One set at
45 mtr level & the other set at 0.00 mtr
level)

Inch
mtr/
Inch
dia

40/70

Surface preparation of pipe puddles,


pipes.

Sq mtr

125

10

Supply & application of primer on pipe


puddles, pipes

Sq mtr

125

Fabrication of piping

14

Non-Destructive Testing of Field weld


joints.

Inch
dia
No of
Joints
Inch
Mtr
No of
Joints

15

Erection of valves with flanges, gaskets &


fasteners ( Valves :- 400 NB, 350 NB,
100 NB Wafer type 1 no each)

Nos.(
Inch
Dia)

11
12
13

Non-Destructive Testing of shop weld


joints.
Erection of piping

Employer

Amount in
Rs.

Free Issue to Contractor by MIDHANI

Surface preparation, supply of primer & it


s application on pipe supports.
Erection of pipe supports.

Rate in
Rs

618

48
1372
21
03( 34)

Contractor

14

16

17

18

Erection of U bolts for pipe clamping at


various levels 400 NB -09nos, 200 NB12nos., 100 NB-12nos.)
Cleaning, primer touch up & Finish
painting of all pipes within the package
battery limit
Cleaning/ clearing the area of all the
surplus piping materials & returning to
MIDHANI stores.

Lot

01

Sq mtr

125

Lot

01

Total Rs.

Employer

Contractor