Documente Academic
Documente Profesional
Documente Cultură
2.
3.
1) Shear force
B) d2y/dx2
2) Slope
3) Load
4) Bending moment
C) d3y/dx3
D) d'y/dx4
4.
A.
_...~
c.
D.
s.
When shear force at a point is zero, then bending moment at that point will be1) Zero
2) Minimum
,JfMaximum
4) Infinity
6.
Robert Hooke discovered experimentally that within elastic limit1) Stress is equal to strain
2) Product of stress and strain is unity
,)"'Stress is proportional to strain
4) Stress is inversely proportional to strain
7.
CIVIL_DM_062014
8.
Maximum torque transmitted by a circular solid
shaft is:
~D'
16
,W.
~ill'
c.
~o
D.
~o
32
9.
16
64
Liltl
Liat ll
A) Poi.on' ratio
1) Dinct atnsol
direct .train
8) Rigidity modwua
2) Lateral atrainl
Jo~tudinal
strain
3) Load/
deflection
4)Shurstress /
ahear strain
C) Elutiemodwua
D) Stiffness
10.
A
11.
A
3
A.
B.
lJT.
D.
2) Shear
4) Compression
The BMD diagram for a cantilever with udl for a distance of 'a' from free end is in
the shape of -
l) A parabola
.-?:(Combination of parabola and straight
line
2) A straight line
4) A circle
12.
CIVIL_DM_062014
- 13.
C.
14.
-=-=I
E y
WL
8
B. -WL
4
)~
D.
WL
3
SWL
15. When a beam is loaded with concentrated loads, the bending moment diagram will
be al) Horizontal straight line
2) Vertical straight line
,.){'Inclined straight line
4) Parabolic curve
16.
B.
D.
CIVIL_DM_062014
- 18.
B.
_!_bh 2
12
, ~-
_!_bh 3
12
D.
_!_bh 3
36
19.
ai1
8EI
/ L,K.
B.
a,tl
8EI
c.
@I'
-48El
.u
D.
384El
20. The radius of gyration of a rectangular section is equal to1) Square root of the moment of inertia
2) Square root of the inverse of the area
~quare root of the moment of inertia
4) Square of the moment of Inertia divided
by area of section
divided by area of section
21. A cantilever of 4m span carries a point load of 10 KN at the free end. The max
2) 2.56 mm
4) 2.50 mm
1tEI
,
~
C.
f
x1 EI
T
/2El
7
D.
x2EI
212
CrvIL_DM_062014
. 23.
~l~l/4
A
JK
~unitJenth
>K
l/2
::;.t-E--1/4---?>-I:::
c. 3
D. 4
25. Stiffness of a beam is the property by virtue of which it resists-
)) Tension
3) Shear Force
26.
2) Bending moment
284EI
B.
WL1
-8
SWL
,,,, ~ 384Fl
D.
2WL1
438EI
27.
3EI
c.
WJJ
8EI
D.
WJJ
16EI
CIVIL_DM_062014
,,a{Deflection of a beam
For three equal span continuous beam whose ends are simply supported and EI
values are constant, the distribution factors of the members are-
29.
1) Equal
3) 317
30
unequal
4) 417
a>t
-48EI-
B.
-30EI
c.
(l)r!
sd
384El
a>t
~ 384EI
31. Consider the following assumptions in the analysis ofa plane truss. 1. The
E= P. o
B.
E=A.o
P.L
v.
E= P.L
,,,,
D.
33.
AL
A.o
AL
E=P.o
2) MU2EI
2
J41'M L /3El
CML_DM_062014
. 34. The ratio of the area of cross section of a circular section to the area of its core, is:
2) 8
l) 4
3) 12
3S.
~16
1
-9000
1
,,,. ~ 7500
C.
-1-
D.
1600
1
750
~D
B.
~D
,.
C.
~D
3
D
4
/f'f0.1 N/mm2
3) l.ON/cm 2
2) 1.0 N/mm2
4) 10.0 N/m 2
~D/4
40.
2) D/8
4) 0 /6
CIVIL_DM_062014
41. The bearing capacity of a soil cannot be increased by1) Chemical treatment
2) Grouting
3) Compacting
/ )Moistening the soil
42.
/~oisture
43.
Any store masonry work which is NOT highly finished is known as2) Rough masonry
3) Ashlar masonry
4) Base masonry
44.
Water absorption for 1st class bricks shou~'!J~OT be more than1) 12%
15%
3) 20%
4) 25%
.ARubble masonry
/>
The defect in painting caused by excess moisture vaporising in back of the paint
film is known as:
2) Alligatoring
l ) Wrinkling
4) Scaling
~Blistering
45.
46.
48.
49.
so.
1) 75 kg/cm2
A IOO kg/cm2
51.
52.
2) 90 kg/cm 2
4) 120 kg/cm2
CIVIL_DM_062014
54. The commonly used lime in white washing is:
l) Quick lime
A Fat lime
3) Lean lime
4) Hydraulic lime
55. A roof sloping in four directions is called-
1) Sloping roof
3) Cable roof
mp roof
4) Shed roof
In initial setting time test of cement, the needle falls to penetrate the test block byI) 10 mm
3)3 mm
2)9mm
A smm
B.
p(1+sin;)
()) 1-sm;
pc-sin;)
l+sm;
tD
, /. .ec-sin;J
()) l+sin;
D.
.e(1+sin;J
()) 1-sin;
2) Wind loads
/ [No external loads
2) Red earth
4) Compacted ground
'l) 0.8% grade
~2.5%grade
CIVIL_DM_062014
6S.
,.l>:'
B.
c.
D.
66.
Lilit-I
Lilit - Il
1) Volume of air I Volume of
a) Poro.ity
b) Air content
c) Water
content
d) Specific
gravity
...
67.
voicb
2) Weight of Water I Weight of
80licU
3) Unit weight of 80lids I Unit
weia.ht of water
4) Volume of voids / total
volume oC ..,i) m...
A.
,,:
c.
D.
,.. ,Jr.""
c.
D.
Wgz
p=-
VR
Wv1
gR
p= -
p= gR
Wv1
Wv 2
p=-
2gR
68. For small drainage crossings _ _ _ culverts are often found in practice to be most
economical.
I) Concrete
2) Masonry
4) Steel
~ipe
69. The plastic limit exists in1) Sandy soils
3) Silty soi ls
2) Gravel soils
clays
1) To minimize speed
3) To avoid skidding
, 4surface drainage
4) To accommodate change in direction
CIVIL_DM_062014
71. In case of hilly areas, a wall is provided on the outside of the road to ensure safety
1) Retaining wall
3) Danger waJl
72.
1) Ease water
~Cut water
73.
2) Stop water
4) Water repeller
74. On a national high way, the minimum width of the pavement should be-
1) 4.7 m
3)6.7m
75.
s.7 m
4)7.Sm
A gradient at which a vehicle does not require any tractive effort to maintain the
specific speed is called1) Minimum gradient
f a 1oating gradient
3) Ruling gradient
4) Pushing gradient
76. Gradients at hair pin bends or other sharp corners with inside curves of 10 to 15 m
should never exceed-
/1) l
in20
3) 1 in 60
77.
2) 1 in 40
4) 1 in 80
Camber is:
A.
._..K
b/a
2b/a
c.
b/2a
D.
alb
i ~b
CIVIL_DM_ 062014
78
A
/
e+s=w+G
~ es=wG
e w
c. --s G
D.
s+e G+e
w
s
----
1) 4 m
A 20m
2) 10 m
4)50m
80. On a hill road, the radius of curve should not be less than -
1) 100 m
2) 60 m
3)30 m
81.
f tl5 m
crmi
B.
Cmi
l,K
ACrmi
D.
c 2 rmi
3) d/2
83. The pressure measuring devices areA'fPiezometer
3) Venturimeter
84. Piezometer is used to measure1) Atmospheric pressure
3) Differential pressure
Ad/4
4) d/3
2) Orifice meter
4) Mouthpiece
CIVIL_DM_062014
A.
Cd= Cc
B.
Cd= Cv
cc
Cv
.,,,. ft'
Cd=Cc x Cv
D.
Cv=Cd x Cc
I) Surface Irrigation
~Sprinkler Irrigation
2) Lift Irrigation
4) Sub-Surface Irrigation
2) Decrease in infilteration capacity
4) Decrease in permeability of soil
93. According to Manning's formula, the discharge through an open channel is:
l) AM m112 i 213
AM m213 i 112
12
213
1
3) A M m i
4) A213 M 113 m i
,A
= Precipitation, E =
CNIL DM 062014
96.
I..Ut-1
a) In Perennial
Cana1a
b) In non-perennial
canalt
c) In protective
canalt
d) In productive
canalt
I..Ut - 11
1) Watudoes not flow
throuhout the year
2) Revenue from water is
not expected
3) Revenue from water is
e~
B.
or.-
D.
A.
D=
B.
B=
A8.64D
D
D = 8.646
B
fl= 8.64B
D
c.
"'
A8.64D
B
w.
List-I
List - II
1) Pressure measured with
a)
Atmospheric
...-
--
pressure
b) Gauge
0"'"9\ln!
c)Absolute
preasure
d)Vacuum
pressure
!JC'"
d
3
B.
c.
D.
CIVIL_DM_062014
100
101.
Z+p+V=C
B.
p v
Z+-+-=C
w g
v2
c.
z+l..+-=C
w
g
).'
z+l..+-=C
w 2g
v2
The axis about which the telescope and the vertical circle of a theodolite rotates in
the vertical plane is called-
2) Bubble axis
4) Axis of the level tube
,,,efuneven ground
4) Steep ground
103. The technique of plotting all the accessible stations with a single set up of plane
table is calledA
Radiation
3) Resection
2) Intersection
4) Traversing
were taken
Line Fo.re bearing Back bearing
AB
19
200
277
100
BC
CA
227
49
If station A is free from local attraction, correct
beari.ruf of CB is:
A 275
B.
276
c.
277
~ 279
JOS. The spacing of cross-hairs in a stadia diaphragm of a tacheometer is 1.20 mm and
the focal length of the object glass is 24 cm, then the multiplying constant of
tacheometer is :
I) 50
3) 150
106. If the
faoo
4) 200
focal length of the object glass is 25 cm and the distance from the object glass
to the trunnion axis is IS cm, the additive constant is:
1)0.10
/ f0.40
4) 1.33
3) 0.60
CML_DM_062014
. 107. The process of turning the telescope in vertical plane through 180 about the
trunnion axis is called 2) Reversing
,ATransiting
4) Swinging
3) Plunging
1) Datum point
3) Reference point
109. Levelling deals with measurement in -
I) Horizontal plane
3) Both horizontaJ and vertical plane
, Asench mark
4) Mean level
A_vertical plane
4) lnclined plane
l) Direct method
3) Cross-section method
2) Square method
~Tachometric method
!) 0 and 45
2) 0 and 90
0
and 180
3) 0 and 120
112.
/ef
I) s 20 E
3) N 120 E
As
114. Contours of different elevations may cross each other only in the case of -
2) A vertical cliff
4) An inclined plane
Perpendicularity of an offset may be judged by eye, if the length of the offset is:
1) 5 m
f i 'l5m
2) 10 m
4)20m
,V
h2
21
B.
21
h2
c. -l
D.
h2
2JI
CIVIL OM 062014
. 117. The process of turning the telescope about the vertical axis in horizontal plane is
known as2) Plumbing
1) Reversing
3) Transisting
.)1Swinging
A branch of surveying in which the horizontal and vertical distances of points are
obtained by instrumental observations is known as1) Chain surveying
2) Plane-table surveying
~Tacheometric surveying
4) Hydrographic surveying
118.
The aggregates which are passing through IS 4.75 mm sieve, are called ,.A1"Fine aggregates
2) Coarse aggregates
4) Unsaturated
3) Saturated
119.
The combined correction for curvature of earth and refraction is given by1) 0.06 0 2
2) 0.0736 0 2
~0.0673 02
4) 0.0055 0 2
120.
121.
To obtain large quantities of water, the following form of underground sources are
sunk in series in the banks of river I) Infiltration gallery
~Infiltration well
4) Reservoir
3) Springs
122.
123.
124.
125
List- II
1) 10
2)20
3) 500
4) 3
-~
B.
c.
D.
126.
CIVIL_DM_062014
127. The chloride content in the water for public water supply should not be more than ./f250ppm
3) 80 ppm
2) 150 ppm
4) 50 ppm
128. For controlling the growth of algae the chemical generally used is:
I) Alum
3) Bleaching powder
2) Lime
~opper Sulphate
129. The ratio of volume of voids to the total volume of given solid mass is-
l) Voids ratio
3) Specific gravity
..4Porosity
4) Density
130. Consider the following statement regarding sedimentation tank: 1) Raw water is
screened for removal of large organic impurities 2) Raw water is passed through
coagulation sedimentation plant 3) Raw water is passed through rapid gravity
fillers 4) Cleaned water is disinfected for killing of germs and colour removal The
correct sequence of the operation is:
1) 4-+3-+2-+1
~l-+2-+3-+4
2) 1-+ 2-+4-+ 3
4)3-+ 1-+2-+4
131.
Consider the following statements regarding the foul gases in the sewers. 1.
Hydrogen sulphide OiiS) is evolved 2. Carbon dioxide (C02) is evolved 3. Methane
is evolved 4. Oxygen is evolved Of these statements:
I) 1 and 2 are correct
2) 2 and 3 are correct
3) 3 and 4 are correct
~ , 2 and 3 are correct
132.
134.
The capacity of a water supply reservoir should be1) Balancing storage - breakdown storage - 2) Balancing storage - breakdown storage +
fire storage
fire storage
3) Balancing storage + breakdown storage~alancing storage + breakdown storage +
fire storage
fire storage
135.
136.
2) Bacteria
/
Scale forming compounds
CIVIL_DM_062014
137. The type of water supply distribution system layout, in which water reaches each
point from one side only is:
1) Ring system
Dead ends system
4)
Grid
iron system
3) Radial system
.A
I ) D-trap
~uJly trap
2) Anti-syphonage trap
4) S-trap
140. Water taken out from shallow or deep wells, infiltration galleries, artesian wells etc
2) Surface water
4) Overhead storage water
t) Numbers
3) Area in square meters
142. The useful area of liveable area of a building is also known as-
/1)Carpet area
3) Horizontal circulation area
2) Circulation area
4) Plinth area
143. The original cost of a property minus the amount of depreciation upto previous
year is known as1) Market value
A'Bookvalue
3) Sinking value
4) Rentable value
144. The percentage of total cost provided towards water charge, in rate analysis is:
A iYi%
3) 3Yi %
2) 2Yi %
4)5 %
145. Various taxes on a building are generally fixed on the basis of-
t) Plinth area
3) Orientation
146. Net rent+ Outgoings =
I) Total rent
..,)1Gross rent
2) Location
/
Annual rental value
2) Depreciation value
4) Sinking fund installment
147. In case of Government accommodation normally officers are required to pay the
,?fsalary
2) Plinth area
4) Location of building
CIVIL DM 062014
148. The value of the property, without being dismantled, at the end of the useful life
~alvation value
2) Book value
4) Junk value
149. The number of tiles required for 10 m 2 , using 200 x 200 x 20 mm size mosaic tiles
2) 200 Numbers
~50Numbers
150. The cost of construction of a hostel building accommodating 200 students is found
to be Rs. 6.2 lakhs. Using unit cost method, the cost of construction of a new
building to accommodate 120 students is:
l ) 3.50 lakhs
3) 3 .00 lakhs
2) 3.25 lakhs
~3 . 72 lakhs
1) 0. 1 cu.m
3) 0.001 cu.m
152
01 cu.m
4) 0.02 cu.m
)L
3 3
-m
B.
-m
6
c.
-m
3
4
D. -3 m 3
5
153. The annual periodic payments made for the repayment of the capital invested is
2) Depreciation
4) Solatium
~inking fund
154
B.
c.
D.
CIVIL OM 062014
155. Choose the correct statement from the following: (i) Plinth area method is a rough
estimate (ii) Service unit method is a rough estimate (iii) Cubic content method is a
detailed estimate Of these statements:
156. Pick out the odd man out from the following, pertaining to estimate.
l) Schedule of rates
3) Abstract estimate
157
2) Preparation of data
r
ough estimate
y.
/
1()()
Rate of interest
C.
D.
158. The volume of coarse aggregate required to make 100 m 3 of 1 : 2 : 4 concrete is:
~ m3
2) 88 m3
4) 96 m 3
3) 92 m3
159. The rent of the lift worked out with the following data. Cost of lift = Rs. 68640/-
~Rs. 500/month
2) Rs. 600/month
4) Rs. l 000/month
3) Rs. 872/month
160. Choose the incorrect statement.
l) The expenses those are spent on the
property by taking periodical repairs are
outgoings
_ Ahe value of the property recorded in the 4) Plinth area is the usable area
register of local authority is called book
value
161. The maximum value of Poisson's ratio for~ elastic material is:
I) 0.25
3) 0.75
162. A moving load is a-
l ) Static load
3) Static or Dynamic
0.50
4) l.00
Dynamic load
4) Dead load
CIVIL_DM_062014
164. The maximum area of tension reinforcement in beam shall NOT exceed1) 0.02 bD
2) 0.03 bD
_.)1(>.04 bD
4) 0.05 bD
165.
The maximum ratio of span to depth of a slab simply supported and spanning in
two directions, is:
1) 25
2) 30
4) 40
~ 35
166.
167.
,K.
c.
D.
c.l(R+1)
~
T
~
T
~R
169.
170.
,Jef
171.
Generally in freely supported T-beam, over all depth of the beam for design
purpose will be taken as1) 1/ 12 to 1115 of the span
A1115 to 1/20 of the span
3) 1/20 to 1/24 of the span
4) Half of the span
172.
For cantilever beams and slabs, the basic value of the span to effective depth ratio
is:
2) 10
3) 15
4) 25
/!)1
173.
CIVIL OM 062014
174. The design Live load on the floors of residential buildings is about1) 1.0 KN/m2
3) 3.0 KN/m2
fa.o KN/m
4) 4.0 KN/m 2
of the beam.
2) Inclined to the axis
4) At centre of beam
.!.2 ofthetotalthicknessofslab
B.
1) Homogeneous material
3) Isotropic material
, 4 'Heterogeneous material
4) Elastic material
,,,,, ,,K"
n- me xd
mc+t
B.
me
n=--Xd
mc-t
C.
n _ mc+txd
me
_mc-txd
--D. n
me
179.
wL2
8
2
wL
B. +
8
c.
-wL
10
,~
wL2
+10
CIVIL_DM_062014
180. The minimum diameter of main reinforcement bars used in beams as per IS 456 -
..
2000 is:
1)6mm
2)8 mm
~lOmm
4) 12 mm
1) Henri Fayol
3) H.L. Gantt
F.W. Taylor
4) P.F. Drucker
1) Chief Engineer
3) Executive Engineer
A superintending Engineer
4) Assistant Executive Engineer
1) Motion study
3) Probabilistic analysis
2) Work measurement
~ethod of study and work measurement
l) Concrete cured
~xcavation for foundation
185
2) Concrete poured
4) Wall plastered
,K
B.
c.
D.
1) Single event
3) Triple events
~Double events
4) 4 events
2) Design
...)fStudy and evaluation
l) Materials
3) Management
2) Money
1) l.5 % to 2.0 %
$'i.o % to 2.0 %
2) l.2 % to l.5 %
4) 2.0 % to 2.5 %
1) Insolvency proceedings
2) Lunacy proceedings
_AThe matters pertaining to the protection 4) The matters pertaining to the
of private rights.
procurement of labour
CIVIL DM 062014
191. The following point is related to administ~e approval-
is:
I) Final settlement of money
~!'- standing advance of a fixed sum of
money
2) Interim amount
4) Earnest money deposit
is:
1) 2.5 % of estimated cost of contract
3) 7 .5 % of estimated cost of contract
2~
Discipline is strong
4) Unity is strong
195. The chart which gives an estimate about the amount of materials handling between
2) Process chart
4) Operation chart
1) Activity oriented
3) Time oriented
vent oriented
4) Resources oriented
1) I and Il use the concept of critical path ~ uses the concept of critical path but II
slack
does not
3) Il uses the concept of critical path but I 4) None uses the concept of critical path and
slack together
does not
l) Contract
3) Conception
2) Design
study of evaluation