Way Forward
Where we want to be
Progress on reform of the Sector
Investment opportunities
Introduction
What is a Transmission Grid
2.
Shiroro
400MW
Kainji
400MW
Jebba
400MW
Papalanto
200MW
Egbin/AES
1,200MW
Omotosho
250MW
Geregu
360MW
Okpai
450MW
Ihovbor
360MW
Egbema
270MW
Sapele
360MW
Calabar
561MW
Ibom
155MW
Sapele
200MW
Delta
500MW
Omoku
200MW
Omoku
120MW
SHELL
420MW
Afam
350MW
Alaoji
305MW
TRANSMISSION LINES
SOKOTO
BORNO
KATSINA
JIGAWA
ZAMFARA
B/Kebbi W/C
KANO
YOBE
Dutse W/C
Maiduguri W/C
Gusau W/C
Kano W/C
KEBBI
KADUNA
NIGER
Kainj i W/ C
BAUCHI
G OMBE
Gombe
W/C
Kaduna W/C
AM
AW
A
KWARA
UJ
PLATEAU
AB
Jebba W/C
Jos W/C
Abuja W/C
EKITI
Sapele W/C
DELTA
IMO
ABIA
Delta W/C
Ahoada W/C
RI
VE
R
SS
Benin North
Benin W/C
Akangba W/C
Ikeja West W/C
Egbim W/C
Aja W/C
YI
Omotosho W/C
ANAM BRA
Papalanto W/C
RO
ONDO
EDO
OSUN
BO
OGUN
TARABA
BENUE
Ajaokuta W/ C
Osogbo W/C
ENUGU
Ayede W/ C
NASS ARAWA
KOGI
AD
Ilorin
(Ganmo) W/C
OYO
Yola W/C
Shir or o W/C
Owerri W/C
Calabar W/C
BAYELSA
Afam W/C
RIVERS
AKWA
IBOM
10
11
12
State of Infrastructure
Transmission Grid Post-NIPP
13
EXISTING:
5,523.8km of 330 kV of Transmission lines
6,801.49km of 132kV of Transmission lines
32No. 330/132kV Substations with total installed
transformation capacity of 7,688 MVA (equivalent to 6,534.8
MW)
105No. 132/33/11kV Substations with total installed
transformation capacity of 9,130MVA (equivalent to
7,760.5MW)
The Average Available Capacity on 330/132kV is 7,364MVA
and 8,448MVA on 132/33kV which is 95.8% and 94.1% of
Installed capacity respectively
Average Transmission Loss is 8.5%
14
Challenges
18
140
120
YEARS
100
80
60
40
20
0
0-10YR
11-20YR
21-25YR
26-30YR
31-40YR
41-50YR
50-ABOVE
330kV Trfmrs
24
132kV Trfmrs
48
48
26
64
45
11
330kV CBs
39
35
59
107
132kV CBs
81
49
118
150
47
10
16
16
29
26
19
27
44
14
REACTORS
22
28
29