Documente Academic
Documente Profesional
Documente Cultură
TURBINE DEPARTMENT
POWER SECTOR TECHNICAL SERVICES, NOIDA
AGENDA POINTS
FOOL PROOF SCHEME OF POWER SUPPLY (24 V DC, UPS, 220 V BATTERY SUPPLY)
QUALITY OF HARDWARE SUPPLIED BY THE VENDOR OF UPS ETC.
ALARM / TRIP LIMITS OF TURBINE / GENERATOR BEARING METAL TEMPERATURE
CHECKS TO BE CONDUCTED BEFORE STARTING OF TURBINE AFTER AN OIL
STARVATION INCIDENCE
QUALITY OF BEARING BABBIT METERIAL
COMPLETE COMMISSIONING OF ALARMS, INTERLOCK AND PROTECTION SYSTEM
SOFTWARE RELATED ISSUES LIKE FREEZING OF DISPLAY IN MAX DNA ETC
SUMMARY
Action Taken
-
1.
2.
3.
Rating
2*125
MW
2*250
MW
2*125
MW
PROJECT
220V DC
CONFIGURATION
220V DC FEEDER
DISTRIBUTION
BARSINGHSI
R Ext 1&2
UNIT LOADS
CONNECTED ON
UNIT DCDB &
STN LOADS ON
STATION DCDB
W/O ANY
SEGREGATION
FOR R + S FDRS
NEYVELI
UNIT LOADS
CONNECTED ON
UNIT DCDB &
STN LOADS ON
STATION DCDB
W/O ANY
SEGREGATION
FOR R + S FDRS
SLPP 3&4
UNIT LOADS
CONNECTED ON
UNIT DCDB &
STN LOADS ON
STATION DCDB
W/O ANY
SEGREGATION
FOR R + S FDRS
ANY
CORRECTIVE
ACTION
REQUIRED
REMARKS
YES
BOARDS MFRD.
SWAPPING OF
FDRS/ NAME
PLATES/ USAGE
OF SPARES/
CUSTOMER APPL
REQD
YES
BOARDS NOT
MANUFACTURED
. REVISED LOAD
INPUTS GIVEN
TO VENDOR/
CUTOMER APPL
OBTAINED
YES
BOARDS MFRD.
SWAPPING OF
FDRS/ NAME
PLATES/ USAGE
OF SPARES/
CUSTOMER APPL
REQD
1.
2.
Rating
2*210
MW
1*500
MW
PROJECT
220V DC
CONFIGURATION
220V DC FEEDER
DISTRIBUTION
BAKRESHWAR
4&5
UNSECTIONILSED
DCDB WITH 1
BATTERY & 2
CHRGRS
R + S FDRs
CONNECTED ON
SAME SECTION
BELLARY
R + S FDRs
CONNECTED ON
SAME SECTION
ANY
CORRECTIVE
ACTION
REQUIRED
REMARKS
YES
REDISTRIBUTI
ON OF
FEEDERS AT
SITE
REQUIRED
YES
REDISTRIBUTI
ON OF
FEEDERS AT
SITE
REQUIRED
3.
4.
Rating
2*210
MW
1*210
MW
PROJECT
220V DC
CONFIGURATION
RAYALSEEMA 3
&4
Rayalseema 5
220V DC FEEDER
DISTRIBUTION
UNIT R + S
FEEDERs
CONNECTED ON
SAME UNIT BUS
R + S FDRs
CONNECTED ON
SAME DCDB
ANY
CORRECTIV
E ACTION
REQUIRED
REMARKS
YES
SWAPPING OF
FDRS/ NAME
PLATES
BETWEEN
TWO UNIT
DCDBs
REQUIRED.
YES
BOARDS
MFRD.
BUSCOUPLER
TO BE
INTRODUCED
IN DCDB &
FEEDERS
REDISTRIBUT
ED.
1.
Rating
2*250
MW
PROJECT
220V DC
CONFIGURATION
LEHRA
MOHABAT 3 &
4
220V DC FEEDER
DISTRIBUTION
R + S FDRs
CONNECTED ON
SAME DCDB
ANY
CORRECTIVE
ACTION
REQUIRED
REMARKS
YES
REDISTRIBU
TION OF
FEEDERS
ALREADY
CONVEYED
TO SITE FOR
IMPLEMENT
ATION
S.N.
1.
Rating
1*250
MW
PROJECT
220V DC
CONFIGURATION
SANTALDIH
6
MAIN DCDB
UNSECTIONALISED
WITH 1 BATTERY & FCB
CHGR WITH COMMON
CONN TO BUS & 1 FC
AS S/BY. NO STANDBY
DCDB BUT TIES TO
MAIN DCDB FROM UNIT
-5 MDCDB & S/B DCDB
220V DC
FEEDER
DISTRIBUTION
R + S FDRs
CONNECTED ON
SAME SECTION
ANY
CORRECTIVE
ACTION
REQUIRED
REMARKS
YES
NEW S/BY
DCDB REQD
FOR WHICH
INPUTS
ALREADY
GIVEN TO
VENDOR
1.
2.
Rating
2*250
MW
2*250
MW
PROJECT
220V DC
CONFIGURATION
220V DC FEEDER
DISTRIBUTION
ANY
CORRECTIVE
ACTION
REQUIRED
MEJIA 5 & 6
SECTIONALISED
DCDB FED BY TWO
SEPARATE
CHARGERS &
COMMON BATTERY
TO BE
DECIDED
AFTER SITE
FEEDBACK, IF
REQD.
CHANDRAPURA
7&8
SECTIONALISED
DCDB FED BY TWO
SEPARATE
CHARGERS &
COMMON BATTERY
TO BE
DECIDED
AFTER SITE
FEEDBACK, IF
REQD.
REMARKS
metal
temperature
protection.
During
coasting
down
temperature and vibration of all bearings shoot up. All bearings got
damaged.
During UPS failure, the unit suffered Oil starvation, which went
undetected
UPS SCHEME
AND
SERVO
Incomplete commissioning
- Checking of start of DC EOP from pressure switch
- Alarms of UPS failure
- Availability of SoE, Trends charts prior to rolling
Journal Bearing
After this trip,during restart on the same day babbit temp. of this
bearing was 125 at front and 92 at the rear of the bearing. Customer
decided to keep the unit in operation and was stopped for bearing
inspection after few days of operation on load.
Issues
-
Quality of babbit
Bearings which has faced temperature more than trip limit of brg metal
temperature
Alarm
Sequence of Events
Trend Charts
OTHER ISSUES
Energise to Trip
Whether with 24 V DC supply failure, Turbine trip solenoid will trip or not
Kahalgon Feedback
-
ISSUES:-
Once during the power supply failure, DC EOP started but tripped due
to blowing of fuse (overloading) but, nothing happened as rotor came
to stand still before tripping of DCEOP.
ISSUE:-
THANK YOU