7. Which of the following is an element that addresses elimination of waste under lean
production?
Kanban production control system
Production ahead of demand
Minimized run times
Group plant loading technology
Click here and download OPS 571 Complete Course
8. In most cases, demand for products or services can be broken into several
components. Which of the following is considered a component of demand?
Level elements
Future elements
Past elements
Cyclical elements
9. Design for manufacturing and assembly delivers product improvements by
emphasizing which of the following:
Reducing product quality during the assembly process
Designing products so they can be manufactured by a virtual factory
Reducing equipment in the production process
Simplification of the product by reducing the number of separate parts
13. There are many applications of poka-yokes in service organizations. Which of the
following is one of the three-T's used to classify poka-yokes?
Trust
Teamwork
Task
Time
Want help? Click to download OPS 571 Entire Course
14. Which of the following is a major factor that distinguishes service design and
development from manufacturing design and development?
The service package has the same legal protection available to manufactured goods.
Manufacturing is far more capital intensive than services.
The service process and service product can be developed independently.
The service package is the major output of the development process.
15. A project can be segmented into which of the following?
Events
Sub-jobs
Work packages
Success markers
16. Which of the following is a cost impact and payoff analysis tool from the operations
consulting tool kit?
Statistical tools
Decision trees
Work sampling
Gap analysis
17. According to the theory of constraints, which of the following can be a capacityconstrained resource (CCR)?
Product design
Inoperable equipment
An employee
A customer
18. The ability to rapidly and inexpensively switch production from one product to
another enables which of the following:
Economies of shape
Economies of size
Economies of scale
Economies of scope
22. Which production process term best describes the situation when activities in a
stage of production must stop because there is no work?
Blocking
Starving
Staging
Buffering
23. In a Gantt chart the vertical axis represents which of the following?
Time
Revenue
Tasks
Cost
24. The Shingo system states that the way to prevent defects from coming out at the
end of a process is to do which of the following:
Redesign the process in order to mitigate the bottlenecks.
Utilize SQC (statistical quality control).
Introduce controls within the process.
Slow down production rates until the process is in control.
25. Which of the following terms describes the time a unit spends actually being
worked on together with the time spent waiting in a queue?
Flow time
Build time
Cycle time
Run time
Quiz Answers just a click away OPS 571 Week 1 Quiz
26. Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for
optimized production technology?
An hour saved at a bottleneck operation does not increase the process flow.
If you lose an hour at a bottleneck it is better than making scrap.
Do not allow bottlenecks to govern the flow of the line.
Utilization and activation of a resource are not the same.
27. During the implementation of a project, which of the following should be the
primary focus of a consulting firm?
The correct project software
Application of the learning curve theory
Tools and materials availability
People management skills
28. Which of the following is an analytical tool used in Six-Sigma quality improvement
programs?
Gantt charts
Pareto charts
Tree charts
Pedigree charts
29. A project manager must consider several components when overseeing the
planning process of aggregate operations; specifically, whether such components
are factors that are internal or external to the organization. Which of the following
factors would be classified as an internal component for an organization?
Inventory levels and economic conditions
Market demand and subcontractor capacity
Current physical capacity and current workforce
Competitor behavior and current workforce
Download Complete Answers OPS 571 Week 1 Complete
30. Which of the following is the net requirement using an MRP program if the gross
requirement is 10,000 and the inventory on hand is 4,000?
10,000
14,000
6,000
4,000
About Author
This article covers the topic for the University Of Phoenix OPS 571 Final Exam. The author is
working in the field of education from last 5 years. This article covers the basic of OPS 571
Final Exam Assignment from UOP. Other topics in the class are as follows
OPS 571 Week 1 DQ 1
OPS 571 Week 1 DQ 2
OPS 571 Week 1 DQ 3
OPS 571 Week 1 DQ 4
OPS 571 Week 1 Process Design Matrix and Summary
OPS 571 Week 1 Quiz (Latest)
OPS 571 Week 1 Complete
OPS 571 Week 2 DQ 1
OPS 571 Week 2 DQ 2
OPS 571 Week 2 DQ 3
OPS 571 Week 2 DQ 4
OPS 571 Week 2 Process Designs and Supply Chains