Sunteți pe pagina 1din 20

LARSEN & TOUBRO LIMITED

HARYANA URBAN DEVELOPMENT AUTHORITY.


Format No.:AKS/HUDA/QC/10

AGGREGATE IMPACT VALUE TEST


[As per IS 2386, (Part - IV)]
PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Laboratory Job No.


Type of Material
Source
Location
Proposed Use

Date Sampled
Sampled By
Date Tested
Tested By

Weight of surface dry sample passing


12.5mm and retained on 10mm IS sieves,
Weight
of fraction passing on 2.36mm sieve
W1.
after theoftest,
W2. retained on 2.36mm sieve
Weight
fraction
after the test, W3.
W4 = W1 - (W2 + W3)
Aggregate Impact Value (A.I.V) = (W2/W1) x
100
Average Value of A.I.V
Note : if W4 > 1 gm, dicard and retest

Test 1

Test 2

(gm)
(gm)
(gm)
(gm)

Remarks :

FOR L & T

FOR HUDA

Test 3

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:AKS/HUDA/QC/12

PRIME COAT/ TACK COAT


PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Laboratory job no.


Source
Type of coat
Location

S.No.

Sample
location

:
:
:
:

Weight of
bitumen +
Paper or
pan (kg)

Date of sampling
Sampled by
Date of testing
Tested by

Wt. Of
paper or
pan (kg)

Wt. Of
bitumen
Area of
over the paper or
paper or pan (sq.m)
pan (kg)

:
:
:
:

Rate of
spread of
bitumen
emulsion
(kg/ sq.m)

Remarks

1
2
3
4
5
6
Average

FOR L & T

kg/ sq.m

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:AKS/HUDA/QC/17

DUCTILITY TEST OF BITUMEN


IS 1206 Part - 3

PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Laboratory job no
Source
Grade of bitumen
Location
Manufacturer

S.No.

Date of sampling
Sampled by
Date of testing
Tested by
Supplied quantity

Description

a
b

Test temperature *C

Ductility (difernce in initial and final readings)(

Sample 1

Sample 2

:
:
:
:
:

Sample 3

Reading on scale when the bitumen broke

NOTE: This sample is satisfying/ not satisfying the specifications of contract.

FOR L & T

FOR HUDA

Mean
value

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.

CORE INDEX MAP


PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Reference Lab Job No.

Type of Layer

BM
: LHS / RHS / LHS-Hard Shoulders / RHS-Hard Sh

Carriage Way
Location

:
LEFT LANE

8600

8160

7680

7200

6720

6240

5760

5280

4800

4300

FOR L&T

Format No. BT / F11

E INDEX MAP

Date

1440

960

ders / RHS-Hard Shoulders


RIGHT LANE
3840

3360

2880

2400

1920

480

kM

kM

FOR CONSULTANT

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no: AKS/HUDA/QC/14

SOFTENING POINT OF BITUMEN


PROJECT
CLIENT

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.

CONTRACTOR
Laboratory job no.
Source
Grade of bitumen
Location
Manufacturer

: Larsen & Toubro Limited - ECC Division.


:
Date of sampling
:
Sampled by
:
Date of testing
:
Tested by
:
Supplied quantity

S.No.

1st Ring

Temperature *C
2nd Ring

Average

:
:
:
:
:

Remarks

NOTE: The sample is satisfying/ not satisfying the specifications of contract.

FOR L & T

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:AKS/HUDA/QC/15

GRADE OF BITUMEN
BY PENETRATION TEST
PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Laboratory job no.


Source
Grade of bitumen
Location
Manufacturer

:
:
:
:
:

Trial no.

Sample 1

Date of sampling
Sampled by
Date of testing
Tested by
Supplied quantity

Penetration in 1/10th of mm
Sample 2

:
:
:
:
:

Specification limit

Sample 3

1
2
3
4
5
6
Average
Average penetration (1/10th of mm)=

NOTE: This sample is satisfying/ not satisfying the specifications of contract.

FOR L & T

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:AKS/HUDA/QC/20

VISCOSITY TEST OF BITUMEN


IS 1200 Part - 3 for Kinematic Viscosity

PROJECT
CLIENT
CONTRACTOR

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.

Laboratory job no.


Source
Grade of bitumen
Location
Manufacturer

:
:
:
:
:

S.No.

Date of sampling
Sampled by
Date of testing
Tested by
Supplied quantity

Description

Specific test temperature 0C

Viscometer used

Size of the viscometer

Viscometer constant

Actual test temperature 0C

Test run in seconds

Viscosity in cst. ( s.no 4 X s.no

:
:
:
:
:

Sample 1

Sample 2

Sample 3

Mean
value

600C

600C

600C

600C

Cannon-Fenske / U-Tube modified reverse flow

Average viscosity in cst.=

NOTE: This sample is satisfying/ not satisfying the specifications of contract.


Low porosity
Medium porosity
High porosity

FOR L & T

Remarks

30 to 60cst.
70-140cst.
250-500cst.

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.

Format no:AKS/HUDA/QC/18

STRIPPING VALUE OF AGGREGATE


PROJECT
CLIENT

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.

CONTRACTOR

: Larsen & Toubro Limited - ECC Division.

Laboratory job no.


Source
Grade of bitumen
Location

:
:
:
:

Date of sampling
Sampled by
Date of testing
Tested by

Size of aggregate
Weight of aggregate taken
Bitumen added

S.no.
1
2
3

: Passing IS Sieve 20mm and retained on IS Sieve 12.5mm.


:200 gm.
Temperature of aggregate
: 5%
Temperature of bitumen

Temperatur No. Of
% of aggregate that remained coated after the specified time
e
observatio
1 hour
3 hour
24 hour
maintained
ns
1

40 0C

2
3

Mean value

6
7

:
:
:
:

60 0C

: 150*C
: 160*C

Remarks

Specification
requirement:
not less than
95%.

2
3
Mean value

NOTE: This sample is satisfying/ not satisfying the specifications of contract.

FOR L & T

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.

SUMMARY OF AGGREGAT
PROJECT

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.

CLIENT

: Haryana urban development authority.

CONTRACTOR

: Larsen & Toubro Limited - ECC Division.


Gradation Percentage Passing mm

Lab job
No.

Location
Source

Type of
Aggregate

40

20

12.5

10

4.75

QC Engineer
Lab - In - Charge
FOR L & T

NOTE: This sample is satisfying/ not satisfying the specifications of contract.

FOR L & T

FOR HUDA

2.36

1.18

Y OF AGGREGATE TEST RESULTS

g mm

Physical Properties
0.6

0.3

0.15

Fineness
Modulus

Silt
Content %

Specific
Gravity

Particle Shape

Mechanical Properties

Water
Flakiness Elongation Combined
Absorption
Index
Index
(FI & EI)
%

Lab - In - Charge
Material Engineer
FOR CONSULTANT

Mechanical Properties
AIV / ACV
(%)

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format No.AKS/HUDA/QC/09

SPECIFIC GRAVITY & WATER ABSORPTION


PROJECT
CLIENT
CONTRACTOR
Lab Job No.
Type of material
Source
Location
Proposed use

S.No.
A
B
C
D
E

(By Wire basket method)


:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.
: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.
Date of sampling
Sampled by
Date of testing
Tested by

Description
Weight of the oven dry sample in air (gm)
Weight of the sample in water (gm)
Weight of the saturated surface dry sample (gm)

Sample 1

Sample 2

Specific gravity = A/(C-B)


Water absorption (%) = 100x(C-A)/A
Average specific gravity =
Average water absorption (%) =

FOR L & T

FOR HUDA

Sample 3

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no: AKS/HUDA/QC/16

BITUMEN EXTRACTION TEST


PROJECT
CLIENT
CONTRACTOR
Laboratory job no.
Source
Type of mix
Location
A
B
Wt. Before extraction
(gm)
sample

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.
:
Date of sampling
:
:
Sampled by
:
: BM
Date of testing
:
:
Tested by
:
C
D
E
F
G
H
Wt. After extraction Difference = Total ash Bitumen in
%
of
bitumen
in the
(gm)
[(A-C)in the mix the mix =
total
mix
(G/A)x100
Filter paper
sample
Filter paper (D-B)] (gm)
(E-F) (gm)
(gm)

GRADATION OF EXTRACTED SAMPLE

Weight of sample taken C=


Retained on sieve
Sieve size

Wt.
Retained
(gm)

% wt.
Retained
(clo.2/C)
x100

1
26.5mm
19.0mm
13.2mm
4.75mm
2.36mm
300mic
75mic

FOR L & T

% of
Cumm.
Wt.
Retained
4

% of
passing
(100 col.4)
5

gm.

Specification limits

BM
100
90-100
56-88
16-36
4-19
2-10
0-8

FOR HUDA

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:AKS/HUDA/QC/13

GRADATION TEST FOR BM


PROJECT
CLIENT
CONTRACTOR
Laboratory job no.
Source
Type of layer
Location

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.
: Larsen & Toubro Limited - ECC Division.
:
Date of sampling
:
Sampled by
: BM
Date of testing
:
Tested by

:
:
:
:

Weight of sample taken W1:


Retained on sieve
Sieve size

Wt. Retained
(gm)

1
26.5mm
19.0mm
13.2mm
4.75mm
2.36mm
300mic
75mic

FOR L & T

% wt. Retained
% of Cumm. Wt.
(clo.2/W1)
Retained
x100
3

% of passing
(100 - col.4)

Specification limits

BM
100
90-100
56-88
16-36
4-19
2-10
0-8

FOR HUDA

gm.

LARSEN & TOUBRO LIMITED


HARYANA URBAN DEVELOPMENT AUTHORITY.
Format no:

GRADATION TEST FOR BM


PROJECT
CLIENT

:Internal development of residential sector-57,part-I&II, urban estate, gurgaon.


: Haryana urban development authority.

CONTRACTOR
Laboratory job no.
Source
Type of layer
Location

: Larsen & Toubro Limited - ECC Division.


:
Date of sampling
:
Sampled by
: BM
Date of testing
:
Tested by

:
:
:
:

Weight of sample taken W1: 10250

Sieve size

1
26.5mm
19.0mm
13.2mm
4.75mm
2.36mm
300mic
75mic

Retained on sieve
% wt.
% of
Wt.
Retained
Cumm.
Retained
(clo.2/W1)
Wt.
(gm)
x100
Retained
2
3
4

% of
passing
(100 col.4)

gm.

Specification limits

5
BM
100
100
95.2
90-100
73.5
56-88
12
25.6
16-36
15
8.9
4-19
10
26.5mm 19.0mm
5.6
2-10
26.5mm 19.0mm
8
13.2mm 4.75mm
10
13.2mm 4.75mm
3.2
0-8
6
2.36mm
26.5mm 19.0mm 13.2mm 4.75mm 2.36mm
2.36mm 300mic
45
2
26.5mm 19.0mm 13.2mm 4.75mm 2.36mm 300mic
00
0.8
11
1.2
0.8
1.2 1.4
1.4 1.61.6 1.81.8 2 2

100
90
80
70
60
50
40
30
20
10
0

120
100
100
80
80
0.075

60
60
40
40

0.3

2.36

4.75

13.2

20
20
00

00

0.25
1
2 0.53 0.75
4

51

6 1.257

1.5
8

Row 32
Row 33
Row 34
Row 35
Row 36
Row26.5
37
19 Column
E
Row 38
Row 39
Row 40
Row 41
1.75

60
60
40
40
20
20
00

00

0.25
1
2 0.53 0.75
4

51

6 1.257

1.5
8

Row 36
Row 37
Column
E
Row 38
Row 39
Row 40
Row 41
1.75

S-ar putea să vă placă și