Documente Academic
Documente Profesional
Documente Cultură
(Reminder continues):
Explain for what purpose each procedure is carried out? Remember the
7 steps but do not confine (limit) yourself with just writing the bullets,
but make comprehensive explanations.
When you enter ETD and Speed value in the functional table, which one
of the following calculated results will be displayed after schedule
calculation has been completed?
(In which method this is seen?)
Tidal currents and surface currents may be taken into account in
calculations. What should you do to to integrate these values into
calculations?
Which symbol you should click on if the current alarm is not visible on
the chart panel?
IMPORTANT NOTE: WHEN YOU FIND OUT ALL THE ANSWERS WHICH ARE
RELETED WITH ROUTE PLANNING, WHICH ARE RESIDING IN THIS PAPER
IN A MIXED FASHION, YOU HAVE THE COLLATE THEM AND LINK THEM
TOGETHER IN A SEQUENCE SO THAT THEY SHALL ALL MAKE UP AN
ANSWER FOR THE WHOLE PROCESS OF ROUTE PLANNIG INCLUDING
VARIOUS METHODS. THIS WILL FORM A COMPREHENCE ANSWER FOR ALL
THE ASPECTS OF ROUTE PLANNING AND PERTINENT ACTIONS PERFORMED
WITH ECDIS TOOLS.