Sunteți pe pagina 1din 25

7.

00
6.00
5.00
0.25
0.25
0.25
0.85

length
width
height, inside
thickness of concrete wall
thickness of bottom slab
thickness of top slab
reservoir bottom slab is

m
m
m
m
m
m
m

from NGL

wall
16mm dia grade 40 vertical bars spaced @
12mm dia grade 40 horizontal bars spaced @
12mm dia grade 40 top and bottom bars spaced @

Gravel bedding

0.1 m

0.15
0.20
0.20

G1

Volume of Concrete:
wall:

31.25 m3

top slab:

10.5 m

bot. slab:

10.5 m3

total:

5000 php/cu.m

52.25 m3

261250

Volume of excavation:
39.9 m3
Volume of G1 for gravel bedding

4.62 m3

Rebs:
wall 1 & 2
16mm vertical bars
12mm hor. bars
Additional len

192 pcs @ 6.0 m


104 pcs @ 6.0 m
208 m
35 pcs @ 6.0 m
139 pcs @ 6.0 m

total 12mm hor. bars


wall 3 & 4
16mm vertical bars
12mm hor. bars
Additional len

164 pcs @ 6.0 m


104 pcs @ 6.0 m
52 m
9 pcs @ 6.0 m

total 12mm hor. bars


top and bottom slab
12mm x-direction
Additional len

113 pcs @ 6.0 m

144 pcs @ 6.0 m


72 m
12 pcs @ 6.0 m
156 pcs @ 6.0 m

total bars x-direction


12mm y-direction
Additional len

124 pcs @ 6.0 m


248

total bars y-direction

Length of distribution

41 pcs @ 6.0 m
165 pcs @ 6.0 m

1600 m
200 households
4.5 m
100 mm dia main line
75 mm dia distribution line

Standard length of PPR pipe


req. pcs of 100 mm PPR (BELDIN BRAND)
req. pcs of 75 mm PPR (BELDIN BRAND)
100 - 75 mm tee reducer (BELDIN BRAND)
75mm elbow (BELDIN BRAND)
Gate Valves (KITZ BRAND)
Standard water meter (ARAD BRAND)

4m
400 pcs
225 pcs
200 pcs
800 pcs
200 pcs
200 pcs

m
m
m

OC
OC
OC both ways

0.25 m

Reservoir P

0.85 m

Reservoir Ele

6.00 m

0.25 m

7.00 m

Reservoir Plan View

Top slab

0.25 m

5.00 m
NGL
Bottom slab

eservoir Elevation

0.25 m

Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation

Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Installation of Main Pipes 0.5 m from NGL for tank outlet
Concreting of Walls
Curing
stripping of formworks and Scaffoldings
Cleaning
Installation of Pipes
s
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Concreting
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Curing
Stripping of formworks for Top Slab
Testing of Pipe Connections for leakages
Troubleshooting
Punch listing

Manpower

Equipment

WEEK 1
WEEK 2
1 2 3 4 5 6 7 8 9 10

Laborer

3 3

Surveyor, Laborer

4 4

Laborer
Laborer
Laborer

Jack Hammer
Plate Compactor

Laborer
Laborer

Rebar Cutter and Bender

Laborer
Laborer

Concrete Vibrator

Laborer
Laborer
Laborer
Laborer

Fusion Welding Machine


Concrete Vibrator

Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Laborer
Project Manager
Project Manager
Project Manager

Jack Hammer
Jack Hammer
Fusion Welding Machine/ Generator
Fusion Welding Machine/ Generator
Fusion Welding Machine/ Generator

4
3

WEEK 2
WEEK 3
WEEK 4
WEEK 5
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

3
2
2
2

2
2
2
2

3
4
2

3
3

2
4
5

EK 5

WEEK 6
WEEK 7
WEEK 8
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58

4
2
3
2
2

3
2
2

3
2
2

3
2
2

3
2
2

3
2
2

3
2
2

3
2
2

3
2
2

3
2
2
4
3

3
3

4
3

3
3

4
3

3
3

3
2
1

3
2
1

WEEK 9

WEEK 9
WEEK 10
WEEK 11
59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75

3
2
1

3
2
1

1
3

1
3

3
3
3
4
2
2

2
2
2

CODE
100
100.01
100.02
200
200.01
300
300.01
300.02
300.03
300.04
400
400.01
500
500.01
500.02
500.03
500.04
500.05
500.06
500.07
500.08
500.09
500.1
500.11
600
600.01
600.02
600.03
600.04
600.05
600.06
600.07
600.08
700
800
900

Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation

Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Concreting of Walls
Cleaning
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Stripping of formworks
Installation of Pipes
Installation of Main Pipes 0.5 m from NGL for tank outlet
Excavation for Main Pipes 0.5 m from NGL
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Testing of Pipe Connections for leakages
Troubleshooting
Punch listing

CODE
100
100.01
100.02
200
200.01
300
300.01
300.02
300.03
300.04
400
400.01
500
500.01
500.02
500.03
500.04
500.05
600.01
500.06
500.03
500.11
500.07
600
600.02
600.03
600.04
600.05
600.06
600.07
600.08
500
500.08
500.09
500.1
500.03
500.11
700

800
900

Activity
General requirements
Applying for Permits
Providing storage area and Power Connection
Site Construction
Establishing benchmarks/Layouting, Site Boundaries, and Site Clearing
Excavation

Excavation Works
Backfilling & Compacting
Gravel Bedding at 0.1 m
Ground leveling
Metal
Fabrication of Rebars (Slab and Wall)
Concreting
Installation of Reinforcing Bars for Bottom Slab and Wall
Concreting of Bottom Slab
Curing
Installation of Formworks for Wall
Installation of Scaffoldings for Walls
Installation of Main Pipes 0.5 m from NGL for tank outlet
Concreting of Walls
Curing
stripping of formworks and Scaffoldings
Cleaning
Installation of Pipes
Excavation for Main Pipes 0.5 m from NGL
Excavation for Distribution Pipes 0.3 m from NGL
Laying out of Pipes
Installation of Main Pipes
Installation of Distribution Pipes
Installation of Gate Valves and Water Meter
Backfilling & Compacting
Concreting
Installation of Formworks for Top Slab
Installation of Reinforcing Bars for Top Slab
Concreting of Top Slab
Curing
Stripping of formworks for Top Slab
Testing of Pipe Connections for leakages

Troubleshooting
Punch listing
Non Working Days
Planned Work

WEEK 1
3 4 5

WEEK 2
9 10 11 12 13 14 15 16

6
51

0.0335195531
0.2849162011

0.0167597765

2
2
2
2

0.0111731844
0.0111731844
0.0111731844
0.0111731844

0.0111731844

0.0112

2
1
6
2
2
1
1
6
1
1

0.0111731844
0.0055865922
0.0335195531
0.0111731844
0.0111731844
0.0055865922
0.0055865922
0.0335195531
0.0055865922
0.0055865922

0.0112

10
10
10
10
10
10
6

0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0558659218
0.0335195531

1
1
1
6
1
2

0.0055865922
0.0055865922
0.0055865922
0.0335195531
0.0055865922
0.0111731844

WEEK 3

0.0335195531
0.0335195531

0.0335195531

0.0167598
0.0112
0.0112
0.0112
0.0112

2
6

0.0111731844
0.0335195531

179
3.3519553073
3.3519553073
1

1
2
3
4
5
6
7
8
9
10
11

3.3519553073
12.8491620112
20.6703910615
28.4916201117
35.1955307263
46.9273743017
60.3351955307
70.3910614525
84.9162011173
97.7653631285
100

9.4972067039
12.8491620112
2

7.8212290503
20.670391061
3

WEEK 3
WEEK 4
WEEK 5
WEEK 6
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

0.0335195531

0.0335195531

0.0335195531

0.0335195531

0
0.0167598

0.0167598
0.0112
0.0112
0
0
0.0279329609

0
0
0
0.0223463687
0.0223463687
0.0223463687

7.8212290503
20.6703910615
3

7.8212290503
28.4916201117
4

6.7039106145
35.1955307263
5

11.7318435754
46.9273743017
6

WEEK 6
WEEK 7
WEEK 8
WEEK 9
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

0335195531

0.0223463687
0.0223463687
0.0223463687

0.0335195531

0.0335195531

0.0335195531

0.0335195531
0.0335195531

0.0223463687
0.0223463687
0.0335195531

0.0335195531
0.0335195531
0.0335195531

0
0

0.0112

11.7318435754
46.9273743017
6

0.0112

13.4078212291
60.3351955307
7

10.0558659218
70.3910614525
8

14.5251396648
84.9162011173
9

EK 9

WEEK 10
WEEK 11
63 64 65 66 67 68 69 70 71 72 73 74 75

0.0167598

0.0223463687
0.0223463687

0.0112

0
0.0279329609

0
0

0
0.0335196
0.2849162
0
0.0167598
0
0.0111732
0.0111732
0.0111732
0.0111732
0
0.0111732
0
0.0111732
0.0055866
0.0335196
0.0111732
0.0111732
0.0055866
0.0055866
0.0335196
0.0055866
0.0055866
0
0.0558659
0.0558659
0.0558659
0.0558659
0.0558659
0.0558659
0.0335196
0
0.0055866
0.0055866
0.0055866
0.0335196
0.0055866
0.0111732

396648
011173
9

0.0111732
0.0335196

0.0335195531

12.8491620112
97.7653631285
10

2.2346368715
100
11