Sunteți pe pagina 1din 39

Copper Anglo Chile operations

USO DE HERRAMIENTAS DE PLANIFICACION LARGO PLAZO


EN DIVISION LOS BRONCES

UBICACIN LOS BRONCES


Iquique

Collahuasi
Collahuasi

Antofagasta

Mantos
Blancos

Chaaral

Mantoverde
Copiap

La Calera

San Felipe

Valparaso

Santiago

El Soldado
Chagres
Los Bronces
Chagres

Se ubica en la cordillera de los Andes sobre


3,500 msnm a 65 km al nor este de Santiago.
Precipitaciones de nieve anual : 7.7 m.

INSTALACIONES LOS BRONCES


Chancador Primario e infraestructuras
relacionadas

Fase Donoso 1

Area Mina

Sector Infiernillo

Botaderos San Francisco


Planta Lixiviacion San
Francisco

(Esteril y Lixiviable)

ANDINA

FASES LOS BRONCES

DON 4
DON 3

DON 2

INF 8
INF 5

DON 1

INF 6

DON 5

INF 5SW
CASINO

INF 7

HORIZONTE PLANIFICACION

Planes Estratgicos

Planes LOM
Plan Budget (3YP)
Plan Short Term
TIME CYCLE
UNIDAD DE EXPLOTACION: 1 BANCO

UNIDAD DE EXPLOTACION: POLIGONOS

PERIODOS DEL PLAN: ANUAL

PERIODOS DEL PLAN: MENSUAL

MODELO DE BLOQUES

CHEQUEO MODELO DE BLOQUES


Statistics: Procedimiento Chequeo de las Variables
**
Statistical

CUT10 STATISTICS
Analysis

of

CUTOFF BLOCKS
0
13,536,640
0.1
12,473,042
0.2
3,160,957
0.3
2,668,698
0.4
2,158,654
0.5
1,653,504
0.6
1,173,916
0.7
772,041
0.8
473,364
0.9
269,618
1
154,181
1.1
91,799
1.2
61,888
1.3
45,648
1.4
32,548
1.5
22,573
1.6
15,753
1.7
10,753
1.8
7,436
1.9
4,392
2
2,091
2.1
969
2.2
623
2.3
396
2.4
246
2.5
150
2.6
79
2.7
32
2.8
1

FROM

3-D

MODEL FILE

MODEL

grades

based

on

ABOVE
100.0
92.1
23.4
19.7
15.9
12.2
8.7
5.7
3.5
2.0
1.1
0.7
0.5
0.3
0.2
0.2
0.1
0.1
0.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

CUTOFF
0.2033
0.2168
0.5528
0.6084
0.6697
0.7368
0.8136
0.9003
0.9976
1.1122
1.238
1.37
1.4791
1.562
1.6481
1.7373
1.8194
1.8981
1.9663
2.0456
2.164
2.3048
2.3932
2.4756
2.5556
2.6218
2.6838
2.741
2.83

MEAN
0.2298
0.2344
0.2552
0.2391
0.2253
0.2163
0.2127
0.2155
0.2252
0.2406
0.2524
0.2518
0.239
0.2256
0.2128
0.1973
0.182
0.1691
0.161
0.1673
0.1764
0.1717
0.1531
0.1332
0.1054
0.0796
0.0563
0.0323
0

S.T.D.
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10
CUT10

051015.DAT
**
CUT10

CHEQUEO MODELO DE BLOQUES

Pitres: Cubicacin de Fases LOM Anterior

MODELO DE PLANIFICACIN

Consideraciones al modelo Geolgico debido a diversas razones:


1) Geomecnicas : Codificacin segn Roseta de ngulos de
Talud. Para la codificacin se utilizan las propiedades del
modelo de bloque a travs de slidos.

MODELO DE PLANIFICACIN
2) Metalrgicas: Correcciones a la Recuperacin Metalrgica. (Model
Calculation)
Granulometra:
%#65 = 15.091*Ln(TPH*8)-128.7
Correccin Rec = (-0.015*(%#65^2)+0.473*(%#65)-3.554)
Donde TPH es el valor de TPH segn modelo CEET.
Limpieza:
Planta Los Bronces: Recuperacin de Limpieza 96.3%
Planta Confluencia: Recuperacin de Limpieza 97.3%

Tiempo Residencia:
Rec =-0.00000187189*TPH2+0.007038619*TPH-6.324249593
Donde TPH es el valor de TPH segn modelo.

MODELO DE PLANIFICACIN
3) Topogrficas: Crter de Andina. (model Calculation)

MODELO DE PLANIFICACIN
4) Comerciales: Acuerdo Pago Royalty con Andina. (Model
Calculation)

DISEO DE FASES
El diseo de las fases se realiza mediante la herramienta PIT
EXPANSION.

STRATEGIC PLANNER - MSSP


Lo primero es la cubicacin de las nuevas fases, para ello se utiliza
una multirun configurando la herramienta PITRES.

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP

STRATEGIC PLANNER - MSSP


SUMMARY MINING RESULTS
Period
#
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Phase
ID
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2
DON2

Bench
Elevation
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400
3400

Reserve
Class ID
0.1
0.15
0.2
0.25
0.3
0.31
0.32
0.33
0.34
0.35
0.36
0.37
0.38
0.39
0.4
0.41
0.42
0.43
0.44
0.45
0.46
0.47
0.48
0.49
0.5
0.51
0.52
0.53
0.54
0.56
0.58
0.59
0.6
0.61
0.62
0.63
0.64
0.65
0.66
0.67
0.68

Reserve
Class #
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
32
34
35
36
37
38
39
40
41
42
43
44

Schedule
Class ID
T01WST
T01WST
T01ROM
T01ROM
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL
T01MIL

Schedule
Class #
501
501
61
61
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Destination
Destination
W1
W1
RLCH1
RLCH1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1
OR1

Lift
Elevation
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000

SubRegion
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL
ALL

Reserve
Tonnage
974.456
1986.463
2577.421
1794.303
193.92
241.67
116.801
86.089
123.616
73.692
52.842
69.132
28.171
38.464
43.219
6.692
23.701
39.894
15.621
34.123
22.029
14.818
6.187
3.287
6.141
6.064
6.187
6.141
10.086
24.904
12.699
9.544
11.534
12.539
32.398
37.344
9.492
29.305
8.306
19.195
18.938

Grade
CUT1
0.129
0.178
0.224
0.272
0.304
0.314
0.325
0.334
0.344
0.354
0.363
0.374
0.385
0.395
0.404
0.414
0.425
0.434
0.445
0.454
0.464
0.477
0.484
0.497
0.502
0.519
0.527
0.532
0.546
0.563
0.588
0.593
0.608
0.612
0.625
0.635
0.646
0.655
0.662
0.673
0.688

Grade
REC10
89.378
88.731
88.741
89.357
89.995
88.182
90.248
88.235
87.825
88.404
87.13
89.684
88.437
89.084
89.256
85.951
91.314
88.343
88.781
88.18
86.927
84.66
86.11
87.768
91.32
81.89
84.93
92.14
83.588
88.69
88.396
88.344
86.754
91.049
90.548
90.106
87.535
90.944
89.997
92.303
92.027

Grade
CUS10
0.008
0.008
0.009
0.01
0.009
0.01
0.01
0.011
0.008
0.01
0.01
0.012
0.011
0.009
0.009
0.015
0.009
0.012
0.014
0.015
0.017
0.014
0.022
0.018
0.01
0.015
0.022
0.009
0.019
0.017
0.018
0.015
0.018
0.016
0.016
0.015
0.02
0.014
0.015
0.012
0.012

Grade
MOT10
0.003
0.006
0.008
0.008
0.006
0.008
0.009
0.011
0.008
0.013
0.008
0.011
0.006
0.006
0.006
0.048
0.004
0.021
0.034
0.007
0.008
0.012
0.006
0.022
0.005
0.012
0.009
0.004
0.012
0.007
0.007
0.008
0.006
0.003
0.003
0.003
0.006
0.002
0.005
0.002
0.002

Grade
AST10
15.625
15.1
15.358
17.273
14.397
14.099
28.693
34.064
14.178
16.379
14.673
16.905
14.415
14.811
15.085
19.214
18.313
18.286
20.561
15.204
15.426
15.085
13.4
18.423
19.5
13.9
13.3
19.4
13.664
15.933
16.576
17.439
15.856
18.484
17.944
16.616
16.031
16.871
15.918
15.9
17.376

Grade
DEN10
2.62
2.626
2.621
2.619
2.623
2.619
2.63
2.613
2.615
2.612
2.625
2.62
2.624
2.617
2.623
2.573
2.62
2.603
2.584
2.633
2.633
2.634
2.64
2.598
2.62
2.64
2.64
2.62
2.64
2.63
2.63
2.627
2.69
2.676
2.685
2.728
2.701
2.73
2.625
2.73
2.694

Grade
RX10
60
52.169
50.335
52.207
57.336
51.514
54.208
42.238
53.798
45.491
49.344
48.601
54.509
57.894
56.135
13.93
59.873
37.896
29.656
43.998
43.265
38.539
35
21.766
60
35
35
60
35
47.329
47.088
51.085
37.774
49.794
48.15
40.296
38.37
40
53.482
40
46.485

Grade
R10A
60
52.061
51.871
53.61
57.336
54.164
55.235
46.502
56.273
50.457
50.281
50.944
54.509
58.947
56.135
35
59.937
46.544
44.828
43.998
42.178
39.248
35
35
60
35
35
60
35
47.329
47.088
51.085
37.774
49.794
48.15
40.296
38.37
40
53.482
40
46.485

CONCLUSIONES
Los resultados obtenidos se entregan de forma rpida, robusta y
consecuentes con los alineamientos entregados en los planes
estratgicos, en relacin al secuenciamiento de fases.
Las herramientas utilizadas respetan bastantes bien las
restricciones operativas e interferencias del entorno que se tienen.
An cuando el software entrega una secuencia operativa, est debe
ser revisada y actualizada en los prximos pasos de planificacin
debido principalmente al escenario dinmico de corto plazo

OPORTUNIDADES
Incorporacin de la herramienta Haulage para el calculo de las
distancias de transporte.
Implementacin de Automaping para la busqueda de L.C. de
acuerdo al mapeo de los destinos y restricciones propias de la faena.

Copper Anglo Chile operations


USO DE HERRAMIENTAS DE PLANIFICACION CORTO PLAZO
EN DIVISION LOS BRONCES

PLANIFICACIN CORTO PLAZO


INPUT
Plan Short Term Mensual

Modelo Geolgico mensual


Levantamiento topogrfico diario
Planificacin de Mantenciones

Mantenciones Planta
Secuencia de extraccin minerales.
Secuencia de Desarrollo Mina

OUTPUT
Plan Semanal
Plan Diario

Carta de minerales da a da

SHORT TERM Y MODELO GEOLGICO


Short Term:
- Alimentacin de mineral a planta
- Polgonos de mineral a extraer
- Secuencia de extraccin y desarrollo por
fases
- Layout general de caminos
- Movimiento Mina
- Metros perforados y material tronado
Modelo Geolgico
- El modelo geolgico es entregado mes a mes
- Se carga el modelo geolgico del mes al archivo 15 de minesight

- Se crea una vista del modelo del mes correspondiente


- Se cbica mediante IP usando el modelo geolgico correspondiente para
cuantificar las caractersticas de cada polgono

METODOLOGA DE TRABAJO DIARIA


Planificacin Corto plazo
- Terreno diario
- Reunin diaria 12 AM

- Redefinir directrices del plan semanal


- Realizar proyeccin de carta de minerales
- Jueves: Presentacin plan semanal
Topografa mina

- Marcacin de pozos de perforacin


- Levantamiento de pozos de perforacin
- Replanteo de zonas de extraccin
- Levantamiento de zonas de extraccin

- Marcacin de patas de botaderos


- Levantamiento y control de botaderos
- Levantamiento de Stock de mineral
- Marcacin de rampas
- Control de rampas
- Levantamientos especiales

CONSIDERACIONES GENERALES
Temporales principalmente en periodo de invierno:
- Prioridad a carguo de mineral
- Prioridad a equipos de servicios para mantener pistas
- Tapado de pozos de perforacin
Colindancia con Andina:
- Restriccin de botaderos cercanos al crter
- Restriccin de tronaduras cercanas al rea de hundimineto
Mina subterrnea:
- Existencia de galeras, piques, chimeneas y caserones
antiguos (Auscultacin y hundimiento)
- Existencia de fierros y desechos provenientes de la mina
subterrnea que puedan afectar al chancado.

EQUIPOS MINA

Perforacin:
- 4 Perforadoras Elctricas Bucyrus Erie 10 5/8
- 2 Perforadoras Diesel Pit Viper 10 5/8
- 2 Perforadoras Roc L8 6 arrendadas.

- 1 Perforadora Pit Viper arrendada


Carguo:
- 5 Palas Elctricas Bucyrus Erie (60 a 73 yd3)
- 1 Pala hidrulica Komatsu PC5500 de 37 yd3

- 3 Cargadores Le Torneau L-1000 (26 a 31 yd3)


Transporte:
- 32 camiones Komatsu 930 E de 300 ton.
- 9 camiones Komatsu 830 E de 250 ton.

DESARROLLO PLAN SEMANAL


Importar topografa diaria

DESARROLLO PLAN SEMANAL


Triangular y crear la superficie

DESARROLLO PLAN SEMANAL


Grillar con la topografa actual el archivo 13 de minesight.

DESARROLLO PLAN SEMANAL


Actualizar el % de topografa al modelo 3-D

DESARROLLO PLAN SEMANAL


Actualizar carpetas de topografa mina (Polgonos tronadura, polgonos
remanentes)
Cargar la Vista del plano diario de la mina en Minesight

DESARROLLO PLAN SEMANAL


Cubicar mediante IP los polgonos a trabajar

DESARROLLO PLAN SEMANAL

CARGUIO

Traslado
Perforar
Tronar
MP
SERV

L8
L8
L8
L8
P8
P8
L8
L8
P7
P7/9
P9

Disparo
ST02-M-144
ST02-M-145
D1-3520-173-M3
D1-3520-173-M4
D1-3520-173-M5
D1-3520-173-M7
D1-3535-176-M4
D1-3520-173/Parte3
D1-3505-100
DE-3565-191
IS5-3385-103/M1
IS5-3385-103/M2
IS5-3385-107

0.86675
CuT%
0.87
0.86
1.13
0.83
0.85
0.93
1.10
1.16
1.16
1.04
0.88
0.87
0.95

0.90
1.00
1.05
1.2
Rec% Recf%
89
89
83
83
90
90
94
94
90
90
90
90
90
90
90
90
90
90
87
87
87
87
84
84
89
89

Las caractersticas de los polgonos


de mineral cuando estn tronados
son cargadas por geologa.

Daily
Proy
Nov

Con%
20
31
25
27
25
25
25
26
27
22
31
29
29

Tph ceet
2187
2467
2266
2260
2320
2320
2388
2367
2340
2177
2460
2344
2398

Tph planta
2,187
2,467
2,266
2,260
2,320
2,320
2,388
2,367
2,340
2,177
2,460
2,344
2,398

Kton
59
102
5
3
16
10
45
97
58
68
49
17
50

Teorico

Cu/hr
17
18
23
18
18
19
24
25
24
20
19
17
20

D+S

DIF
-3
10
0
0
0
0
-1
0
28
18
0
2
0

Total Alimen Chanc Kton

Viernes
5-Nov
CBA
25

10

Sbado
6-Nov
4

Domingo Lunes
7-Nov 8-Nov
CBA
10

30

5
3
16
32

25

10
25
15

Martes
9-Nov

Jueves
11-Nov
CBA

Viernes
12-Nov
18

26

15
30

Mircoles
10-Nov

35

35
15

12
15

25

10

15

19

60

60

60

60

60

60

60

60

TPH Total:

2,322

2,340

2,256

2,324

2,440

2,380

2,365

2,314

Kton Planta
%CuT
Recuperacin %Cu final

TOTAL

54.5
0.95
86

54.9
1.01
90

52.9
0.98
87

54.5
0.88
88

57.2
0.94
86

55.8
1.07
90

55.5
1.13
90

54.3
1.02
89

3867

443

498

451

419

464

536

561

495

RESUMEN DE PRODUCCIN
Ton Cu Fino

Las carcteristicas de los poligonos


de mineral cuando no estn
tronados son cargadas por C.P
mediante la informacin del IP

Cu Fino Ton

PROM
#DIV/0!

CONCLUSIONES

El software y los recursos de la mina nos permiten obtener un


avance diario, el cual se hace muy detallado para tratar las
contingencias de la mina.
El IP es una herramienta de gran utilidad para planificar los
materiales existentes en la mina, tanto como de mineral, lix, y estril
para la programacin semanal.

Si bien los escenarios de corto plazo son dinmicos el IP nos


permite analizar diversas alternativas rpidamente que son
consecuentes con el lineamiento de LP.

OPORTUNIDADES

Implementar herramienta Material Manager. con el fin de poder


agilizar la planificacin del corto plazo.
Implementar MSAXIS, con el fin de mejorar el Ore Control.

S-ar putea să vă placă și