SPREADSHEET FOR STABILITY ANALYSIS OF THE DAM / WEIR / SPILLWAY

3
4
5
6

STABILITY ANALYSIS

LOAD CASE :

Properties

9
10

Density of RCC (t/cum) c

11

2.400
1.000
1.000
0.000
0.000
0.000
0.360
0.925
100.00
1.500
3.600
15.00
1.00
120.00

Rock to Concrete Friction factor (m)


Density of river water (t/cum): w
Basic horizontal Seismic coef. for Zone III
Design Horizontal Seismic Coefficient ( ah )
Design Vertical Seismic Coefficient ( av )
Density of " Silt " in Horizontal direction (t/cum) sh
Density of " Silt " in Vertical direction (t/cum) sv

12
13
14
15
16
17
18

Cohesion (t / Sqm)
Partial FOS in friction
Partial FOS in cohesion
Compressive Strength of RCC ( f ck) in Mpa

19
20
21
22

Fetch or straight length of water expanse in kms


Wind Velocity KMPH

23
24

A
B
C
D
E
F
G

Antype
Hor-1, Ver-2

Design Levels
1.96
1.66

Full Reservoir Level (FRL) (m)


Dam Crest level (m)
Maximum Water Level (m)

3.72 Deepest foundation level (DFL) (m)

Silt level (m)


U/s slope starts at level (m)
D/s slope starts at level (m)
Dist.of Drainage gallary from -heel (D) (m)
Tail Water Elevation (m)

346.00
348.00
347.00
270.00
310.00
300.00
336.90
14.00

A
B
C
D
E
F
G

270

25

Profile of Deepest Overflow Section

26

Height of U/s slope (H1)

27

The U/s face of spillway is inclined


Top width of Crest
(a)
U/s base offset from vertical face ( b )
Base width from vertical face to toe ( c )
Total base width of the Spillway ( B=b+c )
Total height of the Spillway
(H)
Depth of Water
(h)
Depth of Silt
(y)
Tail water Depth (y1)
Height of Top Straight Portion D/S (h'')

28
29
30
31
32
33
34
35
36
37

8.000
8.000
60.32
68.32
78.00
77.00
40.00
0.00
11.10

30.00

Upstream Slope

inner
outer

Downstream Slope

inner
outer

1.310
75.069
14.9314

radian
degree
degree

0.907
51.972
38.028

radian
degree
degree

38
39
40
41
42

Calculation of Forces and Moments

43

LOAD CASE :

Calculation of Wave Height

44
45

Sr.
No.

46
47

Description of the
Force

Formula

Magnitude of Force
Vertical
Horizontal
force
force
Downward (+)
Towards u/s (+)
Upward (-)
Towards d/s (-)

48
49
50

Formula

Value

Moment
about toe
Anticlockwise (+)
Clockwise (-)

Lever arm
(with respect to toe)

Remarks

Wave Height hw (m) =

0.8425

Wave Pressure Pw (tonne) =

1.42

Distance of the force above the reservoir surface 3hw/8 (m) =

0.32

Calculation for Hydrodynamic force (Pe)

51

W1 = 1/2 x b x H1 x c x 1

288

c+b/3

62.99

18140

53

W2 = a x H x c x 1

1498

c-a/2

56.32

84345

54

W3 = 1/2 x (c-a) x H xc x 1

4200

(c-a) 2/3

34.88

146505

52

Self Weight of the Dam

Angle in degree which the u/s face of the spillway


makes with the vertical ( )

14.9314

55

Maximum value of the pressure coefficient (Cs=Cm)

56

57
58

Horizontal Hydrostatic
Pressure

P = 1/2 x w (h) x 1

Weight of water
supported on
upstream slope

(h-H1) x b x w x1
1/2x bx H1 x w x 1

Uplift Forces

U = D x w x h/3
U = 0.5 x D x w x 2h/3
U = 0.5 x (B-D) x w x h/3

59

5986

0.70

248990
-2965

h/3

25.67

-76089

Hydrodynamic Force Horizontal (Pe): 0.726*Cs*Kh*w*h^2


Lever arm (0.412 x h)

Vertical component of Hydrodynamic force

0.00
31.72

60
61
62
63

376
120
496

c+b/2
c+2/3 b

64.32
65.65

24184
7878
32063

-359
-359.33
-697.11
-1416

B - D/2
B - D/3
2/3 (B - D)

61.32
63.65
36.21

-22034
-22873
-25245
-70152

y/3

13.33

-3840

Inertia Force due Earthquake in Hor. Direction

B-1/3( y tan )

64.76

12780

Horizontal Shear at base of spillway =

64

65
66
67
68

V2 = Pe @ bottom of spillway
V1 = Pe @ Crest level of spillway
Hydrodynamic Force Vertical = (V2-V1) tan

0.00
0.00
0.00

Lever Arm (B-0.412 x h x tan f )

59.86

69

70

Silt Pressure:

Horizontal

0.5 x gsh x y^2

-288

71

Vertical 0.5 x gsv x y^2 x tan

72

197

Fh = ahxgc[ax H/2 + bx H1/6 +(c-a) x (0.5x(1+h"/H)x(H+h') - h"(H^2+h''^2+Hxh")/(3xH))]


Moment at base of spillway =

Inertia Force due Earthquake in Vertical Direction

73

74
75
76

77

Inertia Force due to Earth


quake in Vertical
direction
Inertia Force due to Earth

Calculated separately
0

Mh = ah x gc [ (a x H^2)/ 3

+ (c-a+b) x H^2/ 12]

Calculated separately

quake in Horizontal dir.

78

0.0

79

80
81

Vertical Hydrodynamic

Calculated separately

Vertical Force =

Pressure

59.86

31.72

Fv = 2/3 [ Fh ]

0.0

82

84

Horizontal
Hydrodynamic

85

Pressure

83

Calculated separately

Mv = Fv x CG of Spillway

86

10

Wave Pressure

Calculated separately

11

Tail Wate Pressure

0.5*w*y12

90

Hor. Componenet

0.5*cos()*w*y12

91

Ver. Componenet

0.5*sin()*w*y12

87

77.32

2*y1/3

0.0

y1*tan()/3

0.00

88
89

0
0

92

Total Force =

93

5263

-3253

LOAD CASE :

Net Moment =

94
95
96
97
98
99
100
101

CALCULATION OF STRESSES

102
103
104
105
106
107
108
109
110

a) From the above Table:


M
V
H
b) Distance of the resultant
from the toe (x = M/ V )

143752
5263
-3253

M+
M-

293833
150080

27.31

111
112

c) Eccentricity (e = B/2 - x )

6.85

d) B/6

11.39

e) Whether resultant lies


in the middle third or not

e < B/6, No Tension anywhere

f) Pv at toe = (V/B)x(1+ 6e/B)

123.38

g) Pv at heel = (V/B)x(1- 6e/B)

30.71

113
114
115
116
117
118
119
120
121
122
123

h)

Principal and Shear stresses

124
125
126
127

=angle between vertical


with the d/s slope, at toe
(in degree)

38.03

128
129
130

= angle which the u/s face


make with the vertical

14.93

131
132
133

Principal stress at toe


(s = Pv at toe x Sec2 )

198.84

Principal stress at heel


(s 1= Pv at heel x Sec2)

32.89

Shear Stress at toe


( t = Pv at toe x tan )

96.49

Shear Stress at heel


( t1= Pv at heel x tan)

8.19

134
135
136
137
138
139
140
141
142
143
144

i) Factor of Safety against Overturning

145
146

FOS = M (+) / M (-)

1.96

147
148

j) Partial Factor of Safety against Sliding

149
150
151

FOS =

Moment at base of Spillway =


Distance of CG from toe along the width

1.66

Permissible Tensile Stress in


concrete (t / m^2)
= 15.00

143752

42.32
0.0