SUSTENTO DE METRADOS
SECCIN
1.00
Obras Preliminares
1.01
Und
CANT
und
LONG
m
ANCHO ALTURA
m
m
pulg
Auxiliar
und
1.03
1.04
1.05
1.06
Desbroce y limpieza
2.02
2.03
40
250
20
0.0001
2.00
Sealizacion
10,000.00
10,000.00
1.00
1
1.00
1.00
2.00
und
1.00
und
2.00
Movimiento de tierras
Excavacin para estructuras no clasificado
m3
1,595.03
Area
Estribo E1
4.50
176.16
792.72
Estribo E2
4.50
178.29
802.31
m3
0.00
Estribo E1
0.00
Estribo E2
0.00
Muro Laterals E1
0.00
Muro Laterals E2
0.00
m3
Relleno E2
2.05
250
und
Relleno E1
2.04
2.00
2
m2
2.00
2.01
1.00
Ha
Trazo y replanteo
TOTAL
1.00
1
1.02
PARCIAL
Eliminacin de material
696.96
1
4.50
60.00
270.00
4.50
12.40
55.80
4.50
3.12
14.04
4.50
65.53
294.89
4.50
3.18
14.31
4.50
0.95
4.28
4.50
9.70
43.65
m3
3,698.07
E1
452.88
452.88
E2
445.19
445.19
Encausamiento
m3
2,800.00
1
200.00
35.00
0.40
2,800.00
0.00
3.00
3.01
3.02
3.03
3.04
Estribos (cimentacin)
Concreto f'c=140 kg/cm2 bajo agua (falsa zapata)
487.60
1
11.50
10.60
243.80
11.50
10.60
243.80
Estribo E1
9.60
10.50
1.60
161.28
Estribo E2
9.60
10.50
1.60
161.28
Estribo E1
9.60
10.50
1.60
322.56
Estribo E2
9.60
10.50
1.60
322.56
Falza zapata
11.50
2.00
92.00
10.60
2.00
84.80
m3
322.56
m2
821.92
kg
25,804.80
Zapata E1
12902.40
12,902.40
Zapata E2
12902.40
12,902.40
23.94
165.19
4.00
4.01
m3
Estribos (elevacin)
Concreto f'c=210 kg/cm2 en seco (elevacin)
m3
597.63
Estribo E1
6.90
Estribo E2
6.90
23.94
165.19
Muro Lateral E1
6.70
15.13
101.37
37.51
32.26
15.13
101.37
37.51
32.26
1
Muro Lateral E2
0.86
6.70
1
4.02
0.86
m2
749.22
Estribo E1
6.90
13.30
91.77
Estribo E2
6.90
13.30
91.77
4.03
Muro Laterales E1
141.42
282.84
Muro Laterales E2
141.42
282.84
69.09
490.54
m2
Estribo E1
Estribo E2
4.04
1,521.43
1
7.10
7.10
3.24
23.00
7.10
69.09
490.54
7.10
3.24
23.00
117.48
234.96
Muro lateral E1
Tape
Muro lateral E2
Tape
7.10
0.86
7.10
0.86
12.21
117.48
234.96
12.21
kg
55,438.67
Estribos
Estribo E1
15692.67
15,692.67
Estribo E2
15692.67
15,692.67
Muro Lateral E1
12026.66
12,026.66
Muro Lateral E2
12026.66
12,026.66
7.850
0.00
7.00
7.01
7.02
7.03
Estructuras metlicas
Fabricacin de estructura metlica reticulada (ASTM A572 G50)
t
2
110.00
0.02
2.7000
7.850
93.26
55.00
0.50
0.0320
7.850
27.63
55.00
0.50
0.0500
7.850
43.18
55.00
0.80
0.0250
7.850
34.54
55.00
0.80
0.0380
7.850
52.50
30.00
0.80
0.0500
7.850
37.68
Diagonales
56
2.50
0.0036
7.850
3.96
Diafragma superior
24
3.70
0.0036
7.850
2.51
Diafragma inferior
24
3.70
0.0036
7.850
2.51
Atiesadores
248
2.70
0.225
0.0200
7.850
23.65
Rigidizador Longitudinal
68.80
0.200
0.0200
7.850
8.64
Conexiones y accesorios
7.06
7.07
7.09
7.10
0.00
0.00
7.850
0.00
346.56
347
0.00
0.00
346.559
346.56
346.56
346.56
0.00
0.00
346.56
0.00
0.00
0.00
0
16.50
Estructura metalica
7.05
346.56
Alma de la viga
Pendolas
7.04
0.00
346.56
346.56
0.00
und
2.00
2
7.11
Conectores de corte
13.86
1
6.00
2.00
13.86
13.86
6.01
6.02
6.03
m3
0.17
37.40
110.00
2.08
229.21
110.00
1.58
347.60
110.00
1.04
227.92
110.00
1.80
110.00
0.18
39.60
110.00
0.77
169.40
110.00
0.26
56.10
229.21
m2
Veredas
Encofrado Curvo
110.00
m3
Losa
6.04
37.40
2
1,038.62
198.00
m2
0.00
0
6.05
6.06
0.00
kg
35,828.98
Losa
32088.98
32,088.98
vereda
1870.00
3,740.00
Falso Puente
m2
0.00
0
8.00
8.01
8.02
8.03
0.00
Losa de Transicin
Concreto f'c=210 kg/cm2
m3
14.08
2
4.00
8.80
0.20
14.08
4.10
9.00
0.1
7.38
m3
7.38
kg
1,408.00
704.00
9.00
9.01
Varios
Apoyos
und
4.00
4
9.02
9.03
9.04
1,408.00
Pintura asfltica
4.00
17.40
2
8.7
17.40
8.7
17.40
17.40
m2
766.17
Estribo 1
Zapata
Muro Frontal
10.50
10.50
1.600
5.760
60.48
9.60
1.600
30.72
10.00
5.650
56.50
10.00
5.070
33.60
50.70
Muro Lateral E1
66.720
Tape
10.26
10.50
10.50
1.600
9.60
1.600
30.72
10.00
5.650
56.50
10.00
5.070
0.860
133.44
17.65
Estribo 2
Zapata
Muro Frontal
9.05
60.48
33.60
50.70
Muro Lateral E2
Tape
10.26
1.00
2.00
16
0.55
8.80
110.00
Carpeta asfltica
m2
9.07
und
Sumideros
0.860
133.44
17.65
10.80
7.20
792.00
m3
9.10
Bombeo de agua
m3
9.11
m2
792.00
1.00
1.00
18
18.00
und
9.09
Estribo E1
66.720
9.06
9.08
5.760
18.00
379.88
1
10.00
5.65
56.50
Estribo E2
Muro lateral E1
10.00
5.65
66.72
133.44
56.50
Muro lateral E2
66.72
133.44
0.00
9.12
Pase provisional
9.13
Barandas Metalicas
und
ml
137.60
2
68.80
137.60
Margen derecha
40.00
3.40
2.00
272.00
Margen izquierda
40.00
3.40
2.00
272.00
en el estribo
10.00
3.40
2.00
136.00
Margen derecha
40.00
9.8
392.00
Margen izquierda
40.00
9.8
392.00
en el estribo
10.00
100.00
Margen derecha
40.00
10.2
408.00
Margen izquierda
40.00
10.2
408.00
en el estribo
10.00
140.00
Margen derecha
40.00
7.00
280.00
Margen izquierda
40.00
7.00
280.00
En el estribo
10.00
5.00
100.00
10.03 Enrocado
m3
680.00
m2
884.00
m3
956.00
10.04
Relleno con material propio para colocacin de enrocado
m3
m3
660.00
0.00
SECCIN
1.00
1.01
Und
CANT
und
LONG
m
ANCHO ALTURA
m
m
pulg
Auxiliar
1.03
1.04
1.05
1.06
Desbroce y limpieza
und
1.00
2.02
2.03
35
40
15
20
0.0001
0.28
600.00
600.00
und
1.00
1
1.00
1.00
2.00
und
1.00
und
2.00
Movimiento de tierras
Excavacin para estructuras no clasificado
m3
3,721.73
Area
Estribo E1
10.50
176.16
1,849.68
Estribo E2
10.50
178.29
1,872.05
m3
0.00
Estribo E1
0.00
Estribo E2
0.00
Muro Laterals E1
0.00
Muro Laterals E2
0.00
m3
Relleno E2
2.05
0.28
2
m2
Relleno E1
2.04
1.00
Ha
Trazo y replanteo
2.00
2.01
TOTAL
Obras Preliminares
Movilizacin y desmovilizacin de equipos
1
1.02
PARCIAL
Eliminacin de material
1,626.24
1
10.50
60.00
630.00
10.50
12.40
130.20
10.50
3.12
32.76
10.50
65.53
688.07
10.50
3.18
33.39
10.50
0.95
9.98
10.50
9.70
101.85
m3
2,795.49
E1
1,056.72
1,056.72
E2
1,038.77
1,038.77
Encausamiento
m3
700.00
1
50.00
35.00
0.40
700.00
0.00
3.00
3.01
3.02
3.03
3.04
Estribos (cimentacin)
Concreto f'c=140 kg/cm2 bajo agua (falsa zapata)
487.60
1
11.50
10.60
243.80
11.50
10.60
243.80
Estribo E1
9.60
10.50
1.60
161.28
Estribo E2
9.60
10.50
1.60
161.28
Estribo E1
9.60
10.50
1.60
322.56
Estribo E2
9.60
10.50
1.60
322.56
Falza zapata
11.50
2.00
92.00
10.60
2.00
84.80
m3
322.56
m2
821.92
kg
25,804.80
Zapata E1
12902.40
12,902.40
Zapata E2
12902.40
12,902.40
4.00
4.01
m3
Estribos (elevacin)
Concreto f'c=210 kg/cm2 en seco (elevacin)
m3
754.45
Estribo E1
10.00
25.57
255.70
Estribo E2
10.00
25.57
255.70
Muro Lateral E1
5.90
15.13
89.27
0.86
37.51
32.26
15.13
89.27
0.86
37.51
32.26
1
Muro Lateral E2
5.90
1
4.02
m2
838.20
Estribo E1
10.00
13.30
133.00
Estribo E2
10.00
13.30
133.00
4.03
SECCIN
Und
LONG
m
ANCHO ALTURA
m
m
pulg
Auxiliar
PARCIAL
Muro Laterales E1
143.05
Muro Laterales E2
143.05
286.10
69.09
690.90
Estribo E2
TOTAL
1,911.01
1
10.00
10.00
1.20
12.00
10.00
69.09
690.90
10.00
1.20
12.00
117.48
234.96
Muro lateral E1
Tape
Muro lateral E2
Tape
286.10
m2
Estribo E1
4.04
CANT
und
10.26
0.86
10.26
0.86
17.65
117.48
234.96
17.65
kg
70,457.61
Estribos
Estribo E1
24291.50
24,291.50
Estribo E2
24291.50
24,291.50
Muro Lateral E1
10937.30
10,937.30
Muro Lateral E2
10937.30
10,937.30
7.00
7.01
7.02
Estructuras metlicas
Fabricacin de estructura metlica reticulada (ASTM A572 G50)
217.64
Brida Superior
28
7.60
0.0205
7.850
34.24
Brida Inferior
32
7.60
0.0226
7.850
43.19
Montante
32
6.72
0.0088
7.850
14.85
Diagonal
64
6.70
0.0140
7.850
47.13
Largueros
96
3.75
0.0045
7.850
12.72
Viga transversal
34
8.90
0.0073
7.850
17.22
Arriostre
56
5.94
0.0046
7.850
12.01
Conexiones y accesorios
36.27
0.00
0
7.03
7.06
0.00
0
7.850
0.00
217.643
217.64
Estructura metalica
7.05
0.00
Pendolas
7.04
7.850
217.64
207.40
Brida Superior
28
7.50
0.0205
7.850
33.79
Brida Inferior
32
7.50
0.0226
7.850
42.63
Montante
32
6.72
0.0088
7.850
14.85
Diagonal
64
6.70
0.0140
7.850
47.13
Largueros
96
3.75
0.0045
7.850
12.72
Viga transversal
34
8.90
0.0073
7.850
17.22
Arriostre
56
5.94
0.0046
7.850
12.01
Conexiones y accesorios
27.05
0.00
0.00
7.07
0.00
0.00
SECCIN
Pintura de viga de alma llena
Und
CANT
und
LONG
m
ANCHO ALTURA
m
m
pulg
Auxiliar
PARCIAL
TOTAL
0.00
0.00
7.09
217.64
1
217.64
und
2.00
2
7.11
Conectores de corte
2.00
13.06
1
6.00
6.01
6.02
6.03
13.06
m3
33.00
2
110.00
0.75
0.20
33.00
110.00
8.70
0.20
191.40
110.00
1.45
319.00
110.00
2.85
m3
191.40
m2
1,082.08
2
Veredas
Encofrado Curvo
627.00
2.04
4.08
110.00
0.40
88.00
110.00
0.20
44.00
m2
0.00
0
6.05
13.06
Losa
6.04
217.64
0.00
kg
30,096.00
Losa
26796.00
26,796.00
Vereda
1650.00
3,300.00
0.00
6.06
Falso Puente
m2
0.00
0
8.00
8.01
8.02
8.03
0.00
Losa de Transicin
Concreto f'c=210 kg/cm2
m3
13.92
2
4.00
8.70
0.20
13.92
4.10
8.90
0.1
7.30
m3
7.30
kg
1,392.00
696.00
9.00
9.01
Varios
Apoyos
und
4.00
4
9.02
9.03
9.04
1,392.00
Pintura asfltica
4.00
17.40
2
8.7
17.40
8.7
17.40
17.40
m2
766.17
Estribo 1
Zapata
Muro Frontal
10.50
10.50
1.600
33.60
9.60
1.600
30.72
10.00
5.650
56.50
10.00
5.070
Muro Lateral E1
Tape
5.760
50.70
66.720
10.26
60.48
0.860
133.44
17.65
Estribo 2
Zapata
Muro Frontal
10.50
10.50
1.600
33.60
9.60
1.600
30.72
10.00
5.650
56.50
10.00
5.070
Muro Lateral E2
Tape
5.760
50.70
66.720
10.26
0.860
60.48
133.44
17.65
SECCIN
Tubos de drenaje PVC 3"-60 cm
Und
Carpeta asfltica
m2
9.07
und
Sumideros
LONG
m
Auxiliar
1.00
2.00
16
0.55
8.80
110.00
PARCIAL
9.06
9.08
ANCHO ALTURA
m
m
pulg
CANT
und
10.80
7.20
792.00
m3
9.10
Bombeo de agua
m3
9.11
m2
792.00
1.00
1.00
18
18.00
und
9.09
TOTAL
18.00
379.88
Estribo E1
10.00
5.65
56.50
Estribo E2
10.00
5.65
Muro lateral E1
66.72
133.44
Muro lateral E2
66.72
133.44
56.50
0.00
9.12
Pase provisional
9.13
Barandas Metalicas
und
ml
137.60
2
68.80
137.60
Margen derecha
40.00
3.40
2.00
272.00
Margen izquierda
40.00
3.40
2.00
272.00
en el estribo
10.00
3.40
2.00
136.00
Margen derecha
40.00
9.8
392.00
Margen izquierda
40.00
9.8
392.00
en el estribo
10.00
100.00
Margen derecha
40.00
10.2
408.00
Margen izquierda
40.00
10.2
408.00
en el estribo
10.00
140.00
Margen derecha
40.00
7.00
280.00
Margen izquierda
40.00
7.00
280.00
En el estribo
10.00
5.00
100.00
10.03 Enrocado
m3
680.00
m2
884.00
m3
956.00
10.04
Relleno con material propio para colocacin de enrocado
m3
m3
660.00
0.00
PRESUPUESTO CIVIL
DESAGREGADO
Partida
Unidad
1.00
P.U.
S./
Metrado
Costo
Metrado
Costo S/.
156211.00
Obras Preliminares
1.01
und
156211.00
1.00
156,211.00
1.00
1.02
Desbroce y limpieza
Ha
1200.00
2.00
2,400.00
0.28
336.00
1.03
Trazo y replanteo
m2
13.63
10000.00
136,300.00
600.00
8178.00
1.04
und
1377.16
1.00
1,377.16
1.00
1377.16
1.05
und
3000.00
1.00
3,000.00
1.00
3000.00
1.06
Sealizacion
und
5000.00
2.00
10,000.00
2.00
10000.00
2.00
Movimiento de tierras
2.01
m3
24.58
1595.03
39,205.71
3721.73
91480.00
2.02
2.03
m3
32.55
0.00
0.00
0.00
0.00
m3
52.35
696.96
36,485.86
1626.24
85133.66
2.04
Eliminacin de material
m3
19.77
3698.07
73,110.75
2795.49
55266.74
2.05
Encausamiento
m3
5.00
2800.00
14,000.00
700.00
3500.00
3.00
Estribos (cimentacin)
3.01
m3
246.94
487.60
120,407.94
487.60
120407.94
3.02
m3
455.78
322.56
147,016.40
322.56
147016.40
3.03
m2
48.15
821.92
39,575.45
821.92
39575.45
3.04
kg
4.55
25804.80
117,411.84
25804.80
117411.84
4.00
Estribos (elevacin)
4.01
m3
455.78
597.63
272,388.35
754.45
343863.77
4.02
m2
51.74
749.22
38,764.64
838.20
43368.47
4.03
m2
34.10
1521.43
51,880.76
1911.01
65165.59
4.04
kg
4.55
55438.67
252,245.94
70457.61
320582.12
6.00
0.00
6.01
m3
455.78
37.40
17,046.17
33.00
15040.74
6.02
m3
515.67
229.21
118,195.17
191.40
98699.24
60791.25
6.03
m2
56.18
1038.62
58,349.67
1082.08
6.04
Encofrado Curvo
m2
72.33
0.00
0.00
0.00
0.00
6.05
kg
4.55
35828.98
163,021.86
30096.00
136936.80
6.06
Falso Puente
m2
172.12
0.00
0.00
0.00
0.00
7.00
Estructuras metlicas
7.01
7.02
18560.00
0.00
0.00
217.64
4,039,452.95
8894.20
346.56
3,082,362.78
0.00
0.00
0.00
0.00
0.00
0.00
7.03
12000.00
7.04
435.92
346.56
151,071.95
217.64
94,874.91
283,579.66
7.05
1367.29
0.00
0.00
207.40
7.06
1709.11
0.00
0.00
0.00
0.00
7.07
1093.83
346.56
379,077.19
0.00
0.00
7.08
1100.00
346.56
381,214.77
0.00
0.00
7.09
2551.36
0.00
0.00
217.64
555,284.99
und
20000.00
2.00
40,000.00
2.00
40,000.00
10000.00
13.86
138,623.55
13.06
130,585.76
7178.13
7.10
7.11
Conectores de corte
8.00
Losa de Transicin
0.00
8.01
m3
515.67
14.08
7,260.63
13.92
8.02
m3
246.94
7.38
1,822.42
7.30
1802.17
8.03
kg
4.55
1408.00
6,406.40
1392.00
6333.60
9.00
Varios
9.01
Apoyos
und
850.00
4.00
3,400.00
4.00
3400.00
9.02
291.16
17.40
5,066.18
17.40
5066.18
9.03
25.00
17.40
435.00
17.40
435.00
9.04
Pintura asfltica
m2
29.05
766.17
22,257.37
766.17
22257.37
9.05
142.40
10.80
1,537.92
10.80
1537.92
9.06
Carpeta asfltica
m2
23.20
792.00
18,374.40
792.00
18374.40
9.07
und
80000.00
1.00
80,000.00
1.00
80000.00
9.08
Sumideros
und
65.95
18.00
1,187.10
18.00
1187.10
9.09
m3
10.50
0.00
0.00
0.00
0.00
9.10
Bombeo de agua
m3
0.00
0.00
0.00
0.00
9.11
m2
22.70
379.88
8,623.28
379.88
8623.28
9.12
Pase provisional
und
20000.00
9.13
Barandas Metalicas
10.00
10.01
10.03
10.04
10.05
ml
400.00
0.00
0.00
0.00
0.00
137.60
55,040.00
137.60
55040.00
OBRAS DE PROTECCIN
Excavacin localizada en material suelto con bolonera
(en seco) para enrocado
Enrocado
Relleno con material propio para colocacin de enrocado
Eliminacin de material excedente de excav.
m3
5.58
680.00
3,794.40
680.00
3794.40
m3
150.00
956.00
143,400.00
956.00
143400.00
m3
35.00
660.00
23,100.00
660.00
23100.00
m3
12.00
0.00
0.00
0.00
0.00
6,422,450
7,448,650
MEMORIA DE CALCULO
HM = 6.80m
a mc
az = 5.80m
h mc
hmc = 2.35m
aM
32
= 0.00
33
amc = 0.30m
aM = 1.00m
hV = 0.00m
HM
1
zd = 0.90m
cz = 1.00m
zt
ai = 1.000 m
zt = 3.90m
ht = 0.50m
k
zd
ht
k= 0
hv
ai
cz
az
Coef.sismico = 0.17
coef hz = 0.170
coef vert = 0.085
Carga
( kN )
265
160
14
117.300
Bra Hz
(m)
1.30m
1.3
Bra Ver
(m)
4.45
8.6
4.45
1
2
3
4
5
6
2
Cargas verticales
Items
DC
Peso muro
EV
Peso relleno
DC
Carga vertical permanente externa
LL
Carga vertical variable externa
EH
Comp.vert. Empuje
LS
SC sobre relleno
EV
Peso relleno en punta
Cargas horizontales
Items
Fuerza
(kN)
248.88
452.40
265.00
160.00
0.00
46.80
9.00
Brazo
(m)
2.299
3.850
1.3
1.3
5.8
3.85
0.45
Momento
(kN.m)
572.09
1741.74
344.50
208.00
0.00
180.18
4.05
Fuerza
(kN)
Brazo
(m)
Momento
(kN.m)
2.267
3.400
4.080
492.69
130.42
184.24
1
2
3
EH
LS
EQ
Comp.hz Empuje
Empuje por sobrecarga
Empuje tierra por sismo (Mononobe Okab
217.37
38.36
45.16
EQ
119.22
3.096
369.08
5
BR
Fza de Frenado
6 CR+SH+TU Fluenc, contrac,temp
7
EQ
Carga ssmica horizontal externa
14.00
26.50
117.30
8.600
4.450
4.450
120.40
117.93
521.99
Combinaciones de Carga
Resistencia I
Resistencia Ia
Resistencia III
Resistencia IIIa
Evento Extremo I
Evento Extremo Ia
maximo
*
1.35
1.50
DC
1.25
0.90
1.25
0.90
1.25
0.90
minimo
0.90
0.90
EV
1.35
1.00
1.35
1.00
1.35
1.00
EH*
1.35
1.35
1.35
1.35
1.50
1.50
LL
1.75
1.75
0.00
0.00
0.50
0.50
BR
1.75
1.75
0.00
0.00
0.50
0.50
LS
1.75
1.75
0.00
0.00
0.50
0.50
Coeficiente de reposo
Coeficiente activo
kAE = 0.430
Eactivo = 136.57 kN
E= 45.16 kN
EAE= 181.73 kN
CR+SH+TU
0.50
0.50
0.50
0.50
0.00
0.00
0.00
32.00
10.53
0.00
0.00
EQ
0.00
0.00
0.00
0.00
1.00
1.00
0.00 rad
0.56 rad
0.18 rad
0.00 rad
0.00 rad
coef hz = 0.17
Exentricidad
Resistencia I
Resistencia Ia
Resistencia III
Resistencia IIIa
Evento Extremo I
Evento Extremo Ia
Servicio I
VL
1627.13
1203.89
1265.23
923.89
1368.63
947.29
1182.08
HL
398.32
398.32
306.69
306.69
506.07
506.07
Mv
4181.87
2934.72
3502.56
2570.72
3696.65
2660.81
3050.56
MH
1163.03
1163.03
724.10
724.10
1642.47
1642.47
861.44
Xo
1.855
1.472
2.196
1.999
1.501
1.075
1.852
e
1.045
1.428
0.704
0.901
1.399
1.825
1.048
VL
1627.13
1203.89
1265.23
923.89
1368.63
947.29
u
0.65
0.65
0.65
0.65
0.65
0.65
Fr
1056.67
781.81
821.65
599.98
888.80
615.18
s
0.80
0.80
0.80
0.80
1.00
1.00
s.Fr
845.338
625.451
657.322
479.984
888.801
615.176
HL
398.32
398.32
306.69
306.69
506.07
506.07
emx
1.450
1.450
1.450
1.450
1.933
1.933
Margen de
diseo
%
27.95
1.49
51.45
37.85
27.63
5.60
Deslizamiento
Resistencia I
Resistencia Ia
Resistencia III
Resistencia IIIa
Evento Extremo I
Evento Extremo Ia
Capacidad portante
lt =
FS.adm.r
Margen de diseo
%
52.88
36.31
53.34
36.10
43.06
17.74
0.505 MPa
Presin rectangular
equivalente
Presin trapezoidal
Resistencia I
Resistencia Ia
Resistencia III
Resistencia IIIa
Evento Extremo I
Servicio I
(1)
VL/B
280.54
207.57
218.14
159.29
235.97
203.81
(2)
6VL.e/B
303.18
306.70
158.87
148.51
341.53
220.97
mx
( Mpa)
0.585
0.545
0.377
0.308
0.608
0.426
min
Long.
(Mpa)
Comprimida
0.000
5.566
0.000
4.415
0.059
5.800
0.011
5.800
0.000
4.503
0.000
5.556
m
( Mpa)
0.439
0.409
0.288
0.231
0.456
0.319
<
<
<
<
<
0.505
0.505
0.505
0.505
0.671
Mal
HS20
40.00 m
2
7
4
2.80 m
2.58 m
2.50 t/m
2.20 t/m
II
ANCHO DE CALZADA
ESVIAJE ( )
ESPESOR DEL ASFALTO
ESPESOR DE LA SILLETA (m)
ANCHO DE SILLETA (m)
PESO DE BARANDA POR METRO
ESPESOR DE LOSA (m)
ANCHO DE VEREDA
9.00 m
0.00
0.075 m
0.00 m
0.00 m
0.5
t/m
0.25 m
1.00 m
3982.47 lb/plg
3515.41 kg/cm
Fu= 65 Ksi
E = 29000 Ksi
DESCRIPCION
cm
45.00
2.80
50.00
3.800
200.00
1.60
636.00
AREA
pulgadas
17.72
1.10
19.69
1.50
78.74
0.630
98.58
=Long tramo
SECCION INTERMEDIO
SECCION EXTREMOS
cm
pulgadas
45.00
17.72
2.80
1.10
50.00
19.69
3.200
1.26
200.00
78.74
1.60
0.630
606.00
93.93
Long.Tram 10.00 m
cm
45.00
2.80
45.00
2.800
200.00
1.60
572.00
pulgadas
17.72
1.10
17.72
1.10
78.74
0.630
88.66
Relacin modular
n = Es / Ec = 8.37
USE
n= 8
USE
USE
b 2.70 m
b 2.80 m
2.800 m
Viga Interior
2.80 m
3.08 m
( 106.3 plg)
Viga exterior
2.38 m
2.61 m
bf
2 .t
bf
12
f
h
6
t f 1.1t w
0.1
I yc
I yt
10
2.Dcp
E
3.76
tw
Fyc
33.33333333
33.33333333
1.76
1.76
1.76
0.537
0.638
VEREDAS
1.000
X1 =
X2 =
X3 =
X4 =
0.2
0.8
0
0.1
A1 =
A2 =
A3 =
A4 =
A5 =
A total concreto =
0.600
Y1 = 0.1
Y2 = 0.25
Y3 = 0.25
0.400
0.200
0.020
0.030
0.200
0.013
0.000
0.26 m
0.000
0
0.2
0.4
0.6
0.8
AREA ASUMIDA
Area tabiqueria =
Area vereda =
III
PESO
0.000 t/m
0.656 t/m
0.00 m
0.26 m
= 0.656 t/m
METRADO DE CARGAS
CARGA PERMANENTE INICIAL soportadas por la viga de acero
III. 1
VIGA EXTERIOR
SECCION CENTRAL
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
VIGA EXTERIOR
SECCION INTERMEDIA
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
VIGA EXTERIOR
SECCION EXTREMOS
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
VIGA INTERIOR
SECCION CENTRAL
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
VIGA INTERIOR
SECCION INTERMEDIA
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
VIGA INTERIOR
SECCION EXTREMOS
PESO PROPIO VIGAS
PESO LOSA DE CONCRETO
1.300 t
3 x 1.3 x 40
4
39.000 t m
40.0 m
MDC1 =
44.247 t
4.550 t
48.797 t
445.14 t.m
40.0 m
MDC1 =
445.14 t.m
III. 2
MDC2 =
Mw =
IV
115.63 t.m
74.25 t.m
11.563 t
7.425 t
HL 93
Momento
Camin 292.39 t.m
Carril 189.60 t.m
vereda 124.81 t.m
HS20
Momento
Camin 288.29 t.m
Carril 272.14 t.m
Cortante
30.78
18.96
12.48
gV i =
gVe =
0.540 interior
0.472 exterior
0.909 interior
0.634 exterior
= 20%
= 33%
rV.skew =
1.000
AASHTO ESTNDAR
AASHTO LRFD
Luego: Las mximas Fuerzas Cortantes y Momentos Flectores por accin de la s/c es:
HS20
MS/C+I = 288.29 t.m x 0.54 x (1 + 0.195) =
186.10 t.m
VS/C+I = 30.34 t x 0.91 x (1 + 0.195) =
32.975 t
HL 93
MS/C+I = 0.54x(292.39(1+0.33)+189.6)+124.81/4 =
VS/C+I = 0.9093x(30.78(1+0.33)+18.96)+12.48/4 =
Cortante
30.336 t
30.842 t
VIGA INTERIOR
343.58 t.m
57.585 t
Luego: Las mximas Fuerzas Cortantes y Momentos Flectores por accin de la s/c es:
interior
MS/C+I = 0 t.m x 0 x (1 + 0.195) =
162.70 t.m
VS/C+I = 0 t x 186.1 x (1 + 0.195) =
22.994 t
Para Momentos
MS/C+I = x((1+343.580998)+Para cortantes)+/kg/cm =304.30 t.m
VS/C+I = 186.09531145737x((1+343.580998)+)+/kg/c 41.100 t
VIGA EXTERIOR
y estado lmite
D 0.95
L 1.05
R 0.95
resist round D R L 2
D 1.00
L 1.00
R 1.00
resist 0.95
serv round D R L 2
serv 1
Estado
Lmite
Resistencia I
Servicio II
Fatiga
EQ
-
r 1.00
Corte
v 1.00
Compres in Axial
c 0.90
10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50
Msc+Imp
MDC1
MDC2
MDW
0
0.05L
0.10L
0.15L
0.20L
0.25L
0.30L
0.35L
0.40L
0.45L
0.48L
0.50L
0.55L
0.60L
0.65L
0.70L
0.75L
0.80L
0.85L
0.90L
0.95L
1.00L
0.00 m
2.00 m
4.00 m
6.00 m
8.00 m
10.00 m
12.00 m
14.00 m
16.00 m
18.00 m
19.29 m
20.00 m
22.00 m
24.00 m
26.00 m
28.00 m
30.00 m
32.00 m
34.00 m
36.00 m
38.00 m
40.00 m
0.00
23.71
44.93
63.66
79.88
93.61
104.84
113.58
119.82
123.57
124.66
124.81
123.57
119.82
113.58
104.84
93.61
79.88
63.66
44.93
23.71
0.00
0.00
36.02
68.26
96.70
121.34
142.20
159.26
172.54
182.02
187.70
189.36
189.60
187.70
182.02
172.54
159.26
142.20
121.34
96.70
68.26
36.02
0.00
0.05
28.62
55.92
79.86
101.16
118.70
132.64
143.27
150.39
154.54
155.68
155.69
154.05
149.19
141.18
130.18
115.29
96.94
76.11
51.70
26.01
0.00
0.03
40.90
78.57
111.71
140.77
165.06
184.68
199.81
210.31
216.54
218.31
218.47
216.23
209.56
198.49
183.14
162.92
138.13
109.35
75.92
39.27
0.00
0.00
84.10
159.40
225.90
283.61
332.52
372.58
403.74
426.00
439.36
443.25
443.81
439.36
426.00
403.74
372.58
332.52
283.61
225.90
159.40
84.10
0.00
0.00
21.97
41.63
58.97
74.00
86.72
97.13
105.22
111.00
114.47
115.48
115.63
114.47
111.00
105.22
97.13
86.72
74.00
58.97
41.63
21.97
0.00
0.00
14.11
26.73
37.87
47.52
55.69
62.37
67.57
71.28
73.51
74.16
74.25
73.51
71.28
67.57
62.37
55.69
47.52
37.87
26.73
14.11
0.00
12.36
11.39
10.54
9.76
8.92
7.69
6.95
6.22
5.47
4.34
3.95
2.32
4.01
5.21
5.96
6.66
7.63
8.40
9.16
10.21
10.70
10.75
18.96
17.06
15.17
13.27
11.38
9.48
7.58
5.69
3.79
1.90
0.67
0.00
1.90
3.79
5.69
7.58
9.48
11.38
13.27
15.17
17.06
18.96
25.57
23.23
21.00
18.83
16.61
14.06
11.92
9.79
7.64
5.17
3.87
1.96
4.89
7.42
9.57
11.67
14.00
16.17
18.33
20.72
22.66
24.21
0.250 L
0.750 L
10.00 m
30.00 m
93.61
93.61
142.20
142.20
69.16
65.20
149.86
147.02
332.37
332.37
86.72
86.72
55.69
55.69
10.11
9.63
9.48
9.48
22.41
21.83
Resistencia 1
x
20
10
20
As =
As1 =
Mu
1133.34 t.m
851.62 t.m
1133.34 t.m
10.60 cm
5.00 cm
d=
d1 =
21.50 cm
3.50 cm
Eje neutro cae:
Y=
Mp =
Ps
Prt
Prb
Pc
Pw
Pt
1666.00
44.52
21.00
442.94
1124.93
667.93
t
t
t
t
t
t
en Prb
losa C encima de
Prb
32.57
21.50
33.20
29.07
11.07
-6.17
95.23
197.13
2729.35
18.00
0.00
4.90
106.30
208.20
2770.16
29.70
-11.70
-6.80
94.60
196.50
2724.57
Y
Losa
Refuerzo Longitudinal de la losa
Ala en compresin
Alma
Ala en traccin
Y=
Ps
Prt
Prb
Pc
Pw
Pt
1666.00
44.52
21.00
442.94
1124.93
562.47
t
t
t
t
t
t
en alma
en el ala
-43.30
1.26
-28.00
13.76
-19.00
22.76
-37.00
4.76
-41.90
101.54
244.90
203.14
2426.66
2528.35
en alma
en el ala
losa C debajo
de Prb
en Prb
losa C encima de
Prb
30.98
21.50
31.61
27.48
9.48
-4.58
96.82
198.42
2518.93
18.00
0.00
4.90
106.30
207.90
2548.91
28.11
-6.61
-6.61
96.19
197.79
2509.35
2528.35 t.m
en alma
en el ala
-48.63
1.07
Losa
Ps
1606.50 t
-33.33
13.57
Refuerzo Longitudinal de la losa
Prt
44.52 t
-24.33
22.57
Prb
21.00 t
-42.33
4.57
Ala en compresin
Pc
442.94 t
-47.23
Alma
Pw
1124.93 t
101.73
Ala en traccin
Pt
442.94 t
250.03
203.13
2148.12
2276.42
en alma
en el ala
Y=
30.27cm El eje neutro plstico cae en losa C debajo de Prb
Y
Mp =
losa C debajo
de Prb
2744.41 t.m
Mp =
en alma
en el ala
-33.92
1.59
-18.62
14.09
-9.62
23.09
-27.62
5.09
-32.52
101.21
235.82
203.11
2681.99
2744.41
en alma
en el ala
2276.42 t.m
Mn
M p if Dp 0.1Dt
Mn
M p
1.07 0.7
Dp
Dt
if D 0.1D
p
t
losa C debajo
de Prb
en Prb
losa C encima de
Prb
30.27
21.50
30.93
26.77
8.77
-3.87
97.53
198.93
2269.30
18.00
27.43
-9.43
-4.53
96.87
198.27
2265.48
4.90
106.30
207.70
2294.03
0<x<10
10< =x <20
20< =x <20
Dp
26.071
26.449
26.782
Dt
230.600
231.000
231.600
0.1Dt
23.060
23.100
23.160
Ductilidad
Cumple
Cumple
Cumple
Mn
2244.59 t.m la seccin es adecuada por flexin
2483.52 t.m la seccin es adecuada por flexin
2695.01 t.m la seccin es adecuada por flexin
Corte
C Vp
Vn
Vcr
Vp
0.58 Fyw D tw
k= 5
altura del alma
espesor del alma
Esfuerzo de fluencia del alma
Mdulo de elasticidad del acero
C = 0.291392
Vn=
190.12 t
225
Vu
200
175
Vn
150
Vn
125
100
75
50
25
0
-25 0 1 2 3 4 5 6 7 8 9 1011121314151617181920212223242526272829303132333435363738394041424344454647484950
-50
-75
-100
-125
-150
-175
-200
-225
do =
espaciamiento en el apoyo
k = 13.889
C = 0.80418461
Vu =
161.39 t
Vn=
524.70 t
1.50 m
do =
5.00 m
k = 5.800
C = 0.33801472
Vu =
161.39 t
V n
0.58 F yw D tw
C
0.58 F yw D tw
C
Vn = 292.91 t
2 D t w
if b t b t 2.5
fc fc
ft ft
do
1
D
0.87 ( 1 C)
ot herwise
2
d
d
o
o
1
D
D
0.87 ( 1 C)
BIEN
19 mm
100 mm
3 (# de conectores por seccin)
n=
14.79
3.569
4.3
9
Impacto =
0.15
x=
gVfatiga = 0.528
Fu
3500 kgf/cm
POR FATIGA
El espaciamiento de los conectores debe satisfacer la siguiente ecuacin
Ns = 10950000
= 238-29.5*Log(Ns) =
d=
19 mm
Zr =
luego
para
x=
30.337
1.11707945 ton
p = 53.81 cm
10.0 m
Vr =
p = 63.11 cm
13
11.12 t
POR RESISTENCIA
Para el estado lmite de resistencia, El cortante factorado de corte en los conectores Qr, es evaluado com sigue:
Qr = sc*Qn
sc =
0.85
la resistencia del conector de corte es:
Qn
donde Asc =
kgf/cm
Ec losa = kgf/cm
f'c losa =
2.84
Qn = 9.92 t
Qr = 8.43 t
El nmero de conectores de corte, suministrado entre la seccin de mximo momento positivo y momento nulo,
debe ser como mnimo los siguiente
#=
Vh/Qr
Vh2=0.85.f'c.b.t = 1606.50 t
As = 636 cm
fy = 3515 kgf/cm
RIGE
b = 270
t = 25
f'c = 280
Vh = 1606.50 t
#=
54
t
t
m
m
cm
cm
kgf/cm