Documente Academic
Documente Profesional
Documente Cultură
JT262.12
Edition 00 01/2014
Maintenance
Page 1
4.4.6
JT262.12
Edition 00 01/2014
Maintenance
Page 2
JT262.12
Edition 00 01/2014
Maintenance
Page 3
4.4.6.4 Assembly counter jib JP23 & JP26 (for jib lenths 35-40-45m)
JT262.12
Edition 00 01/2014
Maintenance
Page 4
4.4.6.4 Assembly counter jib JP22 & JP23 & JP26 (for jib lenths50-55-60-65-70m)
JT262.12
Edition 00 01/2014
Maintenance
Page 5
JT262.12
Edition 00 01/2014
Maintenance
Page 6
Maintenance
Page 7
4.4.6.9
JT262.12
Edition 00 01/2014
Maintenance
Page 8
JT262.12
Edition 00 01/2014
Maintenance
Page 9
Maintenance
Page 10
JT262.12
Edition 00 01/2014
Maintenance
Page 11
JT262.12
Edition 00 01/2014
Maintenance
Page 12
Balance weight on
hook (t)
Trolley distance D
(m)
JT262.12
Edition 00 01/2014
35
3.4
3.0
40
3.4
3.0
45
1.7
3.0
50
3.4
3.0
55
1.7
3.0
60
1.7
3.0
65
1.7
3.0
70
1.7
3.0
Maintenance
Page 13
JT262.12
Edition 00 01/2014
Maintenance
Page 14
JT262.12
Edition 00 01/2014
Maintenance
Page 15
JT262.12
Edition 00 01/2014
Maintenance
Page 16
- Operate the hydraulic station as lower direction to make the mast (4) insert into the
fishplate(5), fix the mast by pins and cotter pin as the detailed figure B. Lift the ladder
connecting on (6) and insert its supporter into the lower mast ladder.
- Loosen the bolts of the monorail trolley on the four connecting points of the mast(8), push
the trolley out the frame.
JT262.12
Edition 00 01/2014
Maintenance
Page 17
JT262.12
Edition 00 01/2014
Maintenance
Page 18
No.
1
2
3
4
5
6
7
Quantity
1
1
1
2
1
2
2
4
JT262.12
Edition 00 01/2014
Name
2m Anchorage fram
Front girder
Rear girder
Lateral girder
Diagonal bracing
Bracket
Bracket
Shim
L
2850
2580
2595
2190
1568
756
580
415
I
2580
770
490
420
160
630
630
140
H
670
335
335
296
170
345
345
670
P(dan)
1550
335
225
108
55
85
75.5
40
Maintenance
Page 19
4.6.3 Attach
4.6.3.1 Perface
- Beyond the free standing height of railmounted or static crane, the crane must be connected
either to the ground by anchorage by guy ropes or to the building by rigid anchorages.
- For each utilization of anchorages on cranes with chassis, please consult us.
- The present brochure deals only with the rigid anchorages to the building. For anchorages by
guy ropes please consult our AfterSalesService. In addition, the device is described in
another brochure.
- The mast compositions, the position of the anchorages as well as the loads applied on the
frames are indicated in the chapter 2
4.6.3.2 General rules
Positioning the crane:
When it is a crane on railmounted chassis, move it in its static position, tighten the rail
clamps and disconnect the travelling gear. Consult us in order to know the special conditions for
this installation.
In certain cases it is necessary to telescope an additional mast section so that the anchorage
frame can be fitted.
Important: Under these conditions the crane is no longer normally autonomous, and it is
forbidden to work and to let the crane free out of service.
When telescoping check the perpendicularity of the crane in both planes in order to avoid any
variation of distance between crane tower and building.
Instruction: In oder to ensure good connection between frame and crane tower and to prevent
the mobile wedges (1 ) from falling down, it is essential to turn the pieces carrying the welded
wedges (2) so that the fitting corresponds ( Detail A Figure 1 ).
JT262.12
Edition 00 01/2014
Maintenance
Page 20