Sunteți pe pagina 1din 7

PRC Lic.

# 0010698
Driving Lic. # N0574-018227
TIN # 154-999126
SSS # 036200878-2
RESUME
Phil. Health # 19090215892-1
Pagibig # 701298610
No.:G.
3388291
OPassport
Romeo
Baron
Expire Date: Aug 15, 2016
W/ SAUDI DRIVER
LICENSE

Resume
Of
Romeo G. Baron
40 P Galauran Street. 7th Avenue
West Grace Park Caloocan City

E-mail: rbaron32@yahoo.com

Mobile # 0905-4194222 Tel # +63-2 3639438

ELECTRICAL & MECHANICAL ENGINEER


SUMMARY OF EXPERIENCE
Experienced in all phases of Mechanical, Electrical, Electronic and Electromechanical
activities including PRIMAVERA 6 , Cost Estimating, Scheduling, Field Supervision,
Maintenance, Specification, Calculation, Installation, Inspection, Testing &
Commissioning, Fabrication, Method of Statement, Manpower & Material, Periodic
Maintenance shutdown. Well versed in all types of Mechanical, Electromechanical, and
Electrical Construction projects.
PROJECT TYPES AND ACTIVITIES
Dubai Metro Train MRT Jebel Ali Depot.
Beverage Bottling Plant
Food processing and Packaging
Ice Plant and Cold Storage
CO2, O2 Chemical Gas Plant
Waste and Water Treatment Plant

Training and Seminar:


Vertical Packaging Equipment
Komatsu Packaging Co.
Singa, Japan
Power Coating Maintenance
Nordson Co. (U.S.A.)
Ankara, Turkey
Revit MEP
Microcadd, Cubao Phil.
Operation Adjustment and Preventive
Maintenance
Pepsi Cola 4th GMA
Operation and Water Treatment Plant
Pepsi Cola 4th GMA
Programmable Logic Controller
Meralco Foundation
Ortigas, Metro Manila

Refrigeration Air Conditioning


Radio TV Electronics
Machine Shop Practice
Revit MEPF AutoCAD

PERSONAL DATA
Born March 28, 1967
Far Eastern University
Morayta, Manila, Philippines
B.S. in Mechanical and Electrical
Engineering
Torres Eve. Voc. Sch.
Tondo, Manila
Radio-TV Electronics
Machine Shop Practice
Refrigeration and Air Conditioning

Training and Seminars


High Speed Automated Multihead
Weigher Machine

Ishida Scales Mfg. Co.


Shogoin, Sokyo-Ku, Kyoto, Japan
Automatic Horizontal, Vertical Packaging
Equipment
Fuji Packaging Machine, Ltd.
Nishi-Ku, Nagoya Japan
Powder Coating Equipment
Wagner Co. (Germany)
ShenzhenChina, Wan-Chai Hongkong
Instrumentation Process Control
University of the Philippines (ISSI)
Diliman, Quezon City

PRIMAVERA 6 Project Management


Recto, Manila

GALI BATU DEPOT MRT PROJECT


LAND TRANSPORTATION AUTHORITY
SINGAPORE
April 2013 to June 2014
Position: HENO Higher Engineering Officer (E&M) MEPF
Duties & Responsibilities:
1. Experience in MRT Depot Project consisting of Administration/Workshop,
Examination/Overhaul Track, Central Warehouse, Load Center, Sprinkler Tank
& Pump room, Maintenance/Locomotive Workshop, Auto/ Manual Train Wash
Plant, Stabling Siding, Waste Water Treatment Plant, Test Track centre. in the
installation of Ventilation & Air Conditioning YORK SCREW Freon (410a)
Compressor, AHU, FCU, Stainless Heat Exchanger, Chilled & Condensate Bell &
Gussettes pumps, Baltimore Cooling tower, Balancing, Motorized, By-pass Valve.
VAV, CAV, Non-return, Butterfly, Drain, Air Vent Valve, Spring Isolator, flexible
coupling, thermostat, Automatic thermal expansion valve, AC drain pipe, air
balancing, fire pump, motorized damper, grille / diffuser, flexible duct, Supply &
Return duct, Fresh / Exhaust duct, Thermo Break duct Insulation, pressure
vessel, Potable and Non-potable, DX split and VRV system.
2. Experience in MEPF, Aragonite clean gas suppression and Sprinkler Fire
Protection system, fire alarm system, MAP SAP, Jolly Magnum, Deluge, Preaction & Control valve, Main Fire Pump, Jockey pump, Fire Hydrant, Dry Riser,
Bridging inlet, fire Hose Reel cabinet, saddle clamp, B.I. seamless pipe, HDPE
fusion pipe, Threaded G.I. pipe, high pressure BI seamless wieldable pipe,
drainage and sanitary plumbing.
3. Develop a construction schedule for Project Management Information (PMI)
preferred daily, weekly and monthly activities, (BOQ) Bill of Quantity RFI
(Request For Information), Engineer Instruction, DAR, Manpower and work
progress schedule, electrical layout, preparation of technical specification,
procurement, Site Instruction / Inspection, material takeoff and delivery , and
engineering proposal and Method of Statement , (FCR) field change report,
(ITR) Inspection and Test Report, DAS and monitor accomplishments of
project.
4. Perform Initial and Final Commissioning of low, medium and high voltage
switch gear, transformer, Load center substation, Earthings & Lightning system,
UPS, ATS, Rectifier, MTS, LMCP, Power panel, DC Traction Power system,
Building, Access & Security Management System, CCTV, Direct digital control,
Magnetic card reader, Security system, & Car park management system, Guard
tour system, MCC, Genset, Cable pulling & layout, Electrical Cable trunking,
tray and ladder & conduit, termination of electrical motors & control, Switch
gear. Including Power & Control circuit diagram.
5. Maintain and troubleshoot electrical & mechanical equipment, preventive and
corrective Maintenance & Operation of equipment and monitor all parameters
during turnover of project.

Leighton Contractor Philippines


ELECTRO SYSTEM
Ayala, Makati
September 2010 to April 2013
Position: MEPF Project Engineer
Duties & Responsibilities:
1. Experience in installation & (TCOM) Testing Commissioning Operation
Maintenance of (HVAC) consisting of chillers, shell & tube Evaporator/
Condenser, Chilled & Condensate pumps, cooling tower, centrifugal/ screw/
rotary compressor, AHU, FCU, Balancing and Butterfly valve, Motorized, Bypass, Non-return valves, Victaulic valve, supply, return, fresh and exhaust duct,
Transfer duct, Thermobreak insulation, supply and return BI seamless pipe,
anti-hammering device, spiral and flexible ducting, variable air volume, volume
control and motorized fire damper, Belimo actuator, air boothe, grilles and
diffuser. AC condensate drain pipe.
2. In charge for installation of (BMS) Building Management System, Chiller
management system, PC workstation, server, UPS, 8-16 port network switch,
access control switch, Direct Digital Controller, B-Link repeater, smoke & heat,
C02 sensor, Carbon Monoxide, LPG & DIESEL Leak detector, temperature,
flow switch, Distribution Board, FCU, general exhaust fan, motorized damper,
VAV controller, FCU, AHU, BTU meter, generator set, BCX, BACnet gateway
router, high and low level sensor, differential pressure (SMS) Security
Management System CCTV, STP wire combus, TF wire, CAT 5 UTP cable,
Ethernet TCP/IP, Pelco IP and PTZ Camera, IDF 24 port network POE Switch,
network video recorder, DS control point PC workstation (ACS) Access Control
System HID card reader, sprint electromagnetic door lock ACX 5740 Controller,
PC workstation, Ademco door contact, 24 universal input such as Car Park
Barrier Management System, Access Control Management System , in and out
loop detector, gate barrier, HID 5355 Card Reader, ticket validator, ACX 5740
Controller, PC workstation.
3. Supervise the installation of FM 200 Gas Suppression and Fire sprinkler
protection, bridging inlet valve, deluge valve, sprinkler nozzle, Notifier
Honeywell USA/ Telefire by Israel, BI seamless saddle pipe & threaded Black
Iron pipe, sanitary cast iron pipe, HDPE potable water pipe, non-potable pipe,
drainage, floor drain, water meter, floor clean out, water sensor, water closet,
urinal / lavatory basin, soil and vent pipe, flush valve, main fire pump and
jockey pump, fuel, transfer pump, pressure and leak test.
4. Monitor installation of Electrical steel cable tray, rack, unistrut, hanger support,
IMC pipe bending and off setting, Electrical steel trunking, threading, Wiring
light for Dolley System and socket, clipping, cable dressing, termination and
testing, power system, substation and plant room, transformer, distribution
board, motor control center, Power factor correction, Generator, Bus bar duct
and power installation works associated with HVAC and Chiller.

DUBAI METRO MRT DEPOT


OBAYASHI KAJIMA MITSUBISHI
JAPAN TURKEY METRO JOINT VENTURE
DEIRA, DUBAI
February 2008 to June 2010
Position: MEPF Site Engineer (Jebel Ali Depot)
Duties & Responsibilities:
1. Experience in installation of (HVAC) Heating Ventilation & Air Conditioning
CARRIER Centrifugal Freon (134a) Compressor, AHU, FCU, Stainless Heat
Exchanger, Chilled & Condensate Bell & Gussettes pumps, Baltimore Cooling
tower, Balancing, Motorized, By-pass, Non-return, Butterfly, Drain, Air Vent
Valve, Rubber anti-vibrator coupling, thermostat, Automatic thermal expansion
valve, AC drain pipe, air balancing, fire pump, motorized damper, grille /
diffuser, flexible duct, Supply & Return duct, Fresh / Exhaust duct, Thermo
Break duct Insulation, pressure vessel, Potable and Non-potable, DX split and
package system.
2. Experience in MEPF, FM 200 gas suppression and sprinkler firefighting system,
fire alarm system, Honeywell Notifier, jolly magnum, deluge valve, Jockey pump,
fire hydrant, bridging inlet, fire hose reel cabinet, saddle clamp, B.I. seamless
pipe, HDPE fusion pipe, high pressure BI seamless weldable pipe, drainage and
sanitary plumbing.
3. Develop a construction schedule for Project Management Information (PMI)
preferred daily, weekly and monthly activities, (BOQ) Bill of Quantity RFI
(Request For Information), Manpower and work progress schedule, electrical
layout, preparation of technical specification, procurement, Site Instruction /
Inspection, material takeoff and delivery , and engineering proposal and method
of statement , (FCR) field change report, (ITR) Inspection and Test Report, DAS
and monitor accomplishments of project.
4. Perform Initial and Final Commissioning of low, medium and high voltage
switch gear, transformer, substation, Earthlings system, UPS, ATS, Rectifier,
MTS, LPP, Power panel, DC power system, Building & Security management
system, CCTV, Direct digital control, Magnetic card reader, Security system,
MCC, Genset, Cable pulling & layout, Electrical Cable trunking, tray and
ladder & conduit, termination of electrical motors & control, (GIS) Gas
Insulated Switch gear.
5. Maintain and troubleshoot electrical equipment, preventive and corrective
Maintenance & Operation of equipment and monitor all parameters.
6.

Knowledgeable in stick and oxy- acetylene welding, industrial planning and


function of pneumatic and hydraulic system, gear box, pump.

SAUDI SWISS ELECTRO MECHANICS COMPANY


Riyadh, K.S.A.
From: March 2002 to October 2007
Position: Project Engineer
Duties and Responsibilities:
1. In charge of installation testing and commissioning, operation and maintenance of
reverse osmosis, electro dialysis reversal process water treatment plant from the
deep well and sea water pumps, elevated raw water storage tank, multi sand
filtration, Clarifier, micro filtration, reverse osmosis module, Ultra filtration,
Ozonator, then to the CO2 removal unit and lastly to the treated water storage tank.
2. Responsible for the maintenance and installation of electrical & mechanical
equipment ranging from multi-stage submersible pumps, non-return valves,
motorized butterfly valves, gate valves, compressor, digester, booster pumps, dosing
pumps for chemicals such as polyelectrolyte, hypochlorite, hexametaphospate,
sulfuric acid, sodium carbonate, lime.
3. Repair and trouble shoot electrical motors control panel, relay panel, telemetric
panel, recorder, level sensor, flow sensor. Electric trouble such as earth leakage,
overload, over voltage, motor winding and pump bearing, over temperature,
undercurrent, incomplete sequence. Perform water analysis of total alkalinity, total
dissolve solid. T.A.C. T.H. from the sample water of the clarifier, sand filtration,
reverse osmosis demineralized water, digested lime and sodium carbonate tanks.
4. Operate diesel engine power plant whenever there is power interruption and
synchronize stand by generators for the increase of power demand.
5. Supervise construction site to insure that construction alteration and repairs
conform to safety standard.
6. Prepares bill of quantity and cost estimates of electrical and mechanical equipments.
7. Draw electrical plans and interpret a circuit during electrical fault and modification
for automation purposes.
8. In charge of piping installation for network distribution using ductile pipe, B.I.
seamless pipe P.V.C. fusion pipes, stainless pipes, fiber glass pipes.
9. Trained workers for a particular job specifically in the installations of electrical
wirings, proper splicing, and termination of cables jointing.

SAUDI REFRIGERATION & INDUSTRIAL GAS CO.


Jeddah, Makkah Road, K.S.A.
From: May 1996 to January 2002
Position: Operation & Maintenance Engineer
Duties and Responsibilities:
1. In charge of COLD STORAGE and ICE PLANT installation, testing and
commissioning, operation, supervision and maintenance of mechanical and electrical
equipment. Consisting of low and high stage ammonia MYCOM compressor, shell
and tube evaporative condenser, cooling tower, Fan Coil air cooler, convertible fan,
water pump, condensate drain pipe heater, -34C and -9C surge drum, accumulator
transfer drum, ammonia receiver, bare pipe, electronic gas purger, oil pot, thermal
expansion valve, solenoid valve, globe valve, throttle valve, needle valve, electrical
wiring of control panel and MCC including load computation.
2. In charge of CARBON DIOXIDE PLANT installation, operation, supervision and
maintenance of the plant supplied by CO2 Buse and Wittemann Hasselberg
Company such as CO2 Condenser, MYCOM low & high stage 502 Freon
Compressor, Relief valve, Automatic Thermostatic valve, Solenoid and check valve,
intercooler, Control panel, CO2 dryer, moisture separator, pre-cooler, Flue gas
cooler, Heat Exchanger, Granulated Activated Carbon Filter, potassium
permanganate, MEA (Monoethalnolamine), Scrubber, Stripper Tower, Buffer tank,
absorber tower, Pumps, Stock Gas Cooler, Blower, Boiler and Burner.
3. Control water treatment plant, softener, iron exchanger, chlorination and DE
..Chlorination boiler.
4. Supervise maintenance, prepare mechanical and electrical design, cost estimate and
...working drawings regarding electrical works, and insure the implementation of
...preventive maintenance in all the areas as per the manufacturer for
...recommendation according to manuals and operation.
5. Responsible for the operation and maintenance of diesel generating power station
...and electrical works such as underground overhead distribution and transmission,
...sub-station power and for full details of electrical works.
6. In charge of piping installation for network distribution using hub & spigot ductile
pipe, P.V.C..Pipes, threaded pipe, stainless pipes, fiber glass pipes.

PEPSI-COLA BOTTLING COMPANY


Muntinlupa, Philippines
From: September 1992 to February 1996
Position: Production Maintenance Engineer
Duties and Responsibilities:
1. Responsible for the production and maintenance of electrical and mechanical
equipment such as depalletizer, uncaser, decapper, bottle washer, electronics bottle
inspector, bottle filler, bottle conveyor, case washer, palletizer, carbo- cooler, valves,
air lift hydraulic cylinder, stainless conveyor.
2. Responsible for the required quantity and quality of goods produces at the lowest
investment and operating cost.
3. Develop guidelines for speed relationship between individual pieces of equipment.
Proper equipment selection, equipment positioning and synchronization, specific
design criteria based on operating experience.
4. Make plans and carry through all operations to turn a block of metal in to an
intricate part meeting precise specifications which must be able to set up and
supervise all major metal working machines such as shapers, grinders, drill presses,
mill and lathe machines.
5. Translate new ideas, rough sketches, specifications and calculations of engineers and
designer into plans that show exact physical dimensions.
6. Supervise blue collar workers, duties vary widely but often include training new
employees, assigning work, and maintaining productivity.
7. Design, develop and supervise facilities for generating and distributing electric
power from substation, switchgear, generator, main control center to motor controls.
8. Motivate subordinates in upgrading their morale and encourage them to maintain
and improve their work to attain maximum efficiency.
9. Conduct fast track meetings regularly to determine materials states and availability.
10. In charge in the overhauling of mechanical & Electrical equipment during periodic
shutdown to insure normal operation.
11. Modify chain conveyor in flex corner, brush corner, dead plates, chain speed
differential, guide rails and washer in feeds.

S-ar putea să vă placă și