Documente Academic
Documente Profesional
Documente Cultură
1. SCOPE OF TEST
The purpose of test was to check and assess the following :
1.1 Laboratory Test :
Checking of Specifications
Hardness of soil engaging components of plough
Wear analysis of soil engaging components
Chemical analysis of soil engaging components
1.2 Field Test :
Quality of work
Rate of work
Power requirement
Ease of operation and adjustment
FMP/IT&TC/
Imp No: /2015
IS 9813: 2002 Tractor-operated Blade terracer specification, IS: 4468-2001 (Pt-I)Agricultural wheeled tractors-Rear mounted three point linkage
IS/ISO 7451 : 2007 (Superseding IS 12192 : 1993) Earth-Moving Machinery
Volumetric Ratings For Hoe-Type And Grab-Type Buckets Of Hydraulic Excavators
And Backhoe Loaders.
IS 12645 (1993): Earth-moving machinery - Crawler and wheel tractor dozer blades Volumetric ratings [MED 7: Material Handling Systems and Equipment]
IS/ISO 20474-1 Earth-Moving Machinery Safety Part 1 General Requirements
IS 7651 (1997): Wire Reinforced Rubber Covered Hydraulic Hose [PCD 13: Rubber
and Rubber Products]
4. SPECIFICATIONS
4.1
General :
Name of the Implement
Manufacturer
4.2
4.2.1
4.2.2
4.2.3
4.2.4
Applicant
Type of Implement
:
Make
:
Model
: NA
Serial No.
: NA
Year of manufacture
: 2015
Source of power Recommended :
CONTRUCTIONAL DETAILS (Refer Fig. 1):
Tractor Mounting Frame
Type
: Rigid type
Material
: MS
Constructional details
:
Boom
Constructional details
Material
Dimensions
Nos. & Sizes of pins
Stick
Constructional details
Material
Dimensions
Dipper
Constructional details
No. & size of pins
:
:
FMP/IT&TC/
Imp No: /2015
4.2.5
4.2.5
4.2.7
1.
Material
Dimensions
Dipper link
Constructional details
Material
Dimensions
Swing Post
Constructional details
Material
Dimensions
Bucket Link
Bucket
Capacity
Material
Dimensions
Constructional details
Bucket Pivot
Nos & Sie of pins of pins
Type of Lubrication
:
:
:
:
:
:
:
Two
Multipurpose Grease
Attachment Bracket
Material
Dimensions
Thickness
Number & size of holes for
attaching Bucket to the Stick
2.
Gusset
Material
Dimensions (mm)
3.
4.
Cutting Sidewall
Size (mm)
Thickness (mm)
5.
6.
FMP/IT&TC/
Imp No: /2015
Material
Dimensions
7.
8.
Not Provided
Shield
Tooth
Material
Dimensions
4.2.8
Stabilizer
Material
Dimensions
Constructional details
Height Adjustment
4.3
4.3.1
Hydraulic circuit
Boom cylinder
Nos. of cylinder
Lenght (mm)
Diameter (mm)
Boom cylinder base end
Nos & Size of pins (mm)
Type of Lubrication
Dipperstick cylinder
Nos. of cylinder
Lenght (mm)
Diameter (mm)
Dipperstick cylinder base end
Nos & Size of pins (mm)
Type of Lubrication
Bucket cylinder
Nos. of cylinder
Lenght (mm)
Diameter (mm)
Bucket cylinder base end
Nos & Size of pins (mm)
Type of Lubrication
Swing cylinder
Nos. of cylinder
Lenght (mm)
Diameter (mm)
Multipurpose Grease
Multipurpose Grease
:
:
One,
Multipurpose Grease
FMP/IT&TC/
Imp No: /2015
:
:
One,
Multipurpose Grease
:
:
One,
Multipurpose Grease
4.4
FMP/IT&TC/
Imp No: /2015
Degrees) (C)
Reach from Center of Swing
Pivot (D)
Transport Height (Maximum)
(E)
Bucket Rotation (F)
Loading Reach (Bucket at 60
Degrees) (G)
Transport Overhang (H)
Undercut (I)
Back Hoe
Volumetric Rating of Backhoe Bucket
X Dimension (mm)
Y Dimension (mm)
X/Y
Surface area S1(m2)
Surface area S2(m2)
Backsheet Width,L1 (mm)
Inside Width of Blade, L2 (mm)
Thickness of Side Plate, E (mm)
W1 Dimension (mm)
W2 Dimension (mm)
W4 Dimension (mm)
:
:
:
:
:
0.13
0.22
:
:
:
FMP/IT&TC/
Imp No: /2015
:
:
:
:
R (mm)
Name Of Component
Attachment Bracket
Foot Pins
Gusset
Back sheet Or Beam
Side Height Extension
Holes
Side Cutter
Cutting Sidewall
Cutting Edge Or Face
Bottom Plate Or Bottom Sheet
Removable Tooth
Leading Edge
Shield
Tooth Adaptor
FMP/IT&TC/
Imp No: /2015
FMP/IT&TC/
Imp No: /2015
FMP/IT&TC/
Imp No: /2015
10
DOZER
4.2.1
4.2.2
4.2.1
:
:
:
Lifting Arm
Constructional details
Material
Dimensions
Nos. & Sizes of pins
Main Frame:
Type
Material
Constructional details
:
:
:
Rigid type
MS
Rigid type
MS
Made by welding four channels of size
926 x 75 x 40 x 3, two on either side.
Hitching arrangement is welded on
4.4
main frame.
926 x 900
(mm)
Mouldboard frame
Type
Material
Dimention (mm)
Method of fixing
:
:
:
:
Rigid
MS
1994 x 120 x 65 x 5
Frame is welded to the main frame and
mouldboard is welded on Mouldboard
frame.
4.5
4.4.3
4.4.4
Side plate:
Material
Dimensions
Mouldboard
Material
Type
Dimention (mm)
Concavity
Blade:
Material
Dimensions
:
:
MS
415 x 260 x 10
:
:
:
:
MS
Curved
1994 x 480 x 5 mm thick
85
:
:
Carbon steel
1994 x 100 x 12
FMP/IT&TC/
Imp No: /2015
4.3
4.3.1
Hydraulic circuit
Lift Arm Cylinder
Nos. of cylinder
Lenght (mm)
Diameter (mm)
Lift Arm cylinder base end
Nos & Size of pins (mm)
Type of Lubrication
Hydraulic controls Levers
Multipurpose Grease
:
:
:
11
FMP/IT&TC/
Imp No: /2015
12
FMP/IT&TC/
Imp No: /2015
4.4.3
4.4.4
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
13
FMP/IT&TC/
Imp No: /2015
4.4.5
4.3
Hitch pyramid
Type
Overall Dimensions :
Transport Length (mm)
Transport Height (mm)
Ground Clearance main frame
:
:
:
14
(mm)
Ground Clearance Front Axle
4.4
(mm)
Overall Width (mm)
Wheel Base (mm)
Operational Mass (kg)
Weight of backhoe (kg)
Weight of back hoe bucket (11)
(kg)
Weight of back hoe bucket (18)
(kg)
Weight of Dozer (kg)
Weight of Dozer Blade (kg)
Total weight of Dozer, Backhoe
4.5
Red
6.1.2
Requirements as per IS
IS 7651 : 1997
Observatio
Conformity
to IS
REQUIREMENTS
Materials
Lining
The lining shall consist of synthetic rubber
compound resistant to oil, grease, glycol, etc.
Reinforcement
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
FMP/IT&TC/
Imp No: /2015
steel wire.
Cover
The cover shall consist of a suitable rubber
6.2
6.2.1
6.2.2
to the wire.
Type 2
The hose shall consist of a seamless inner
tube of oil resistant synthetic rubber, two
braids of wire reinforcement and an oil and
weather resistant synthetic rubber cover
6.2.3
Type 3
The hose shall consist of a seamless inner
tube of oil resistant synthetic rubber and two
textile braids separated by a high tensile steel
wire braid. All braids are to be impregnated
with an oil and mildew resistant synthetic
rubber compound. Alternately, in addition
to inner tube the hose can have one textile
braid, one reinforcing braid of high tensile
steel wire and an outer of oil and weather
6.2.4
15
FMP/IT&TC/
Imp No: /2015
0.6
10.3
Over 6.3 to
6.3
1.0
-22.0
Over 10.3
0.8
Over 22.0
1.3
-The bore shall meet the requirement of Table
6.4
6.4.1
1.
Tolerance on Length
The hose shall be supplied in lengths as
specified by the purchaser, subject to a
tolerance on specified lengths of l percent
6.4.2
6.5
6.6.
than 65
than 35
than 10
the hose
16
FMP/IT&TC/
Imp No: /2015
6.7
6.7.1
6.7.2
6.8
2 percent to - 4 percent.
Hose or hose assembly or both shall be
subjected to a temperature of - 40C for 24 h.
After this time and still still at - 4OC, the
sample shall be flexed for 8 to 12 s over a
mandrel having a diameter equal to twice the
minimum bend radius specified in Table 3.
Hose up to and including 22 mm in diameter
shall be bent through 180 over the mandrel
and hose larger than 22 mm diameter shall
be bent through 90 over the mandrel. After
flexing, the sample shall be allowed to warm
to room temperature and shall be visually
examined for cover cracks and subjected to a
proof test as described in 6.6. There shall be
6.9
6.10
17
shall
be
conducted
on
or
a
FMP/IT&TC/
Imp No: /2015
s,
following
pressure
release,
the
+2 percent to - 4 percent.
OPTIONAL REQUIREMENTS
Impulse Test
Four unaged samples of hose with end
fittings shall be tested. The free length of
hose under test shall be computed using the
following:
90
degree
bend
Free
length
18
FMP/IT&TC/
Imp No: /2015
7.1.2
a.
Fig. 1.
Means should be available for applying a
pulsating pressure internally to a hose
assembly at a rate of between 30 to 75 cycles
b.
per minute.
The internal pulsating pressure curve must
fall entirely within the shaded area of Fig. 2
and should conform as closely as possible to
the curve as shown. The rate of pressure rise
during the first part of the pressure impulse
cycle shall be between 3 500 and 7 500 bar/
set ( 350 and 750 Mpa/sec ) determined as
C.
illustrated in Fig. 3.
The test fluid to be used in the test shall be
fully fortified mineral oil having the
7.1.3
19
FMP/IT&TC/
Imp No: /2015
8
8.1
8.2
8.2.1
20
4.2
4.2.1
Access
Adequate access systems shall be provided
Satisfactory
Conform
Satisfactory
Conforms
Guarded
Conforms
6.3
FMP/IT&TC/
Imp No: /2015
21
ISO 10261.
BIS Certification Marking
Each length of hose may also be marked
with Standard Mark.
Sr. No.
3
3.1
4
4.1
Requirements as per IS
IS 7353: 1974
Material
Frame
Strut Hitch
Hitch Pin
Pitch Adjusting
MS.
MS
Carbon steel
Carbon steel
Screw
Mouldboard Frame
MS
Side plate
MS
Mouldboard
MS
Scarifier
Carbon steel
SIZE
The size of the terrace shall be determined
Observatio
Conformity
to IS
MS.
MS
Carbon steel
Conforms
Conforms
Conforms
NA
NA
MS
MS
MS
Carbon steel
Conforms
Conforms
Conforms
Conforms
1.99
Conforms
Satisfactory
Conforms
Ref. 4.4.6
Does not
to 3.5 m
OTHER REQUIREMENTS
Frame: The frame shall be capable of
sustaining a pull of 9.8 N per mm of blade
width without permanent deflection or
change in shape. The point of application og
pull shall be at mid-point of cutting blade.
5.3
conform
FMP/IT&TC/
Imp No: /2015
5.4
22
Satisfactory
Conforms
quality
For extra fine levelling, provision may be
Not
Does not
provided
conform
350
Conforms
tolerance of 20 mm
WORKMANSHIP AND FINISH:
All components of the terrace shall be free
Satisfactory
Conforms
Satisfactory
Conforms
Painted
Conforms
Marked
Conforms
Not marked
Does not
Not marked
conform
Does not
1974
The blade of mouldboard should have a
contour such that it allows the free rolling of
earth. The curvature of mouldboard with
blade shall be 300 or 375 mm with a
6
6.1
6.2
6.3
7.1
if any
b) Size; and
c) Batch or code number
7.1.1
These
particulars
shall
be
stamped,
Metallic
conforms
Conforms
plate
terracer.
The terracer may also be marked with the ISI
Not marked
Does not
FMP/IT&TC/
Imp No: /2015
7.2
8
8.1
23
certification Mark
Packing:- The terracer should be packed to
Not
conform
Does not
provided
conform
Does not
conform
provided
OPERATED TERRACER
38 to 45 HRC or 353 to 421 HB or 373 to
45-50
Conforms
revision ) 1.
The blade shall be bevelled. The length of
10 mm, 2.2
Conforms
mm
Reversible
Conforms
Rounded
Conforms
5.4
slightly rounded.
The holes of the blade shall be provided with
Counter
Conforms
sunk
Satisfactory
Conforms
FMP/IT&TC/
Imp No: /2015
24
Satisfactory
Conforms
Does not
Not marked
conform
following
particulars:
a) Manufacturers name or recognized trademark;
b) Batch or code number; and
5.8
Not
Conforms
5.9
provided
Not
Conforms
provided
IS : 10239 - 1982
3
3.1
4
Material
Carbon steel having minimum carbon
content of 0.65 percent shall be used.
Hardness
The hardness of blade shall be between 500
to 600 HB up to 50 mm from front of cutting
5
5.1
edge.
Dimensions
The length of the blade ( see L in Fig. 1 )
shall be as specified by the purchaser.
Length of the blade shall be made up of one
5.2
FMP/IT&TC/
Imp No: /2015
6.2
6.3
7
7.1
defects.
A protective coating shall be provided.
MARKING AND PACKING
Marking - Each blade shall be suitably
marked with the following:
a) Manufacturers name and registered trade
mark, if any;
b) Batch or code number; and
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
25
FMP/IT&TC/
Imp No: /2015
7.1.1
c) Length.
Each blade may also be marked with the IS1
7.2
Certification Mark.
Packing - The blades shall be packed, as
26
6. LABORATORY TEST
6.1
6.1.1
Hardness :
Hardness of Shaft Pin:
The hardness of the Shaft Pin was measured by Rockwells Hardness test using
hardness testing machine. The observations observed during test are given in following
table.
Hardness
Sr.
No
38- 45 HRC
Remarks
As observed
(HRC)
45
50
52
49
50
Conforms
6.1.1
Sr.
No
38- 45 HRC
Remarks
As observed
(HRC)
39
Conforms
42
FMP/IT&TC/
Imp No: /2015
38
40
43
27
6.1.1
Sr.
No
38- 45 HRC
Remarks
As observed
(HRC)
45
50
52
49
50
Conforms
Sr.
No
38- 45 HRC
Remarks
As observed
(HRC)
45
50
52
49
50
Conforms
Operation
Time in secs
FMP/IT&TC/
Imp No: /2015
1
2
3
4
5
6
7
8
9
10
11
12
28
Full speed
Stabilizer - Up R.H
Stabilizer - Down R.H.
Stabilizer - Up L.H
Stabilizer - Down R.H
Dipper Stick - In
Dipper Stick - Out
Swing - Left
Swing - Right
Bucket - Open
Bucket - Closed
Boom - Up
Boom - Down
Operation
Time in secs
Lift Arm Up
Lift Arm Down
Transport Position
Site of field
Type of soil
Topography of the field
Soil moisture percentage
Bulk density of the soil
:
:
:
:
:
1. Backhoe Attachment
Backhoe was operated for 40 hours in black cotton soil at Essey Farm,
Nasik.
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
FMP/IT&TC/
Imp No: /2015
29
During the field test, data were collected and analysed for quality of work,
rate of work and draft of implement. The details of test result are given as follow:
7.1 Field Conditions:
2.
3.
4.
5.
6.
7.2
Site of field
Type of soil
Topography of the field
Soil moisture percentage
Bulk density of the soil
:
:
:
:
:
Sr.
No
.
Parameter
Observed value
Tractor Used
1
2
3
4
5
6
7
8
9
10
11
Gear Used
Average width (cm)
Average time of cycle (sec)
Total Number of Cycle per hr
Average Mass of soil Per Cycle (kg)
Total Mass of soil handled per hour
(tonne)
Average Depth of pit (m)
Width of pit (mm)
Time required for pit (min)
Mahindra
Ultra-L 605 DI
(60 HP)
L2
18
12-25
170-173
165-175
116.47-119.11
Mahindra
555 D
(55 HP)
L2
11
15-25
175-178
100-110
87.5-97.9
2.5-2.7
620-650
14.45-15.25
2.4-2.8
530-535
12.20-12.32
3.2-3.4
2.7-3
Fuel consumption
l/h
7.2.1
Rate of work:
The rate of work was observed as to 116.47-119.11 and 87.5-97.9 tons/hr
sec.
The Soil carrying efficiency of the implement was worked out as 82-85 %.
7.2.2
7.2.3
Quality of work:
Labour requiremtnt:
FMP/IT&TC/
Imp No: /2015
30
One skilled operator is needed to operate the tractor and the attachment
simultaneously.
7.2.5
After Operation
% of wear after
40 hrs.
% wear per
hour
1
2
3
4
5
Remark : Heavy wear ranges between 0.24%
1. Dozer
Parameters observed during field test:
Sr.
No
.
1
2
3
4
5
6
7
8
9
7.2.1
Parameter
Observed
value
3.8-4.3
194-195
0.737-0.839
0.605-0.713
82-85
1.40-1.65
Good
8-9
2.8-3.2
4.68-4.8
Rate of work:
FMP/IT&TC/
Imp No: /2015
31
The rate of work was observed as 0.605-0.713 ha/h for the avarage speed of
1.65.
The field efficiecy of the implement was worked out as 82-85 %.
7.2.2
Quality of work:
The implement leaves the field level.
7.2.3
Labour requiremtnt:
One skilled operator is needed to operate the tractor and the implement
simultaneoulsy.
7.2.5
Ripper
point
Before
operation
After Operation
% of wear after
40 hrs.
% wear per
hour
14650
13243.60
9.6
0.24
7.2.5
Width Before
operation
Width After
Operation
% of wear after
40 hrs.
% wear per
hour
100
95.60
4.4
0.11
FMP/IT&TC/
Imp No: /2015
32
8. APPLICANTS COMMENTS
No comments were received from the applicant
FMP/IT&TC/
Imp No: /2015
33
Test Engineer
1.
2.
3.
Director of Research,
V.N.M.K.V Parbhani
Time
Weight
required of soil
(sec.)
Cycle
Time
Weight
required of soil
Cycle
Time
Weight
required of soil
(kg)
(sec.)
(kg)
(sec.)
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
(kg)
FMP/IT&TC/
Imp No: /2015
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
40
34
FMP/IT&TC/
Imp No: /2015
Performance Data
Name of Attachment: Back Hoe
Type of Soil:
Sr.
Parameter
Tractor Used
Bulk Density:
Test 1
Date:
Test 2
Test 3
Test 4
Test 5
No
.
1
2
3
4
5
6
7
8
9
Width of Operation
Size of Pit
Depth of Pit
Time required
Total Number of cycles
Avg. Type for Cycle
Total Mass of soil Handled
Fuel Consumption
Labour Requirements
Performance Data
Name of Attachment : Loader
Tractor Used
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
Date:
FMP/IT&TC/
Imp No: /2015
Type of Soil:
Sr.
Bulk Density:
Parameter
Test 1
Test 2
Test 3
Test 4
Test 5
No
.
1
5
6
7
8
9
Width of Operation
Total Number of cycles
Avg. Type for Cycle
Total Mass of soil Handled
Fuel Consumption
Labour Requirements
Performance Data
Name of Attachment: Dozer
Tractor Used
IMPLEMENT TESTING & TRAINING CENTRE, CAET,
Vasantrao Naik Marathwada Krishi Vidyapeeth, Parbhani (M.S.)
Date:
FMP/IT&TC/
Imp No: /2015
Type of Soil:
Sr.
Parameter
Test 1
Test 2
Test 3
No
.
1
Test 4
Test 5
FMP/IT&TC/
Imp No: /2015