In Service Thermal Power Stations

Station

Location

Kot Addu Power Company Limited

Kot Addu, Punjab

Hub Power Company Plant

Hub, Balochistan

Bin Qasim Power Plant I

Karachi, Sindh

Bin Qasim Power Plant II

Karachi, Sindh

Guddu Thermal Station

Guddu, Kashmore,Sind

Jamshoro Power Station

Jamshoro District,Sindh

Uch Power Plant

Nasirabad District,Balochistan

Rousch (Pakistan) Power Plant

Kabirwala, Punjab

Nandipur Power Project

Gujranwala, Punjab

Pak Gen. (Pvt) Limited Thermal Station

Muzaffargarh, Punjab

Lalpir Limited

Muzaffargarh, Punjab

Altern Energy Limited

Fateh Jang, Punjab

Atlas Power Limited

Sheikhupura, Punjab

Attock Gen Limited

Rawalpindi, Punjab

Engro Energy Limited

Ghotki, Sindh

Fauji Kabirwala Power Company

Kabirwala, Punjab

Liberty Power Project

Daharki, Sindh

Foundation Power Company (Daharki) Limited

Daharki, Sindh

Gul Ahmed

Karachi, Sindh

Halmore Power Generation Company Limited

Sheikhupura, Punjab

Hub Power Project-Narowal

Narowal, Punjab

Liberty Power Tech

Faisalabad, Punjab

Nishat Power Limited

Lahore, Punjab

Nishat Chunian Limited

Lahore, Punjab

Orient Power Company Limited

Kasur District, Punjab

Saif Power Limited


Saba Power Company Limited

Sahiwal, Punjab
Muridke, Sheikhupura
District, Punjab
Farooqabad,Sheikhupura, Punj
ab

Southern Electric Power Company Limited

Raiwind, Lahore

Tapal Energy Limited

Karachi, Sindh

Habibullah Coastal Power (Pvt) Company

Quetta, Balochistan

Japan Power Generation (Pvt) Limited

Raiwind, Punjab

Sapphire Electric Company Limited

Kohinoor Energy Limited

Lahore, Punjab

Sitara Energy Limited

Jaranwala, Faisalabad,Punjab
Total Capacity

Under Construction or Proposed


Station

Location

Uch-II Power Plant

Nasirabad District, Dera Murad


Jamali,Balochistan

Grange Holding Group Power Plant

Arifwala, Punjab

Star Power Project

Daharki, Ghotki District, Sindh

KE Coal Power Plant

Karachi, Sindh

Sindh Engro Thar Coal Power Project

Tharparkar,Sindh

Kandra Power Project

Sukkur, Sindh

Gadani Energy Park

Gadani,Balochistan

Gadani Coal Power Plant

Gadani,Balochistan

Coal Power Project

Port Qasim,Karachi, Sindh

Thar Coal Power Plant

Tharparkar,Sindh

Total Capacity

Power Stations
Capacity (

Notes

1,638 Oil and Natural Gas fired thermal stations


1,292 Oil-fired thermal station
1,260 Oil- and Natural Gas-fired PP
560 Natural Gas-fired Combine Cycle PP
1,049 Natural Gas-fired thermal station
1,054 Oil- and Natural Gas-fired PP
596 Natural Gas-fired thermal
450 Natural Gas-fired thermal
525 Gas fired Plant
365 Oil-fired thermal
362 Oil-fired thermal
29 Gas-fired Diesel Engine
225 Furnace Oil Fired Plant
165 Furnace Oil Fired Plant
227 Combined Cycle Power plant
157 Combined[2]
235 Natural Gas-fired thermal
185 Combined Cycle Power Plant
136 Furnace Oil
225 Gas Fired Combined Cycle
220 Furnace Oil Fired Plant
200 Furnace Oil Combined Cycle
200 Furnace Oil Fired Plant
200 Furnace Oil Fired Plant
229 Gas Fired, Combined Cycle
229 Gas, Combined Cycle
225 Furnace Oil Fired Plant
125 Furnace Oil Fired Unit
136 Furnace Oil Fired Thermal Plant
126 Furnace Oil Fired Thermal Plant
140 Natural Gas Fired Plant
135 Furnace Oil Fired Plant

131 Furnace Oil Fired Plant


85 Diesel and Natural Gas Fired Plant
13,116 MW

n or Proposed
Capacity (

Status
Under construction,[5] Gas-Thermal Power
404 Generation,[6] to be operational by December 2014.

152 Under construction, furnace oil combine cycle power plant, to be operational by October 20

134 Under construction, UAEs Al-Ghurair Group is setting up 134MW Gas-Thermal power projec
660 Under construction[9]
1200 Under construction[10]
120 Proposed, LOI issued.[11]

issued China
a Letter will
of Intent
to the
Proposed,
install
10Joint
coalVenture
powerof plants of 660MW each that will cost $14 billion.[1
6600 PPIB
M/s Al Mirqab Capital of Qatar and Sinohydro
Ciner
Group
of development
Turkey hasofagreed to immediately start work on a 660 MW power
Resources Ltd
of China
for the
660 Proposed,
2x660MW power coal-fired project at Port Qasim,
1320 Karachi.[14]
660 Proposed

11910 MW

operational by October 2014.[7]

Gas-Thermal power project, to be completed by July 2016 and expected to cost $100 million.[8]

hat will cost $14 billion.[12]

work on a 660 MW power plant at Gaddani.[13]

In service
Station

Tarbela Dam
Ghazi-Barotha Hydropower Project
Mangla Dam
Warsak Dam
Chashma Barrage
Allai Khwar Hydropower Project
New Bong Escape
Khan Khwar Hydropower Project
Duber Khwar hydropower project
Jinnah hydropower project
Gomal Zam Dam
NeelumJhelum Hydropower Plant
Satpara Dam
Rasul Barrage Hydropower Project
Jabban (Malakand-I) Dam
Dargai (Malakand-II) Dam
Malakand-III Hydropower Project
Shadiwal Dam
Chichoki Malian Hydel Dam
Nandipur Dam
Naltar-I, Nalter-II Dams
Naltar-IV Dam
Kuram Garhi Dam
Renala Khurd HPP
Darawat Dam
Golen Gol project
Patrind Dam
Machai Dam
PAEC Chashma Hydel Dam
Kathai Dam
Kundal Shahi Dam

Leepa Dam
Jari Dam

Jagran-I Dam
Chitral Dam
Singul Dam
Pion Dam
Sermik Dam
Basho-I Dam
Tormik-I Dam
Haramosh Dam
Bubind Dam
Gilgit Dam
Skardu-I Dam
Skardu-II, III Dams
Chilas-I Dam
Hunza Dam
Shyok Dam
Astore Dam
Kachura-II Dam
Ghizar Dam
Thak Dam
Phandar Dam
Bordas Dam
Kharmang Dam
Yasin Dam
Bunnar Chilas Dam
Roundu Dam
Kar Gah-I, II, III, IV, V, VI, VII Dams
Hisper-I Dam
Naz Bar Dam
Jaglot-I, II Dams
Chalt Dam
Khyber-I, II Dams
Shigar Dam
Shirting Dam
Sher Qila Dam
Parishing/Louse
Darel-I,II Dams

Bunner Dam
Tangir Dam
Boladas-I Dam
Khunjerab Dam
Gol Dam
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Da
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, KachuraKhaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Me
Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahm
Jalalabad Dam
Hasanabad-I, II, III, IV, V Dams
Dumsum Dam
Balagond Dam
Ishkuman-I, II Dams
Reshun
Ashuran Dam
Thall Dam
Shishi, Karora, Kalam, Keyal, Kaghan, Duber, Jalkot

Under Construction or Proposed


Station

NeelumJhelum Hydropower Plant


Golen Gol hydropower project
Patrind Dam
Diamer-Bhasha Dam
Keyal Khwar
Nal Gaj Dam
Naltar-5
Naltar-3
Dasu Hydropower Project
Shagarthang Hydropower Project
Taunsa Barrage Hydropower Plant
Naulong Dam
Suki Kinari Hydropower Project

Kurram Tangi Dam


Bara Dam
Kohala Hydropower Project
Kalabagh Dam
Kotli Hydropower Project
Bunji Hydropower Project
Phandar Hydropower Project
Basho Hydropower Station
Lawi Hydropower Project
Harpo Hydropower Project
Munda Dam
Akhori Dam
Skardu-Katzarah Dam
Lower Spat Gah hydropower project
Middle Palas hydropower project
Upper Palas hydropower project
Thakot Hydropower Project
Pattan hydropower Project
Tank Zam Dam
Athmuqam Dam
Rajhdani Dam
Nekherdim-Paur Dam
Turtonus-Uzghor Dam
Mahl Hydropower Project
Thack HPP
Bhadi Dhoba HPP
Galeter HPP
Saridoa Cross HPP
Chamfall HPP
Guddu Hydropower Station
Karot Hydropower Project
Azad Pattan Hydropower Project
Harighel Hydropower Project
Sehra Hydropower Project
Chakothi-Hattian HPP
Jagran-II

Sharmai Hydropower Project


Madian Hydropower Project
Asrit-Kedam HPP
Kalam Asrit
Gabral Kalam
Karang Hydropower Project
Kaigah Hydropower Project
Shogo-Sin Hydel Dam
Shushgai Zhendoll
Yogo, Pakistan
Thor Hydropower Project
Yulbo Hydropower Project
Shyok Hydropower Project
Tungus Hydropower Project
Skardu Dam
Dudhnial Hydropower Project
Kundal Shahi Hydropower Project
Trappi Hydropower Project
Tangir Hydropower Project
Matiltan Hydropower Project
Gulpur Hydropower Project
Winder Dam
Hingol Dam
Garuk Dam
Pelar Dam
Daraban Zam Dam
Ghabir Dam
Papin Dam

In service
Community

Capacity (MW)

Tarbela,Haripur District,Khyber Pakhtunkhwa,Indus River

3,478

Attock, Punjab,Indus River

1,450

Mirpur, Azad Kashmir,Jehlum River

1,120

Peshawar,Kabul River,KPK

243

Chashma, Indus River, Punjab

184

Mansehra,KPK, Indus River

121

Mirpur, Azad Kashmir,Jehlum River

84

Kohistan Disttrict, KPK,Indus River

72

Kohistan District, KPK,Indus River

130

Jinnah Barrage,Punjab, Indus River

96

South Waziristan,FATA, Gomal River

17.4

Muzaffarabad,Azad Kashmir,Jhelum River

969

Skardu,Satpara River

17.3

Mandi Bahauddin,Jehlum River,Punjab

22

Malakand District, Swat River

22

Malakand District,Dargai,Swat River

20

Malakand District, Swat River

81

Gujrat District,Punjab

13.5

Sheikhupura,Upper Jhelum Canal

13.2

Gujranwala,Upper Jhelum Canal

13.8

Gilgit, Naltar River

2.28

Gilgit, Naltar River

18

Kurram Garhi,KPK, Kuchkot Canal


Renala Khurd,Okara District, Lower BariDoab Canal

4
1.1

Jamshoro District, Sindh, Nai Baran River

0.45

Chitral, Mastuj River

106

Muzaffarabad,AJK, Kunhar River

150

Mardan District,KPK, Machai Canal

Chashma,Mianwali District, Punjab

1.2

Muzaffarabad,AJK, Kathai Nullah

3.2

Neelam Valley,GB

Leepa Valley,Muzaffarabad,AJK

Mirpur, Azad Kashmir

Neelum Valley,AJK, Jagran River

Chitral
Gilgit

30.4
1
1.2

Gah

Skardu

Skardu

Roundu Valley,GB

Gilgit

Astore
Gilgit

0.64
10.63

Skardu

6.96

Skardu

1.64

Chilas

5.62

Hunza Valley,GB

5.13

Shyok Valley,GB

4.85

Astore

3.11

Skardu

Ghizer District,GB

Chilas

Ghizer District,GB

Ghanche

Kharmang Valley, GB

1.89

Ghizer District,GB

1.61

Diamer District,GB

1.5

Roundu Valley,GB

1.52

Gilgit

13.34

Hunza Valley

Yasin Valley

Jaglot

1.32

Nagar Valley

Gilgit

Skardu

Skardu

Gilgit
Astore
Ghanche

1.11
1
1.2

Chilas

Chilas

Hunza Valley,GB

0.64

Gujrab River

0.59

Skardu

0.4

Various Locations inGB

Various Locations inGB

1.5

Various Locations inGB

1.85

Various Locations inGB

1.5

GB

Gilgit

Hunza Valley

Gah

1.5

Gah

1.5

Ishkuman

2.38

Chitral

4.5
0.4
0.4

Various Locations inKhyber Pakhtunkhwa

2.1

Total Capacity

8,603

Under Construction or Proposed


Community

Capacity (MW)

Muzaffarabad,Azad Kashmir,Neelum River

969

Chitral, KPK,Mastuj River

106

Muzaffarabad,Azad Kashmir,Kunhar River

148

Chilas, Indus River

4,500

Kohistan District, KPK,Indus River

128

Dadu District, Gaj River,Sindh

4.2

Gilgit, Naltar River

14.4

Gilgit, Naltar River

16

Kohistan District, KPK,Dassu, Indus River


Skardu,Baltistan, Indus River

4,320
26

Taunsa,Muzaffargarh District, Punjab,Indus River

120

Jhal Magsi District, Mula River,Balochistan

4.4

Kaghan Valley,Mansehra District, KPK,Kunhar River

840

North Waziristan,FATA, Kurram River

83.4

Tirah, Khyber Agency, FATA,Bara River

5.8

Muzaffarabad District, Azad Kashmir,Jhehlum River

1100

Kalabagh,Punjab, Indus River

3600

Kotli District,Poonch River,AJK

100

Astore District,Gilgit-Baltistan

7,100[56]

Ghizer District,Gilgit-Baltistan

81

Skardu, GB,Indus River

28

Chitral, Shishi River

69

Skardu, Indus River

34.5

Mohmand Agency, FATA,Swat River

740

Akhori, Punjab,Haro River

600

Katzarah,Gilgit-Baltistan

15,000

Kohistan District, KPK,Indus River

665

Kohistan, KPK

373

Kohistan, KPK

160

Battagram District, KPK

2,800

Patan Village,Indus River

2,800

Hinis Tangi,KPK, Tank Zam River

25.5

Athmuqam,Azad Kashmir,Neelum River

350

Kotli District,AJK Poonch River

132

Chitral, KPK

80

Chitral, KPK

58

Azad Kashmir,Jehlum River

590

Chilas

Haveli District

Kotli District

Bhimber District

1.7

Hattian District

6.4

Kashmore,Sindh

33

Kotli, Jehlum River

640

Azad Pattan,Sudhnoti,Jehlum River,Azad Kashmir

650
53

Azad Kashmir,Poonch River

130

Muzaffarabad,AJK,

500

Neelum, AJK,Jagran River

48

115
Swat, KPK,Swat River

157

Kalam, KPK,Swat River

215
197
101
458

Kaigah, KPK,Indus River

548
132
144
500
3.6
3000
520
2200

Skardu

1600
960
960
32
15
84

Azad Kashmir,Poonch River

100

Lasbela District, Winder River,Balochistan

0.3

Lasbela District, Hingol River,Balochistan

3.5

Kharan District,Garuk River,Balochistan

0.3

Awaran District,Pelar River,Balochistan

0.3

Dera Ismail Khan, KPK, Khora River

0.75

Ghabir River

0.15

Rawalpindi District, Wadala Kas


Total Capacity

0.2

54786.4

Operational since 1974,


1410MW Tarbela-IV
Extension is underway to
be completed in 42 months
and increase the capacity
to 4888MW. Feasibility
study of Tarbela-V
Extension is ongoing that
would generate additional
1,320 MW Status
electricity and
increase the capacity to
6,208
MW. since 1977,
Operational
Dam
completedsince
in 1967,
Operational
2002;Run-of-the-river
plan to increase generation
by 350 MW

Operational since 1960. Dam completely silted up; Power generation byRun of the river. Extension is
Operational since 1971

Operational since 2013[22]


Operational since March 2013. Privately owned hydropower plant.[23]
Operational since April 2012[24]
Operational since 2013[25]
[26][27]
Operational
since 2013
Under construction,
63%
work
completedsince
as of Dec
Operational
August 2013[28]
2013.[29] To be completed by
2015.[26][30]
Operational since Nov
Operational
since 1952,
[31][32][33][34]
2012;
upgradation to 35MW is
planned.
Operational since 1935.
[35]
Rehabilitated recently.[31]

Operational since 1953[35]


Operational since June 2008.[35]
Operational since 1961,[36]
Operational since 1959.[35]
Operational since 1963.[35]
Operational.[35][37]
Operational since October
2007.[35][37]

Operational since 1958[35]


Operational since 1925, Pakistan's (Indian Subcontinent) first hydropower project.[35]
To
be completed
the[38][39]
end
Operational
sinceby
2014
of 2015.[26][26][40][41] cost
estimate $130 million [39]

Privately owned hydropower plant. Under construction, expected to be completed in 2016;[23]


Operational.[35]
Operational since 2000.[35]
Operational.[35]
Operational since 1992

Operational.[35]
Operational.[35]

Operational since 2000[35][42]

Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]
Operational[35]

Operational since 1991[35][42]

Under
construction. 17,000
MW
Under
Construction.
Cost
acres of
land has been
estimate
million. EIB
acquired 240
by WAPDA.
and
KfW signed
Preliminary
work loan
i.e.
agreements
construction to
of provide
Wapda
100
million
and 97 million
offices,
residential
Status facilities,
Under
construction.
To
respectively
for
the project.
Under
Construction.
Tobe
be
roads
and
other
Under
construction.
To
be
completed
in
2016;
Expected
to
be
completed
completed
by
the
end
of
infrastructure
Thor and
completed
by at
2015.
Privately
owned
[26][26][40][41]
by
October
2016
and
2015.
cost
Shatial
bypass
underway.
[23]
hydropower
plant.
Project
[39]
contract
for
civil
work
has
estimate
$130
million
[43]
Estimated
to cost
around
is
being
financed
by
IFC,
already
been
awarded.
$14
billion
andBank.
be [14] The
ADB,
K-Exim
preliminary
works
completed
in abouti.e.
12
Under
Construction,
construction
of offices,
years
i.e.
2025
Progress
23%
untilare
Dec
colony and
roads
[48]
Under
construction.
2013.
Estimated
to [44][45]
cost
already
in
progress
[49]
Feasibility
study
and
$332
million and
completed
[39][46]
detailed
engineering
by June 2015
Under
designsconstruction,
of the $7.5 billion
Under
Construction,
estimated
to been
cost up to expected to cost PKR 3.84 billion and would be completed in 2016 with Chinese c
project have
Rs4,843.726
million.
80%
completed.
WB
will be
theexpected to cost Rs1,372 million.[37]
Under
Construction,
of
the
cost
is
being
Under
construction.
major source
of finance for
provided
bystudy
ADBand
and EIB,
[50]
Feasibility
the project.
scheduled
to
be
completed
detailed engineering
design
[51][52]
by
March
2018.
of the
Project
completed in
2009.[46] construction,
The $377 million[31]
Under
to cost Rs26 billion, to be completed in four years.[53]
Ready
to is
bescheduled to expected
[39]
project
be
constructed,
completed byRun-of-theJune 2015.
river project. Feasibility
studies completed.[54]

constructed, Run-of-theriver[39]PPIB has received


bids from foreign and local
investors for the project on
build, operate and transfer
(BOT)
These
Ready
to
be
constructed.
Readybasis.
constructed. Engineering study completed.USAIDallocated $81 million for phase-I of the
Ready
toto
bebe
constructed.
proposals
are
now
being
Feasibility
study
completed
Engineering
study
evaluated
by
committee
in 2008.[26][31][31][32][33]
completed
buta project
is
[14]
on
a fast at
track
basis
It
currently
pause
due
towill
Ready
to
be Constructed.
Feasibility and engineering studies completed. Cost estimate $2.155 billion
be
fourth
private
sector
lack of consensus between
hydropower
provinces. project in the
Detailed
engineering
country and
will cost $design
170
Run-of-the-riverFeasibility
[55]
or
tender
of
documents
million
to
construct.
Detailed
design
[26]
studies
inengineering
progress.,
cost
under
process
Proposed,
Detailed
engineering
design
or
tender
of documents
[39]
estimate
$6.8
billion
cost
estimate
$40
[26][33]
or
tender
of documents
under
process,
cost
Detailed
engineering
design
million
[23]AFD
of France
[26][31][32]
[23]
under
process,
estimate
$4.4
billion
or
tender
of
documents
willcost
be the
major
source of
[33]
estimate
$46
[26][31][32]
under
process,
funding
for
the
project.[57
[23]
million
The French
[33]
cost estimate
$120
Proposed,
decided
development
agency,
AFD
million [23] WAPDA
to
the50m
project
onfor
the
willshelve
provide
euros
Under
engineering
study,[26]
[58] a dozen
basis
of
over
the
project.
[31][32][33]
cost
estimate
$1.149
negative
impacts
which
it
[39]
billion
said made the multipurpose
damstudy
site
Feasibility
stage, cost estimate $1.6 billion[23]
unfeasible in the present
Feasibility
studies
[59]
circumstances.
completed,[31][32][33] cost
Feasibility
studies
ongoing,
[39]
estimate
$697
million
[31][32][33]
cost estimate $763
Feasibility
studies ongoing,
[39]
million
[31][32][33]
cost estimate $763
Feasibility
studies ongoing,
[39]
million
[31][32][33]
cost estimate $6
Feasibility
studies ongoing,
[23]
billion
Proposed,cost
Feasibility
[31][32][33][46]
estimate $6
studies
completed
in 1988,
[23]
billion
[31]
cost estimate $234
Proposed,
PPIB gave the
[39]
million
Proposed
Roller
green signal
for inviting
Proposed,
Run-of-theCompacted
Concrete
[60]
proposals
[39]
river
PPIB[61]cleared
the
(RCC)
dam,
EOI invited.
[60]
way for issuance of a letter
of interest to the consortium
Proposed,
EOI invited.[60]
of CWE Investment
Corporation
and
Proposed, China
EOI invited.[60]
Trans Tech of Pakistan for
the project.[60]
Proposed
Proposed

Proposed[62]
Proposed

Proposed[62]
Proposed

Proposed, China has shown its keen interest in the development of a project near Kotli.[14]
Proposed
Proposed
Proposed; Run-of-the-river;
Proposed
[63]
France has promised to
fund
part the construction.
Proposed
Construction expected to
start in 2015.[63]

Proposed

Under Feasibiliy studies.[64]


Proposed
Proposed
Proposed
Proposed

Feasibility Studies completed.[64]


Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed
Proposed, PPIB has issued
Proposed,
cost estimate
$30.967 million[39]
LOS for the project,
which
is
sponsored by Korea
Proposed[23]
South East Power
Company (KOSEP)[14][39]

Proposed, cost estimate $148 mill[39]

Proposed; Feasibility study, detailed engineering designs studies and tender document completed in 2
Proposed, cost estimate
$21 million [31][39]
Proposed, cost estimate
$20 million[39][65]

Proposed, cost estimate $69 million[39]


Proposed, cost estimate $121 million[39]
Proposed, cost estimate $101 million[39]
MW

the river. Extension is being planned.

ted in 2016;[23]

in 2016 with Chinese cooperation.[47]

million for phase-I of the project. Estimated cost is $260 million.

estimate $2.155 billion[23]

ear Kotli.[14]

ocument completed in 2009. Cost estimate $311 million[39]

In Service
Station

Community

Chashma Nuclear Power Complex 1 (CHASNUPP-Chashma,Mianwali District


Chashma Nuclear Power Complex 2 (CHASNUPP-Chashma,Mianwali District
Karachi Nuclear Power Plant

Karachi, Sindh

Khushab Nuclear Complex

Khushab,Punjab
Total Capacity

Under Construction or Proposed


Station

Community

Chashma Nuclear Power Complex 3 (CHASNUPP-Kundian,Mianwali District


Chashma Nuclear Power Complex 4 (CHASNUPP-Kundian,Mianwali District
Chashma Nuclear Power Complex 5 (CHASNUPP-Kundian,Mianwali District
Karachi Nuclear Power Plant-II (KANUPP-II)

Karachi

Karachi Nuclear Power Plant-III (KANUPP-III)

Karachi

Coastal Power Project

Hub, Balochistan
Total Capacity

ervice
Capacity (MW)
325
325
125
200

Status
Operational since June 2000

Operational
sinceatMarch
2011[66]
Partially Operational
100MWh
since 2002
upon exceeding its design life; To be
decommissioned in 2019
Operational since 1998.
975 MW

tion or Proposed
Capacity (MW)

340

Status
Under construction, to
be completed by 2017,
estimated cost of Chashnupp 3 and 4 is around
[68]
Under
construction,
will be completed
completed
$1.9 billion.
PAEC has recently
the by 2016.[67]
Dom Placement at Chashma-3 and Chashma4.[69]

1000

Proposed

1000

Proposed

340

1000
2200

Under
Construction since 26 November 2013,
Proposed
to be completed by 2020. Project to cost around
$10 billion.
5880 MW

Station

Community

Capacity (MW)

Jhimpir Wind Power Plant

Jhimpir, Sindh

56.4

FFC Wind Farm

Jhimpir, Sindh

50.4

Thatta Power Plant

Sindh

150

Solar Energy Pakistan Ltd

Thatta, Sindh

35

First Solar

Punjab

AM Pak Energy

Punjab

50

DACC LLC Solar

Sindh

50

Wah Industries Limited Solar

Taxila, Punjab

Tech Access Solar

Punjab

10

CWE Solar

Cholistan

50

Roshan Power Solar

Kasur

10

Bakhsh Energy Solar

Lodhran

20

Quaid-e-Azam Solar Park

Bahawalpur
1000
Total capcity 106.8

Status
Operational since 2009; Pakistan's firstwind power
station

Operational since Dec 2012[70]


Proposed solar power station[70]

LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued [71][72]

LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued[71]
LOI issued[71]
Planned[73]
MW

Power Generation
Thermal

13,116 MW

Hydro

8603 MW

Nuclear
Renewables
Total Generation

975 MW
106.8 MW
22,801 MW