Q1/2013
Q2/2013
Q3/2013
520
518
468 - 568
660
658
598 - 718
835
835
770 - 900
Terraced Houses
430
428
398 - 458
Specification
1. Average Standard Apartments to be 30-50 storey 60-90 m2 per flat.
2. Average Luxury Apartment to be 30-50 storey 100-150 m2 per flat.
3. Apartments & Houses include air conditioning, kitchen cabinets, kitchen cook top, exhausted hood but exclude loose furniture & home appliances.
OFFICE /COMMERCIAL
Q1/2013
Q2/2013
Q3/2013
950
950
834 1,068
775
775
714 - 834
Shopping Centers
710
710
654 - 768
Specification
1. Offices based on buildings 20-30 storeys high with floor plans minimum 1,000m2 per level.
2. Shopping centres and average standard offices exclude finishes, A/C ducting and light fittings to tenant areas, standard faade.
3. Prestige offices are fitted with raised floor, suspended ceiling, A/C ducting and light fittings to tenant areas, standard faade.
INDUSTRIAL
Q1/2013
Q2/2013
Q3/2013
300
300
225 370
430
430
375 480
425
425
370 - 480
425
425
370 - 475
Specification
1. Flatted factories and industrial office buildings exclude manufacturing equipment, special services provisions, air-conditioning and electrical
distribution system to tenant areas.
HOTEL
Q1/2013
Q2/2013
Q3/2013
Resort Hotel
1,275
1,273
1.125 1.415
1,480
1,474
1.345 - 1,600
1,845
1,843
1,725 1,955
Specification
1. F. F & E includes interior decoration and loose furniture etc. but excludes hotel operated equipment costs (e.g. cutlery, crockery, linen, uniform, etc.)
OTHER
Q1/2013
Q2/2013
Q3/2013
650
650
600 690
375
375
345 405
460
460
450 475
Student Hostels
535
535
475 600
755
755
715 - 795
Specification
1. Underground car park cost including temporary steel works and bottom-up
Note
1. The costs for the respective categories given above are averages based on fixed price competitive tenders. It must be understood that the actual
cost of a building will depend upon the design and many other factors and may vary from the figure shown.
2. The costs per square metre are based on Constructions Floor Areas measured to the outside face of the external walls/external perimeter including
lift shafts, stairwells, balconies, plant rooms, water tanks and the like.
3. All buildings are assumed to be built on flat ground, with normal soil and site condition. The cost excludes site formation works, external works, land
cost, professional fees, finance and legal expenses.
4. The standard for each category of building vary from country to country and do not necessarily follow those of Vietnam.