The Project
You are the consultant appointed for the project in Building Services
Perunding Asas Bina Sdn. Bhd. Your group was given the task to design
the air conditioning of the newly constructed office blocks as given in the
floor plans given by the architect for the client and the owner of the
building (PAMA Sdn. Bhd.).
1. The Task:
You are required to redraw the floor plan and the side views and the
building height for the air conditioning central plant requirement. You are
required to select a suitable location for the central plant ROOM ON THE
GROUND FLOOR and supply the chilled water system to the building. You
are required to supply 10 degrees chilled water using base chiller at day
time without storage tank. Your control room for the AHU is to be
installed at Central Plant Room. The AHU room is to be located at the
each floor indicated by possible plant room location.
2. You are required to calculate
1. The cooling load of the floor building. You may require locating a suitable
location and room size at the ends of the building for AHU room.
2. The building required to be cooled to 25 o C and 50 % RH, The ambient air in
the region of the building is about 35 oC on average with RH of 60%.
3. You are required to design the water cooled type with AHU units at the end
of the floor and the sizing of ducting for the air conditioning and the
required AHU coil sizing for each floor for the whole building. The building
required the system to be controlled at central plant room.
4. Give your report and recommendation and estimated ton refrigeration that
you recommended for the system. You are required to estimate the cost
based on tonnage of refrigeration designed. [Please survey the estimated
cost per ton refrigeration in the market in Malaysia to assist your decision.]
5. Give your proposal how many ton refrigeration chiller is required for this
building.
6. The details of the building brief are given in Appendices. You are required to
assume the standard walls specification and standard height of 3.5 m from
floor to floor.
7. You are given 4 weeks to complete the design.
8. A formal presentation to the client is required by the end of the designed
stage to the top management for project to be approved and budget
awarded (marks).
Note: The name given in the plan is not related to any identity of company in the
country and is only used for exercise purpose.
PLEASE PRODUCE YOUR REPORT IN THE APPROPRIATE PROPOSAL TO GET THE BEST
PRICE FOR YOUR WORK FOR THE AIR CONDITIONING FOR THE BUILDING.