LANCO AMARKANTAK POWER PVT. LTD.

PATHADI,KORBA,(CG)
2 x 300MW UNITS

Check List for SF6 BREAKER


Serial Number:-

Unique Reference:
Make-:Crompton Greaves Ltd.

R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Agency: Crompton Greaves Ltd.
Package;400KV Switch Yard
Technical specification of the breaker (Type: 400-SFM-40A)
Rated Voltage: 420KV
Normal rated current :2000Amps
Max. Breaking Capacity: 40kA rms
Closing and trip Coils Voltage: 220 V dc.
Rated pressure of SF6: 7KSC
Operating Rated Insulating Level: 1425 KV
Air Pressure: 15.5KSC
Rated Making Capacity:100KA

Rated Short time current rating: 40kA for 3 sec

Rated Power Frequency Withstand Voltage:


336/520 KV

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Signatures with Date

2
3
4
5
6
LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
1.1
1.2

1-List of Drawing and Documents


Description
Drawing No
10E03100
Key single line diagram
104E05221

400KV Switchyard earthing system layout


400KV Switchyard protection & metering SLD

1.3

10E03112

1.4

Block Logic Dia. For interlocking/control


philosophy( 1 OF 2 )

10E03151

1.5
1.6
1.7

400KV Switchyard GA & RCC details of


equipment foundation
Control cable Schedule-400KV Switchyard
O&M manual

00S08433
06056-E-SY-SY-CS-0002
Available

2-List of testing equipment and T&P


Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14

Testing equipments/T&P
Multi meter
Tong tester
1KV megger
5KV megger
Tan delta test set
Milliohm meter
CB operation analyzer
Dew point meter
SF6 Leak detector
SF6 filling station
Noise DB meter
Spanner Set
Screw driver set
Torch

Quantity Required
2
2
1
1
1
1
1
1
1
1
1
1
1
1

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
3-Physical checks and general Inspections
Sl.No. Description
Yes
No
Remarks
Check that erection work is complete as
3.1
per relevant drawings .
3.2 Check all the foundation bolt and tight.
3.3

Check for proper alignment of structures,


support insulators,corona rings etc.

3.4

Density monitor and pressure gauge are


placed properly below support insulators

3.5

Check that desiccant bags are removed


from inside the interrupter chamber
before installing.

3.6
3.7
3.8

Check that length of operating rod is


adjusted as per suppliers manual
Check dew points of SF6.
Ensure that vacuum pulling and SF6 gas
filling at specified pressure as per the
procedure given in supplier manual.

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Yes
3.9 Check the gas pr. 7Kgf at NTP
Check the Colour of Alumina : Alumina
3.10
is Blackish if Moist and White if Healthy.
Check for any leakage of SF6 gas from
3.11
joints using leak detector or soap solution

3.12

Check gas pressure daily for few


weeks(specially at highest and lowest
temp. of the day) to ensure that the
pressure is not reaching extreme
limits(falling below alarm value/ over
pressurized).

3.13

Check the earthing of support structure,


breaker frame and MOM boxes is done
properly.

3.14

Check the cable have been terminated in


MOM boxes of breakers as per the cable
schedule and equipment wiring diagram.

3.15

Check proper glanding of cable and


ensure plugging of un used cable entries
of MOM boxes,sealing and locking of
MOM boxes against water entry .

No

Remarks

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check rating of fuses as per scheme &
3.16
healthiness.
3.17

Check availability of AC/DC auxillary


supply to breaker

3.18

Check normal operation(spring charging


mechanism checks).

3.19
3.20
3.21
3.22
3.23
3.24

3.26

Check the dimension of over travel


mechanism (Allowable rannge in mm
A2-A1= 6 1 )

3.27

Check the air leakage. (The pressure


should not drop by 10% in 24 hours).

3.28

Check the control cable tightness &


termination.

3.29

Check all the cable glands in entry point


& if any gap will found, fill the gap by
putty.

3.32

Remarks

Check the lock pins of the operating


mechanism are to be in removed
condition.
Check the dimension of wiping main
contact(A4-A3=191mm)
Check the dimension of stroke of
operating mechanism(A4-A1=140+1,
140-3mm)

3.31

No

Check the tightness of all terminals


inside the MOM box.
Check the oil level in the compressor
Check the air pr.15.5 kgf at NTP
Check the operating bar is in disengaged
position.

3.25

3.30

Yes

Check the operation of space heater


Check the door sealing of the local panel
Check the colour paint of each bkr for
phase indication

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No.

Yes
MECHANICAL OPERATION

Description

4.1

At minimum control voltage & min.


air pressure (154/187 V DC & 13
KSC)

4.2

At max. control voltage & max. air


pressure (242 V DC & 15.5 KSC)

4.3

At rated control voltage & rated air


pressure (220 V DC & 15.5 KSC)

4.4

Stored Energy Syetem Tests(No. of


possible Close-Open operations)

4.5

Check correctness of auxillary contact of


BKR in OPEN & CLOSE condition.

4.6

Air & Gas Pressure Switches


Operation Test.

4.7

Safety Valve Operation Test (For


compressed Air)

4.8

Remarks
TESTS

ADDITIONAL TESTS

4.9

Air Charging Test(Time to Charge


from Zero Guage Pressure To Rated
Air Pressure)

4.10

Air Leakage Test (Pneumatic


System)

4.11

SF6 gas Leak Test

4.13

No

HIGH VOLTAGE WITHSTAND TESTS

4.14

Live Parts to Ground(C.B. Closed)

4.15

Between terminals(C.B. Open)

4.16

Control and Auxilliry Circuit to Ground

4.18

PHASE- R(Contact Resistance)

4.19

PHASE- Y(Contact Resistance)

4.20

PHASE- B(Contact Resistance)

4.22

Closing Time(ms) of BKR

4.23

Opening Time(ms) of BKR

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No. -6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5-List of Site Test & its Remarks
Sl.No. Description
Yes
Check the IR value between incoming &
5.1 outgoing terminals. (IR 1500M by
5KV megger)
5.2

Check the IR value between lower


terminal flange & ground. (IR 1500M
by 5KV megger)

5.3

With breaker CLOSED & EARTH


SWITCH as well as ISOLATOR OPEN
condition check IR value in R-Phase, YPhase & B-Phase

5.4

Check the IR value between control


circuit & ground. (IR 100M by 500V
megger)

5.5

Check the Closing coil.(Resistance-126


& currentdrawn =2.3A)

5.6

Check the tripping coil TC-1, & TC-2.


(Resistance-80 & current drawn =2.8A)

No

Remarks

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the tan value of porcelain
5.7
insulator

5.8

Yes

No

Remarks

Check the capacitance & tan of each


grading
capacitor(capacitance=1000pf4% each,
tan=0.007)

5.9

Check phase to phase


distance(Distance=7000 mm approx.)

5.10

Check the air pressure switch as per


scheme

5.11

Check the Compressor-1 ON at air


Pr.14.50.3 kgf

5.12

Check the Compressor-1 OFF at air


Pr.15.20.3 kgf

5.13

Check the low Pr. alarm ON at air


Pr.13.50.3 kgf

5.14

Check the low Pr. alarm OFF at air


Pr.14.50.3 kgf

5.15

Check the low Pr. cut out ON at air


Pr.14.00.3 kgf

5.16

Check the low Pr. cut out OFF at air


Pr.13.00.3 kgf

5.17

Check the Auto recluse lock ON at air


Pr.14.40.3 kgf

5.18

Check the Auto recluse lock OFF at air


Pr.13.90.3 kgf

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-8

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Yes
Check the Safety valve open at air Pr.!7.0
5.19
to !8.0 Kgf
5.20

Check the Compressor -2 ON at air


Pr.14.30.3 kgf

5.21

Check the Compressor -2 OFF at air


Pr.15.20.3 kgf

5.22

Check power operation of the breaker at


no load

5.23

Check the contact resistance of the


breaker contacts(100micro-ohm max.).

5.24

Check the store energy system test-2


operation with compressor off.

5.25

Check the closing time of the


breaker(Less than 150ms)

5.26

Check the opening time of the


breaker(Less than 20ms)

5.27

Check the pole discrepancy within the


pole(2.5ms).

5.28

Check the pole discrepancy between the


poles(3.3ms).

5.29

Check the operating sequence of the


breaker(0-0.3sec-CO-3min-CO.

5.30

Check the air and gas and lockout


operation.

No

Remarks

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
5.31 Check the anti pumping operation.
Check the manual tripping/auto trip
5.32 operation.
5.33

Check the Local, Remote and Auto


reclose operation.

5.34

Check the operation interlock as per


scheme.

5.35

Check noise dB level is below 140dB at


50mtr. From breaker.

5.36

Check operation of breaker alarm &


indication by simulation.

5.37

Check sequence event recorder &


disturbance recorder points by
simulating.

Yes

No

Remarks

6-List of defects and omissions


Sl.No. Description

Yes

No

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

Signatures with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Remarks

Page No.-10

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

Check List for PANTOGRAPH ISOLATOR WITH EARTH


SWITCH
Unique Reference:
Make-: ELPRO International Ltd.

Serial Number:-

R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Agency: LTSL
Package;400KV Switch Yard
Technical specification of the Isolator
Rated Voltage: 420KV
Normal rated current :2000 Amps

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Siganature with Date

2
3
4
5
6
LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
1-List of Drawing and Documents

Sl.No.
1.1
1.2
1.3

Drawing No
10E03100

Description
Key single line diagram For Installation Locations
Installation,Inspection And Maintenance Manual With
Drawings
Block Logic Dia. For interlocking/control philosophy( 1 OF
2)
Control cable Schedule-400KV Switchyard

Available
10E03151
06056-E-SY-SY-CS-0002

1.4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
2-List of testing equipment and T&P
Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
3.0
3.11

Testing equipments/T&P
Multimeter
Tong tester or Clamp meter
5KV megger (Motorised)
500V Megger
Tan delta test set
Milli ohm meter
Discharge Rod
Spanner Set
Screw driver set
Measurement Tape
Torch

Quantity Required
2
2
1
1
1
1
1
1
1
1
1

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page.No-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

3-Physical checks and general Inspections


Yes
No

3.1

Check that Erection work is complete as per


relevant drawings and erection completion
certificate is available

3.2

Check the foundation bolt and tightness.

3.3

Check for proper alignment of structures, support


insulators,earth switch etc.

3.4
3.5

Ensure for proper movement of Earth Blade into the


contact carrier
Check that proper gaskets are given for boxes of
mechanism and centralizing cubicle

3.6

Check that isolator base and earth switch is placed


on structure as per the drawing

3.7

Check for making on support insulators, operating


rods , earth switch and check these matches with
making on base frame.

3.8

check for lubrication of all pivot points of Earth


Switches.

3.9

Check that length of operating rod is adjusted as per


suppliers manual

3.10

Before coming to operation whether the insulators


are cleaned by applying Carbon Tetra Chloride (lab
made) chemical.

3.11

check the bearings,Hexacon bolts,spring lock


washers,Nut ,Zinc washers are lubricated with
Graphite oil or gel.

3.12

The necessary check is carried out to observe the


various switching maneuvers visually. Check all the
parameters like remote/local operation and limit
switches

3.13

After all corrections,ensure the proper course of


motion of contacts by operating the earth switch
manually and set the limit switch position for close
and open condition by giving power supply and
carryout the Electrical operation as per the
instructions given in schematic diagram.

Siganature with Date

Remarks

LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check rating of Operating Motors fuses as per
3.16
scheme & healthiness.
3.17

Check availability of AC/DC auxillary supply to


Isolator & Earth switch.

3.18

Check correctness of auxillary switches contact


position in OPEN & CLOSE condition of Isolator
& Earth switch.

3.19
3.20
3.21
3.22
3.23

Yes

No

Remarks

Check the control cable tightness & termination.


Check all the cable glands in entry point & if any
gap will found, fill the gap by putty.
Check the operation of space heater
Check the door sealing of the local panel
Check phase to phase distance(Distance=7000 mm
approx.)

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No. Description

Yes

No

Remarks

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5-List of Site Test & its Remarks
Sl.No. Description
Check the IR value between incoming & outgoing
5.1 terminals. (IR 1500M by 5KV megger) IN pen
condition
5.2
5.3
5.4
5.5

Yes

No

Remarks

Check the IR value between lower terminal flange


& ground. (IR 1500M by 5KV megger)
Check the tan value of each porcelain insulator
Check the Main & Earth switch motors IR value
by 500V megger
Check wdg resistance of main & earth switch motor

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the capacitance & tan of each grading
5.6 capacitor(capacitance=1000pf4% each,
tan<=0.007)
5.7

Check the Auto reclose lock ON at air Pr.14.40.3


kgf

5.8

Check power operation of the Isolator & Earth


switch at no load

5.9

Check the contact resistance of the Isolator


contacts.

5.10

Check the Local, Remote and Auto reclose


operation.

5.11

Check the operation interlock as per scheme.

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7
Page No.-8

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
6-List of defects and omissions
Sl.No. Description
6.1
6.2
6.3
6.4
6.5
6.6

Yes

No

Remarks

6.7
6.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

Check List for HCB ISOLATOR WITH EARTH SWITCH


Serial Number:-

Unique Reference:
Make-: ELPRO International Ltd.

R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Make:LTSL
Package;400KV Switch Yard
Technical specification of the HCB Isolator
Rated Voltage: 420KV
Normal rated current :2000 Amps

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions

2
3
4
5
6

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
1.1
1.2
1.3

1-List of Drawing and Documents


Description
Drawing No
10E03100
Key single line diagram For Installation Locations
Installation,Inspection And Maintenance Manual
With Drawings
Available
Control cable Schedule-400KV Switchyard
06056-E-SY-SY-CS-0002

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
2-List of testing equipment and T&P
Testing equipments/T&P
Sl.No.
2.1 Multi meter
2.2 Tong tester or Clamp meter
2.3 5KV megger (Motorised)
500V Megger
2.4 Tan delta test set
2.5 Milli ohm meter
2.6 Discharge Rod
2.7 Spanner Set
2.8 Screw driver set
2.9 Measurement Tape
2.10 Torch

Quantity Required
2
2
1
1
1
1
1
1
1
1
1

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

3-Physical checks and general Inspections


Yes
No
Remarks

3.1

Check that erection work is complete as


per relevant drawings and erection
completion certificate is available

3.2

Check the foundation bolt and tightness.

3.3

Check for proper alignment of structures,


support insulators,earth switch etc.

3.4

Ensure for proper movement of Earth


Blade into the contact carrier

3.5

Check that proper gaskets are given for


boxes of mechanism and centralizing
cubicle

3.6

Check that isolator base and earth switch


is placed on structure as per the drawing

3.7

Check for making on support insulators,


operating rods , earth switch and match
with making on base frame.

3.8

check for lubrication of all pivot points of


Earth Switches.

3.9

Check that length of operating rod is


adjusted as per suppliers manual

3.10

Before coming to operation whether the


insulators are cleaned by applying
Carbon Tetra Chloride (lab made)
chemical.

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

Yes

3.11

check the bearings,Hexacon bolts,spring


lock washers,Nut ,Zinc washers are
lubricated with Graphite oil or gel.

3.12

The necessary check is carried out to


observe the various switching maneuvers
visually. Check all the parameters like
remote/local operation and limit switches

3.13

After all corrections,ensure the proper


course of motion of contacts by operating
the earth switch manually and set the
limit switch position for close and open
condition by giving power supply and
carryout the Electrical operation as per
the instructions given in schematic
diagram.

No

Check rating of Operating Motors fuses


as per scheme & healthiness.
3.14

Check availability of AC/DC auxillary


supply to Isolator & Earth switch.

3.15

Check correctness of auxillary switches


contact position in OPEN & CLOSE
condition of Isolator & Earth switch.

3.16

Check the operating bar is in disengaged


position.

3.17

Check the lock pins of the operating


mechanism are to be in removed
condition.

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

Remarks

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the dimension of wiping main
3.18
contact
3.19

Check the dimension of over travel


mechanism (Allowable rannge in mm 6
1 )

3.20

Check the control cable tightness &


termination.

3.21

Check all the cable glands in entry point


& if any gap will found, fill the gap by
putty.

3.22
3.23
3.24

Yes

No

Remarks

Check the operation of space heater


Check the door sealing of the local panel
Check phase to phase
distance(Distance=7000 mm approx.)

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)

2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No. Description

Yes

No

Remarks

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5-List of Site Test & its Remarks
Sl.No. Description
Yes
Check the IR value between incoming &
5.1 outgoing terminals. (IR 1500M by
5KV megger)
5.2

Check the IR value between lower


terminal flange & ground. (IR 1500M
by 5KV megger)

5.3

Check the tan value of each porcelain


insulator

5.4

Check the Main & Earth switch motors


IR valve and resistance values by 500V
megger

5.5

Check the capacitance & tan of each


grading
capacitor(capacitance=1000pf4% each,
tan=0.007)

No

Siganature with Date

Remarks

LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the Auto recluse lock ON at air
5.6
Pr.14.40.3 kgf
5.7

Check power operation of the Isolator &


Earth switch at no load

5.8

Check the contact resistance of the


Isolator contacts.

5.9

Check the Local, Remote and Auto


reclose operation.

5.10

Check the operation interlock as per


scheme.

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-8

6-List of defects and omissions


Sl.No. Description
6.1
6.2
6.3

Yes

No

Remarks

6.4
6.5
6.6
6.7
6.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

Check List for Current Transformer


Unique Reference:
Make-: Crompton Greves Ltd.

Serial Number:-

Type
R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Agency: LTSL
Package;400KV Switch Yard
Technical specification of the Current Transformer
Rated Primary Current: 2000 A
I.L. :
No. Of Cores:
VA :
Ratio:
VK(V) Min.:
Class:

Iexc. (max.) at VK/2 (ma)

ISF

RCT Ohms

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Signature with Date

2
3
4
5
6

LAPPL(E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.

PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
1.1
1.2

1-List of Drawing and Documents


Description
Key single line diagram

Drawing No
10E03100
104E05221

400KV Switchyard earthing system layout


400KV Switchyard protection & metering SLD

1.3
1.4
1.6
1.7

10E03112
Block Logic Dia. For interlocking/control philosophy( 1
OF 2 )
Control cable Schedule-400KV Switchyard
O&M manual

10E03151
06056-E-SY-SY-CS-0002
Available

2-List of testing equipment and T&P


Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11

Testing equipments/T&P

Quantity Required
2
2
1
1
1
1
3-4 Nos.
1
1
1
1

Multi meter
Tong tester
5KV megger (Motorised)
Tan delta test set
Milliohm meter
Milliammeter
1.5 V Cells
Test Leads Set
Discharge Rod
Spanner Set
Screw driver set

Signature with Date


LAPPL(E/M)

LAPPL(O&M)

LITL

L&T

Page.No-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.

Description

3-Physical checks and general Inspections


Yes
No

3.1

Check that Erection work is complete as


per relevant drawings and erection
completion certificate is available

3.2

Check the foundation bolt and tightness.

3.3
3.4
3.5

Check for CT Base Earthing is firmly done


Check for cleanliness of Porcain insulator
The Bellow should be clearly Visible
"CX" lead should be connected to Earth
inside terminal box

3.6
3.7

Check Tightness of CT secondary


connections

3.8

Secondary Winding connections which is


not in use should be short ckted.

3.9

The VA burden value of the connected


instrumentation does not exceed the values
specified on the specification plate of the
CT

3.10

Polarities of Primary and Secondary


connections are as per the schematics on
Rating Plates

Remarks

Signature with Date


LAPPL(E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
3.11
3.12
3.13

Yes

Description

No

Remarks

Desired ratio is correctly selected as per the


schematics on the Rating plate
Bellow Position of the CT is at middle of
the Minimum and maximum positions
marked on the Hood
Secondary box is tightly closed

Signature with Date


LAPPL(E/M)

LAPPL(O&M)

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
3.18

Description
Check rating of fuses as per scheme &
healthiness.

3.19

Check availability of AC/DC auxillary


supply to Isolator & Earth switch.

3.20

Check correctness of auxillary switches


contact position in OPEN & CLOSE
condition of Isolator & Earth switch.

3.21

Check the operating bar is in disengaged


position.

3.22

Check the lock pins of the operating


mechanism are to be in removed condition.

3.23

Check the dimension of wiping main


contact

3.24

Check the dimension of stroke of operating


mechanism

3.25
3.26
3.27
3.28
3.29
3.30

Yes

No

Remarks

Check the dimension of over travel


mechanism (Allowable rannge in mm 6
1 )
Check the control cable tightness &
termination.
Check all the cable glands in entry point &
if any gap will found, fill the gap by putty.
Check the operation of space heater
Check the door sealing of the local panel
Check phase to phase
distance(Distance=7000 mm approx.)

Signature with Date


LAPPL(E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No.
4.1

Description
TESTS CONFIRMING TO IEC 600441(1996)

4.2

Verification of terminal marking and


Polarity test

4.3

Over Voltage Interturn test for One


Minute

4.4

Power Frequency High Voltage


withstand test for one Minute -3 KV
Between secondary wdg. And
secondary to Frame and Earth for
Metering/Protection
Composite Error(%) TEST

4.5

Secondary Terminals :
core selected

4.6

Resistance @ 75 deg.C(ohms)

4.7

Voltage Applied(volts)- 620 Volts


Excitation Current(mA)

4.5
4.6

Composite Error(%)
KNEE POINT VOLTAGE TEST(V)

4.7

Secondary Terminals :
core selected

4.8

Sec. Resistance @ 75C (Ohms)

4.9

Knee Point Voltage in Volts

4.10

Excitation Current(mA)
INSTRUMENT SECURITY FACTOR
Secondary Terminals :
core selected
Sec. Resistance @ 75C (Ohms)
Voltage Developed at 500 mA

Yes

No

Remarks

ISF
SPECIAL TESTING
CAPACITANCE AND TAN DELTA
MEASUREMENTS (HV TO CX)
Applied Voltage (KV) - 10 KV
Capacitance(pF) (Before High Volt.
Test)
Tan Delta (Before High Volt. Test)
Capacitance(pF) (After High Volt. Test)
Tan Delta (After High Volt. Test)
Applied Voltage (KV) - 231KV
Capacitance(pF) (Before High Volt.
Test)
Tan Delta (Before High Volt. Test)
Capacitance(pF) (After High Volt. Test)
Tan Delta (After High Volt. Test)
POWER FREQUENCY HIGH
VOLTAGE WITHSTAND TEST FOR
ONE MINUTE
Primary To Secondary,Frame To Earth
Voltage Applied(KV) - 630 KV
Partial Discharge value at 267 KV (i.e.
1.1*Um/Root 3 KV) after HV Test

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5-List of Site Test & its Remarks
Sl.No.
5.1
5.2
5.3
5.4
5.5
5.6
5.7

Description

Yes

CT ratio Test
CT Polarity Test
Knee Point Voltage Test
Capacitance Measurement
Tan Delta Measurement
Oil BDV Testing
Oil PPM Testing

Signature with Date

No

Remarks

LAPPL(E/M)

LAPPL(O&M)

LITL

L&T
Page No.-6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
6-List of defects and omissions
Sl.No.
5.31
5.32
5.33
5.34
5.35
5.36
5.37
5.38

Description

Yes

No

Page No.-9

Remarks

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

CHECK LIST FOR CAPACITOR VOLTAGE TRANSFORMER


Unique Reference:
Make-: ELPRO International Ltd.

Serial Number:-

R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Agency: Siemens Ltd.
Package;400KV Switch Yard
Technical specification of the Isolator
Rated / Highest System Voltage :
VA burden :
No. of Cores :
Accuracy Class :
Transformation Ratio :
Equivalent Capacitance Coupling :

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Siganature with Date

2
3
4
5
6
LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
1-List of Drawing and Documents

Sl.No.
1.1
1.2

Drawing No

Description
Key single line diagram

10E03100
104E05221

400KV Switchyard earthing system layout


400KV Switchyard protection & metering SLD

1.3
1.4
1.6
1.7

10E03112
Block Logic Dia. For interlocking/control philosophy( 1
OF 2 )
Control cable Schedule-400KV Switchyard
O&M manual

10E03151
06056-E-SY-SY-CS-0002
Available

2-List of testing equipment and T&P


Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7

Testing equipments/T&P
Multi meter
Voltage Source(415 V Dimmerstat)
5KV megger (Motorised)
Milliohm meter
Discharge Rod
Spanner Set
Screw driver set

Quantity Required
2
1
1
1
1
1
1

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page.No-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

3-Physical checks and general Inspections


Yes
No

3.1

Check that Erection work is complete as per


relevant drawings and erection completion
certificate is available

3.2

Check the foundation bolt and tightness.

3.3

3.5

Check for proper alignment of structures.


Check for proper Earthing of EMU Tank. NHF
and N
Check for corrctness of ratio as name plate

3.6

Strictly check that secondary ckt. Is not shorted.

3.7

Check for firmness of all connections.


Go for visual checking of Varistor for bulging
or burning.

3.4

3.8
3.9

Check that EMU is completely filled with oil


and check colour of oil.

3.10

Check for oil leakages if any.

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Yes
Check for cleanlyness and door gasket sealings
3.11
of terminal box.
3.12

No

Remarks

Check for dust accumulation on Porcelain


Insulators.

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
3.18
3.19
3.20

Description
Check all metal parts for corrosion.
Check for tank temperature.
Check for Capacitor healthyness.

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No. Description

Yes

No

Remarks

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

5-List of Site Test & its Remarks


Sl.No. Description
IR VALUES BY 5 KV MOTORISED
5.1
MEGGER AS FOLLOWS.
5.2 Primary To Earth
5.3 Primary To Secondary(Individual Core)

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the capacitance & tan of each grading
5.3 capacitor(capacitance=1000pf4% each,
tan=0.007)

Yes

No

Remarks

5.4
5.10
5.11
5.12
5.13
5.14
5.15
5.16

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the Auto recluse lock ON at air
5.17
Pr.14.40.3 kgf
5.18
5.19
5.20
5.21
Check power operation of the Isolator & Earth
5.22
switch at no load
5.23

Yes

No

Remarks

Check the contact resistance of the Isolator


contacts.

5.24
5.25

Check the closing time of the breaker(Less than


150ms)

5.26

Check the opening time of the breaker(Less


than 20ms)

5.27

Check the pole discrepancy within the


pole(2.5ms).

5.28

Check the pole discrepancy between the


poles(3.3ms).

5.29
5.30

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-8

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Yes
5.31
5.32 Check the manual tripping/auto trip operation.
Check the Local, Remote and Auto reclose
5.33
operation.
5.34 Check the operation interlock as per scheme.
Check noise dB level is below 140dB at 50mtr.
5.35
From breaker.
5.36

No

Remarks

Check operation of breaker alarm & indication


by simulation.

5.37
5.38

6-List of defects and omissions


Sl.No. Description

Yes

No

Remarks

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

Check List for PANTOGRAPH ISOLATOR & EARTH SWITCH


Unique Reference:
Make-: ELPRO International Ltd.

Serial Number:-

R-Phase
Y-Phase
B-Phase
Location: 400kv Switch Yard
Bay Name:Agency: Siemens Ltd.
Package;400KV Switch Yard
Technical specification of the Isolator
Rated Voltage: 420KV
Normal rated current :2000 Amps
Max. Breaking Capacity: 40kA rms
Rated Insulating Level: 1425 KV
Peak withstand current:100KA

Rated Short time current rating: 40kA for 3 sec

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Siganature with Date

2
3
4
5
6
LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
1-List of Drawing and Documents

Sl.No.
1.1
1.2

Drawing No

Description
Key single line diagram

10E03100
104E05221

400KV Switchyard earthing system layout


400KV Switchyard protection & metering SLD

1.3

10E03112

1.4

Block Logic Dia. For interlocking/control philosophy( 1


OF 2 )

10E03151

1.5
1.6
1.7

400KV Switchyard GA & RCC details of equipment


foundation
Control cable Schedule-400KV Switchyard
O&M manual

00S08433
06056-E-SY-SY-CS-0002
Available

2-List of testing equipment and T&P


Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

Testing equipments/T&P
Multi meter
Tong tester
5KV megger (Motorised)
Tan delta test set
Milliohm meter
Discharge Rod
Spanner Set
Screw driver set

Quantity Required
2
2
1
1
1
1
1
1

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page.No-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

3-Physical checks and general Inspections


Yes
No

3.1

Check that Erection work is complete as per


relevant drawings and erection completion
certificate is available

3.2

Check the foundation bolt and tightness.

3.3

Check for proper alignment of structures,


support insulators,earth switch etc.

3.4
3.5

Remarks

Ensure for proper movement of Earth Blade


into the contact carrier
Check that proper gaskets are given for boxes
of mechanism and centralizing cubicle

3.6

Check that isolator base and earth switch is


placed on structure as per the drawing

3.7

Check for making on support insulators,


operating rods , earth switch and match with
making on base frame.

3.8

check for lubrication of all pivot points of Earth


Switches.

3.9

Check that length of operating rod is adjusted


as per suppliers manual

3.10

Check for earth switches, all contact points are


lubricated with petrolium jelly

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
3.11

3.12

Yes

No

Remarks

Check the earthing of support structure, breaker


frame and MOM boxes is done properly.

Check the cable have been terminated in MOM


boxes of breakers as per the cable schedule and
equipment wiring diagram. Check proper
glanding of cable and ensure plugging of un
used cable entries of MOM boxes,sealing and
locking of MOM boxes against water

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check rating of fuses as per scheme &
3.18
healthiness.
3.19

Check availability of AC/DC auxillary supply to


Isolator & Earth switch.

3.20

Check correctness of auxillary switches contact


position in OPEN & CLOSE condition of
Isolator & Earth switch.

3.21

Check the operating bar is in disengaged


position.

3.22

Check the lock pins of the operating mechanism


are to be in removed condition.

3.23

Check the dimension of stroke of operating


mechanism

3.25

Check the dimension of over travel mechanism


(Allowable rannge in mm 6 1 )

3.26

Check the control cable tightness &


termination.

3.27

Check all the cable glands in entry point & if


any gap will found, fill the gap by putty.

3.30

No

Remarks

Check the dimension of wiping main contact

3.24

3.28
3.29

Yes

Check the operation of space heater


Check the door sealing of the local panel
Check phase to phase distance(Distance=7000
mm approx.)

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No. Description

Yes

No

Remarks

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10

5-List of Site Test & its Remarks


Sl.No. Description
Check the IR value between incoming &
5.1 outgoing terminals. (IR 1500M by 5KV
megger)
5.2
5.3

Yes

No

Remarks

Check the IR value between lower terminal


flange & ground. (IR 1500M by 5KV
megger)
Check the tan value of each porcelain insulator

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the capacitance & tan of each grading
5.3 capacitor(capacitance=1000pf4% each,
tan=0.007)
5.4
5.5
5.10
5.11
5.12
5.13
5.14
5.15
5.16

Yes

No

Remarks

Check the air pressure switch as per scheme

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Check the Auto recluse lock ON at air
5.17
Pr.14.40.3 kgf
5.18
5.19
5.20
5.21
Check power operation of the Isolator & Earth
5.22
switch at no load
5.23

Yes

No

Remarks

Check the contact resistance of the Isolator


contacts.

5.24
5.25

Check the closing time of the breaker(Less than


150ms)

5.26

Check the opening time of the breaker(Less


than 20ms)

5.27

Check the pole discrepancy within the


pole(2.5ms).

5.28

Check the pole discrepancy between the


poles(3.3ms).

5.29
5.30

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-8

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
Yes
5.31
5.32 Check the manual tripping/auto trip operation.
Check the Local, Remote and Auto reclose
5.33
operation.
5.34 Check the operation interlock as per scheme.
Check noise dB level is below 140dB at 50mtr.
5.35
From breaker.
5.36

No

Remarks

Check operation of breaker alarm & indication


by simulation.

5.37
5.38

6-List of defects and omissions


Sl.No. Description

Yes

No

Remarks

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

CHECK LIST FOR LT SWITCH GEARS


Serial Number:-

Technical specification of Lt Switch Gears

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions
Siganature with Date

2
3
4
5
6
LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-1

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No.
1.1
1.2
1.3
1.4
1.5
1.6

Description
Key single line diagram
O&M manual

1-List of Drawing and Documents


Drawing No

Available

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
2-List of testing equipment and T&P
Sl.No.
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10

Testing equipments/T&P
Multi meter
Tong tester
500 V Megger
Voltage Source (Dimmer)
Current Injection Kit
Discharge Rod

Quantity Required
2
2
1
1
1
1
1
1
1
1

Spanner Set
Screw driver set
Plier
Torch

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page.No-2

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

3-Physical checks and general Inspections


Yes
No
Remarks

3.1

Check that Erection work is completed as per


relevant drawings and erection completion
certificate is available

3.2

Check the foundation bolt and tightness.

3.3

Check that all the doors locking mechanisms


and allignments are proper

3.4

Check for proper alignment of structures,


support insulators,earth switch etc.

3.5

Check for the tightness of all Bus-Bars


connections,support insulators,Feeder Trollies
support ,Fuse Holders & bases,All Power and
Control Connections.
Check the ratings and Specifications of all
Transformers,MCCB's,Breakers,Isolators and
Switches are correct and matching with the
Drawings.
Check the ratings of all Fuses

3.6

Check for ON/OFF Operations of LT breakers


or Isolators and their allignments.

3.7

Check for ON/OFF Operations of all outgoing


feeders and their allignments.

3.9
3.10

Checking of Power and Control Cables


connections tightness.
visible inspection of all T/B's.
Visible inspection of CT's and PT's Ckts.

3.11

Inspections of Cables Glands

3.12

Check that all remaining cable holes are filled


with sealent.

3.13

Check that all fire proofing seals are proper.

3.14

Check that all wires Ferruling is done as per the


drawings.

3.15

Check all the Cables Tagging are matching to


the Terminations.

3.16

Check for both ends earthings of panel.

3.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-3

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T

Page No.-5

Page No.-5

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
4-List of Facory Test & its Remarks
Sl.No. Description

Yes

No

Remarks

Yes

No

Remarks

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
Sl.No. Description

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-6

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5. List Of Site Tests & it's Remarks
Sl.No. Description

5.1

5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15

Yes

Remarks

IR Value of Bus-Bars with B/C Closed


R - Earth =
Y - Earth =
B - Earth =
IR Value Of Control Ckt.
IR Value Of Space Heaters
Earthing Ckt. Continuety Check
CT TESTING
Polarity Test
Ratio Test
Winding Resistance Test
VT TESTING
Ratio Test
Control Transformer Testing
Contact Resistance Test For Bus-Bars
IR Value Of Distribution Transformer
Primary

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-7

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
5.25
5.26
5.27
5.28
5.29
5.30

Yes

No

Remarks

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-8

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
5.31
5.32
5.33
5.34
5.35
5.36
5.37
5.38

Yes

Sl.No. Description

Yes

No

Remarks

6-List of defects and omissions


No

Remarks

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

Siganature with Date


LAPPL(
E/M)

LAPPL(O&M)

LITL

L&T
Page No.-9

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS

CHECK LIST FOR DCDB-220V


Make : Control & Switchgear

Technical specification of Lt Switch Gears


Type : Incomer-P1/511 ; Bus Coupler ; P2/512
;
O/G Feeders - S4/526

Fault Level : 15 KA For 1 Sec.

Voltage : 220 V DC

Incomer MCCB rating : 125 Amps (Qty. 2


Nos.)

Bus-Bar Current Rating : 100 A


Bus-Bar Size : 1(50*12) / (+Ve and -Ve)

Bus Coupler MCCB rating : 125 Amps


(Qty 2 Nos.)

INDEX
Sl.No

Description

List of Drawing and documents


List of testing Equipments and T&P required
Physical checks and General Inspections
List of Facory Test & its Remarks
List of Site Test & its Remarks
List of defects and omissions

2
3
4
5
6

Siganature with Date


LAPPL(E
/M)

LAPPL(
O&M)

LITL

L&T

Page 68 of 81

Page No.-1

Page 69 of 81

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
1-List of Drawing and Documents

Sl.No.
1.1
1.2

Description
Key single line diagram

Drawing No
LANCO/J2250/106
LANCO/J2250/206

General Arrangement Drawings

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
2-List of testing equipment and T&P
Testing equipments/T&P
Sl.No.
Quantity Required
2.1 Multi meter
2
2.2 Tong tester
2
2.3 500 V Megger
1
2.4 Milliohmmeter
2.5 Voltage Source (DC)
1
2.6 Current Injection Kit
1
2.7 Discharge Rod
1
2.8 Spanner Set
1
2.9 Screw driver set
1
2.10 Plier
1

Siganature with Date


LAPPL(E
/M)
LITL

LAPPL(
O&M)
L&T

Page 70 of 81

Page No.-2

Page 71 of 81

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
3-Physical checks and general Inspections
Y
eYes
s

Sl.No. Description

3.1

Check that Erection work is completed


as per relevant drawings and erection
completion certificate is available

3.2

Check the foundation bolt and tightness.

3.3

Check that all the doors locking


mechanisms and allignments are proper

3.4

Check for proper alignment of structures,


support insulators,earth switch etc.

3.5
3.6

Check the proper tightness of Fish Plates


between the BUS sections.
Check the colour coding Positive and
Negetive Bus-Bars.

3.7

Check that proper gaskets are given for


door for sealing

3.8

Check for the tightness of all Bus-Bars


connections,support insulators,Feeder
Trollies support ,Fuse Holders &
bases,All Power Connections.

Page 72 of 81

No

Remarks

3.9

4.0

Check the Locking System of MCCBs


for Isolation Purpose.
Check that backelite sheets insulation are
to be provided at incoming & outgoing
feeders.

4.1

Check the ratings and Specifications of


all MCCB's,Isolators and Switches are
correct and matching with the Drawings.

4.2

Check the ratings & healthiness of all


Fuses as per Drawings

4.3

Check for ON/OFF Operations of LT


breakers or Isolators and their
allignments.

4.4

Check for ON/OFF Operations of all


outgoing feeders and their allignments.

4.5

Checking of Power and Control Cables


connections tightness.

4.6

Check for the name plates of space


heaters and danger boards on Cable alley
doors.

4.7

check for the Names Plates of all the


feeders.

4.8

visible inspection& tightness of all T/B's.

4.9

Visible inspection of Current


transducer& Voltage transducer.
Page No. -3

Page 73 of 81

5.0

Inspections of Cables Glands

5.1

Check that all remaining cable holes are


filled with sealent.

5.2

Check that all fire proofing seals are


proper.

5.3

Check that all wires Ferruling is done as


per the drawings.

5.4

Check all the Cables Tagging are


matching to the Terminations.

5.5

Check for both ends earthings of panel.

Siganature with Date


LAPPL(E
/M)
LITL

LAPPL(
O&M)
L&T

Page 74 of 81

Page No.-4

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description
4.1

4-List of Facory Test


Y & its Remarks
eYes
No
Remarks
s

IR VALUES OF DC POWER CIRCUIT WITH 500 V MEGGER

4.2

P-N

>200 M.Ohms

4.3

P-E

>200 M.Ohms

4.4

N-E

>200 M.Ohms

4.5

IR VALUES OF AC SPACE HEATER


CIRCUIT WITH 500 V MEGGER

4.6

PH - N

>200 M.Ohms

4.7

PH - E
N-E

>200 M.Ohms
>200 M.Ohms

Withstood
Withstood
Withstood

4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15
4.16

LAPPL(
E/M)

HIGH VOLTAGE TEST : D.C. POWER


CIRCUIT AT 2.5KV FOR 1 Minute

P-N
P-E
N-E
A.C. Space Heater Ckt at 1.5 KV for 1
minute

PH - E
PH - N
N-E

Siganature with Date


LAPPL(
O&M)

Page 75 of 81

Withstood
Withstood
Withstood

LITL

L&T
Page No.-5

Page 76 of 81

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
5. List Of Site Tests & it's Remarks
Y
e
s

Sl.No. Description
Closed

Remarks

5.1

5.2
5.3
5.4
5.5
5.6
5.7

Positive - Negetive
Positive - Earth
Negetive - Earth
IR Value Of Space Heaters
Ph - N =
Ph - E =
N-E =
Earthing Ckt. Continuety Check
Contact Resistance Test For Bus-Bars

Positive Bus-bar
Negetive Bus-Bar
5.8
Relay Testing (FDCI 27/59)
Checking of E / F Element Pick up &
5.9
Drop off
Checking of U / V Relay (Element
5.12
Pick Up & Drop off)
Checking of O / V Relay (Element
5.13
Pick Up & Drop off)
Siganature with Date
LAPPL(
LAPPL(
E/M)
O&M)
LITL

L&T

Page 77 of 81

Page N0.-6

Page 78 of 81

LANCO AMARKANTAK POWER PVT. LTD.


PATHADI,KORBA,(CG)
2 x 300MW UNITS
Sl.No. Description

6-List of defects and omissions


Y
eNo
Remarks
s

6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

LAPPL(
E/M)
LITL

Siganature with Date


LAPPL(
O&M)
L&T
Page No.-7

Page 79 of 81

Page 80 of 81

Page 81 of 81

S-ar putea să vă placă și