Sunteți pe pagina 1din 29

Preparation for SEM Asia 2016

Colin Chin & Kashka Tobias


July 2015

AGENDA
1.

Review of SEM Asia 2015

2.

The Journey

3.

The registration process (Phase 1, Phase 2, Phase 3)

Preparation

Challenges that SEM teams face

Submissions

Selection basis

World Cup

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

1.0

REVIEW OF SEM ASIA 2015


Statistics

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

BEFORE THE EVENT

Not

ready

200
180

182

174

160

140

No

time

120

No

funding

100

129

126

15/2/27

Reasons

Teams

15/2/10

Lots of teams dropped out prior


to the event

80
60
40
20

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

14/11/12

14/8/31

AT THE EVENT
113 teams (90% ) passed
technical inspection
61 teams (48%) managed to do
a valid run
No cars came through technical
inspection on the first day
It

was even commented that


Asian teams seem more
interested in taking pictures
than getting cars ready

We need to improve the quality


of the teams
Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

Number of teams
140

126
113

120

99

100
80

61

60
40
20
0

On site

Passed On track Valid runs


tech
inspection
5

THE WELDING SHOP WAS REALLY BUSY!


Purpose

To help desperate teams!

To provide a safe place for


teams to make minor
alterations to their cars on
site

To help teams procure parts

At any one time 5 or 6


teams were there

From Wednesday through


to Sunday !

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

Ideally, there should be no cars here


during the event !

ASIAN TEAMS VS EUROPEAN TEAMS


Asian teams are still way behind the European teams
Max of Best attempt

3000
2500
2000
1500
Region

1000

Asia
Europe

500

Prototype
Competition category

Hydrogen

Gasoline

Ethanol

Diesel

Battery-electric

Hydrogen

Gasoline

Ethanol

Diesel

CNG

Battery-electric

UrbanConcept

Energy type

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

THE SAD TRUTH


Most of the cars were not ready on arrival

Lots of teams only passed technical inspection toward the end


The low number of valid runs indicates that:

They did not have time for practice sessions


(not able to get a handle on the right speed, number of laps)

The cars were not reliable even though they passed

Technical Documentation at the event is still poor


Some teams treat the event like going on a holiday

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

2.0

THE JOURNEY

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

THE REGISTRATION PROCESS


3 phases of registration

Phase 1 (closing 22 Jul 2015)

Phase 2 (closing 1 Sep 2015)

Phase 3

Logistics and Documentation (closing 14 Dec 2015)

Off-track awards (closing 15 Feb 2016)

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

10

TIMELINE
Note closing dates in red cells

We are now in

Phase 1 registration
July

Phase I Opens

7/1/2015

Phase I Closes

7/22/2015

Selection Announcement

7/28/2015

Phase II Opens

7/28/2015

August

September

Phase II Closes

9/1/2015

Final Selection Announcement

9/9/2015

Phase III Opens

9/9/2015

Phase III Logistics Closes


Phase III Off-track awards Opens
Phase III Off-track awards closes

Event date
Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

October

November

December

January

February

March

12/14/2015
9/9/2015
2/15/2016
3rd - 6th
March 2016

11

THINGS THAT NEED TO BE DONE


Forming a team

Registration process
University approval
Car (design, construction, testing)
Funding/sponsorship
Communications
Shipping & customs clearance (car, lithium batteries)
Team logistics (passports, accommodation, flights)

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

12

KEY CHALLENGES
Time to build and test car

Allow sufficient time to design, build and test the car

Funding

Many teams drop out due to lack of funds

Start looking for funding early

Shipping the car in time

Customs clearance can take very long

Ship early

Get the car ready early

Shipping lithium batteries in advance (some battery electric teams did not
have their batteries on arrival and could not buy them locally)

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

13

WHEN SHOULD YOU START PREPARING


NOW

Time is of essence !

Work backwards from the point of shipping (14 Dec 2015)

Consider whether it may be better to aim for 2017 (dont apply for 2016)

Dont deprive other teams a chance if you think youre not ready

The sooner you can design, build and test the car, the better your success

Phase 1
1 Jul 22 Jul

Phase 2
28 Jul 1 Sep

Design Car
1 Jul 1 Sep
Secure funding
1 Jul 13 Nov
Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

Phase 3
9 Sep 13 Dec

Build Car
9 Sep 13 Nov

Test Car
14 Nov 13 Dec

Shipping
14 Dec 2015

Tickets, shipping
14 Nov 13 Dec
14

PHASE 1 REGISTRATION
Closing date: 22nd July 2015

Registration of intent
SEM participation history required
Full design details not required at this point
Pictures of the car should be as detailed as possible (real pictures
preferred)
Some teams will be eliminated
We are looking for:

Teams that are likely to make it to the event in Manila

Teams that will be ready for technical inspection the moment they arrive

It is up to you to convince the selection committee

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

15

PHASE 2 REGISTRATION
Closing date: 1 Sep 2015

Motivation for participation


Full technical submission required

Pictures of the car should be as detailed as possible (real pictures preferred)

Electrical system diagram

Propulsion system diagram

More teams will be eliminated


Same criteria

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

16

SELECTION BASIS
Emphasis will be on

Competitiveness (previous results, good design)

Quality of submission (meeting the rules)

Likelihood that the car will be ready on arrival (degree of completion)

Sufficient funding

Motivation

Constraints

Maximum of 2 teams per institute

This is not guaranteed (it may be just ONE as it depends on availability)

If there are 2 teams, these should be from different categories


Prototype & UrbanConcept (preferred)
Two identical cars with different energy types (NOT preferred)

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

17

WHICH CARS ARE MOST LIKELY TO BE CHOSEN?


8

10

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

18

WHICH CARS ARE MOST LIKELY TO BE CHOSEN?


8

10

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

19

A PICTURE SAYS A THOUSAND WORDS - 1


What this picture says:

Not much thought into the design

Not motivated

Does not comply with rules

Not professional

Car is not ready

Chance of success = ZERO

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

20

A PICTURE SAYS A THOUSAND WORDS - 2


What this picture says:

This team is serious

It shows compliance
(dimensions, features e.g. windows, emergency
shutdown, exhaust pipes, lights, ventilation, mirrors,
5 point safety belts)

Motivation

Very professional

Chance of success = HIGH

What could be improved

Show roll bar, bulkhead

Picture of completed car or car construction


in progress

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

21

ELECTRICAL SYSTEM DIAGRAMS - 1


What do these pictures show?

Almost nothing !

Do not show key elements of the electrical


system and how they are connected

Do not show compliance with rules

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

22

ELECTRICAL SYSTEM DIAGRAMS - 2


This drawing shows:

Point to point electrical circuit


diagram

Includes key electrical system


elements switches, lights,
relays, fuses, kill switches

Shows voltages, fuse ratings,


power ratings

Compliance with the rules

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

23

PICTURES
Use your submitted pictures to:

Demonstrate as much as possible that you comply with the rules


(Go through the rules and think how you can show it in your pictures)

Demonstrate the progress that you have made with your car

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

24

PHASE 3 REGISTRATION
2 parts

Logistics (closing 14 Dec 2015) (Note: Students should book in SEM


accredited hotels)

Off-track awards (closing 15 Feb 2016)

Includes

Registration of team members (passport, ID)

Letter from university

Shipping arrangements

Registration for off-track awards

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

25

SHIPPING
Sea freight

Cheapest

Recommended for battery-electric teams (to ship lithium-ion batteries)

Must commence in December

Air freight

More expensive

Can start in January

Arrival in Manila does not mean the car will be on site

Customs clearance can take 2 weeks

Lithium ion batteries cannot be shipped with the car

Lithium ion batteries are difficult in Manila to find at short notice. Assume
there is none available

Send these separately in advance according to DG guidelines

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

26

OUR CHALLENGE TO YOU


Have your cars go for technical inspection on Registration day

Arrive > Register > Unpack > Technical Inspection

(Note: Only teams that passed technical inspection will be granted a certificate.)

Aim not to use the Welding Garage

We would like to see it empty

Show the world that Asian teams are competitive

Dont just think about building cars . . .

Think about energy efficient cars

Lets close the gap !

Europe
Asia

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

27

3.0

SEM WORLD CUP

Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

28

SEM WORLD CUP


Beginning in 2016, a World Cup for top SEM teams from around the
world will be held at the end of the European event

This is for UrbanConcept cars only

In 2016 year this will be in London, around July

Up to 10 UrbanConcept cars will be invited to London to compete

The format of the competition will be provided later, but will also comprise
some elements of speed
Asian team ?

1
2
Copyright of SHELL GLOBAL SOLUTIONS (SDN. BHD.)

3
29

S-ar putea să vă placă și