Los parmetros fsicos segn la definicin adoptada por el
Bureau of Reclamation de Estados Unidos (Bureau of
Reclamation, 1998) se muestran grficamente en la Figura. 1
AMH
AMH
Tipo
presa
Talud lateral
Ancho Promedio de
de brecha Zb Tiempo de
de la brecha (expresado
(Zb
falla
en
trminos
de
horizontal:1
(horas)
altura de la presa)
vertical)
Presa de
materiales
sueltos
Min:0.4 H
Max: 13 H
Medio 4 H
Min: 0
Max: 6
Medio: 1
Min:0.1
Max: 12
Medio: 2
Presa de
gravedad
Nmero entero de
tamao de bloques
monolticos
Vertical a 1:1
0.1 a 0.5
Presa de
arco
0 a 0.1
Area (m2)
2.0
30.0
38.0
68.0
5.0
30.0
50.0
200.0
7.0
30.0
58.0
308.0
10.0
30.0
70.0
500.0
Ecuacin
Qp=0.607(Vw0,295hhw1.24) (1)
Qp=3.85(Vw hw)0.411
(2)
Qp=1.154(Vw hw)0.412
(3)
AMH
AMH
Qp=1.268(hw +0.3)
Qp=16.6(hw)1.85
Qp=19.1(hw)1.85
Qp=0.981(S hd)0.42
Qp=0.54(S hd)0.5
Qp=2.634(S hd)0.44
2.5
(4)
(5)
(6)
(7)
(8)
(9)
Qp=0.72(Vw)0.53
Qp=1.776(S)0.47
(10)
(11)
Qp=1.122(S)0.57
Qp=13.4(hd)1.89
(12)
(13)
Donde:
I i + I i +1 Oi + Oi +1 Vi +1 Vi
=
2
2
t
(14)
Donde:
I = gasto de entrada al vaso
O = gasto de salida del vaso
dV
dt
Tipo 1
Tipo 2
Tipo 3
20
15
10
5
0
0
500000
1000000
1500000
Almacenamiento (m3)
Figura 2.- Curvas tipo para estimacin de avenidas por rotura de
presa
AMH
Hidrogramas de falla.
Curva e-c tipo 1
Gasto (m3/s)
AMH
Altura de
cortina
1600.0
1400.0
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
1m
H2m
H5m
H7
H10
0.0
0.5
1.0
K=2
Figura 6.- seccin de cauce simulado
1.5
2.0
Tiempo (Horas)
Figura 3.- Hidrograma de falla curva e-c-tipo1
Hidrogramas de falla
curva e-c tipo 2
1600.00
1400.00
Q (m3/s)
1200.00
1000.00
800.00
H2
H5
H7
H10
600.00
400.00
200.00
0.00
0.00000
0.20000
0.40000
0.60000
0.80000
1.00000
Tiempo (Horas)
Q (m3/s)
1600.00
1400.00
1200.00
1000.00
800.00
600.00
400.00
200.00
0.00
0.00000
Hidrogramas de falla
curva e-c tipo 3
Altura de
cortina
H2
H5
H7
H10
0.10000
0.20000
0.30000
0.40000
Tiempo (Horas)
Figura 5.- Hidrograma de falla curva e-c-tipo 3
Resultados
Los resultados de las alternativas analizadas se muestran en
las tablas siguientes:
Tabla 4.- Distancia de peligro calculada mediante HEC-RAS
Curva e-c tipo 1
Potencial
H
Plantill
Altura de dao
a cauce
Volumen cortina
Joules X
b
Distancia de
(m)
So
peligro (m)
(m3)
(m)
109
50000
0.98
10
0.001
178
50000
0.98
30
0.001
12
50000
0.98
50
0.001
290000
14.22
10
0.001
5150
AMH
AMH
14.22
30
0.001
2640
290000
14.22
50
0.001
1780
528571
36.30
10
0.001
12450
48077
2,358.17
50
0.001
140
528571
36.30
30
0.001
6410
89130
6,120.59
10
0.001
740
528571
36.30
50
0.001
5850
89130
6,120.59
30
0.001
480
6,120.59
50
0.001
420
1400000
10
137.34
10
0.001
41310
89130
1400000
10
137.34
30
0.001
26919
175758
10
17,241.82
10
0.001
2200
1400000
10
137.34
50
0.001
19280
175758
10
17,241.82
30
0.001
1270
175758
10
17,241.82
50
0.001
1100
Plantilla
cauce
Volumen
H
Altura
cortina
(m3)
(m)
Joules X
109
(m)
So
Distancia
de
peligro
(m)
33333
0.65
10
0.001
100
33333
0.65
30
0.001
33333
0.65
50
0.001
100000
4.91
10
0.001
820
100000
4.91
30
0.001
490
100000
4.91
50
0.001
350
180000
12.36
10
0.001
2280
180000
12.36
30
0.001
1260
180000
12.36
50
0.001
930
364286
10
35.74
10
0.001
7580
364286
10
35.74
30
0.001
3960
364286
10
35.74
50
0.001
2800
377.31
30
0.001
19231
377.31
50
0.001
48077
2,358.17
10
0.001
310
AMH
AMH
20
15
10
Tipo 1
Tipo 2
Tipo 3
Presas SAGARPA
0
0
500000
1000000
1500000
Almacenamiento (m3)
AMH
AMH
Conclusiones
Con
poblacin
500
3 y menor de 15
Con
poblacin
Sin
poblac
in
No se requiere
Tr (aos) de la
avenida de la obra
de excedencias 5
Longitud de obra de
excedencia
30%
mnimo
de
la
longitud
de
la
cortina
Aplicar mtodo
Racional
Con
poblac
in
La
que
resulte
mayor de aplicar los
mtodos:
Hidrograma
Unitario Triangular
(HUT) y Ven Te
Chow,
Sin poblacin
Poblac
in en
riesgo
dentro
de la
longit
ud de
peligr
o por
rompi
mient
o4
Menor de 3
Longitud
de obra de
excedencia
30%
mnimo de
la longitud
de
la
cortina
Al
tu
ra
de
co
rti
na
[
m
]
500
Sin
poblac
in
Presentar
dimensionamiento
del bordo, diseo
hidrulico de la obra
de excedencias y la
curva elevacionescapacidades.
Con
poblac
in
Estudios geolgico-geotcnicos
10,000
3 y menor de 15
Menor de 3
Sin poblacin
10,000
Bibliografa
1.-Bellingen shire council dorrigo flood study final report
(December 2007)
2.-Estimacin de relaciones parmetricas para brechas en
rotura de presas de tipo cfrd VI Congreso Argentino de
Presas y Aprovechamientos Hidroelctricos