Sunteți pe pagina 1din 1

Federal Register / Vol. 73, No.

83 / Tuesday, April 29, 2008 / Notices 23221

where feasible, and planted with native Any structures located within the public inspection. The Draft EA may
vegetation. WGC will implement BMPs floodplain would be designed in also be viewed on the Commission’s
to minimize adverse environmental accordance with the National Flood Web site at http://www.ferc.gov using
impacts during construction of road Insurance Program (NFIP) requirements the ‘‘eLibrary’’ link. Enter the docket
crossings. WGC has prepared and for nonresidential buildings and number (P–1864) excluding the last
submitted a Federal Section 404 structures located in special flood three digits in the docket number field
Authorization permit for water hazard areas. The NFIP regulations to access the document. For assistance,
resources impacts, including wetlands require vulnerable structures to be contact FERC Online Support at
impacts, and a State Section 401 permit constructed above the 100-year flood FERCOnlineSupport@ferc.gov or toll-
under the Clean Water Act issued by elevation or to be watertight. In free at 1–866–208–3676, or for TTY,
USACE and WVDEP, respectively. DOE accordance with 10 CFR part 1022, DOE (202) 502–8659.
estimated that 0.26 acre of wetlands will will ensure through the cooperative Any comments should be filed by
be potentially impacted at the proposed agreement that WGC implements May 27, 2008, and should be addressed
power plant site by service roads, measures to mitigate the adverse to the Secretary, Federal Energy
stockpile areas, and water supply lines. impacts of actions in a floodplain or Regulatory Commission, 888 First
Under one option a cooling water wetlands, including but not limited to, Street, NE., Room 1–A, Washington, DC
intake structure, pump house, and minimum grading requirements, runoff 20426. Please reference the project name
pipeline would be used to withdraw controls, design and construction and project number (P–1864) on all
water from Meadow River. WGC is constraints. Whenever possible, WGC comments. Comments may be filed
currently looking at the best locations will avoid disturbing floodplains and electronically via Internet in lieu of
for these facilities to minimize wetlands and will minimize impacts to paper. The Commission strongly
disturbance of wetlands and the extent practicable, if avoidance is encourages electronic filings. See 18
floodplains. Prior to construction of a not possible. Impacts to floodplains and CFR 385.2001(a)(1)(iii) and the
permanent intake structure WGC must wetlands will be minimized through the instructions on the Commission’s Web
obtain a Section 404 Authorization implementation of engineering design site under the ‘‘eFiling’’ link. For further
permit from the USACE and Section 401 standards and BMPs (as described above information, contact Monica Maynard at
permit from the WVDEP. The Section under Mitigation, these measures are (202) 502–6013.
404 Authorization permit is required as contained in Appendix M (Volume 2) of Kimberly D. Bose,
a result of water resources impacts, the EIS). In addition, WGC will comply Secretary.
including wetlands impacts. The Water with state and Federal wetlands [FR Doc. E8–9298 Filed 4–28–08; 8:45 am]
Quality 401 Certification is required to permits, which may require additional
BILLING CODE 6717–01–P
ensure that the project will not violate mitigation as well as compensatory
the state’s water quality standards or wetland replacement.
stream designated uses. Depending Issued in Washington, DC, on this 23rd day DEPARTMENT OF ENERGY
upon the final plant design and location of April, 2008.
of the water supply line from the sewage James A. Slutz, Federal Energy Regulatory
treatment plant, up to one additional Acting Principal Deputy Assistant Secretary, Commission
acre of wetlands and 120 linear feet Office of Fossil Energy. [RT01–99–000, RT01–99–001, RT01–99–002
‘‘waters of the U.S.’’ could be impacted. [FR Doc. E8–9329 Filed 4–28–08; 8:45 am] and RT01–99–003; RT01–86–000, RT01–86–
WGC is in the process of consulting BILLING CODE 6450–01–P 001 and RT01–86–002; RT01–95–000, RT01–
with the USACE concerning the wetland 95–001 and RT01–95–002; RT01–2–000,
permitting process to identify wetland RT01–2–001, RT01–2–002 and RT01–2–003;
impacts and methods for avoiding and RT01–98–000; RT02–3–000]
DEPARTMENT OF ENERGY
minimizing impacts and developing
suitable forms of wetland mitigation. Federal Energy Regulatory Regional Transmission Organizations;
Bangor Hydro-Electric Company, et al.;
Under all options for the transmission Commission
New York Independent System
line corridor from the proposed WGC
[Project No. 1864–079–MI & WI] Operator, Inc., et al.; PJM
power plant to the Grassy Falls
Interconnection, L.L.C., et al.; PJM
substation, construction activities Upper Peninsula Power Company; Interconnection, L.L.C.; ISO New
would be temporary and localized and Notice of Availability of Environmental England, Inc.; New York Independent
would not result in permanent impacts Assessment System Operator, Inc.; Notice of Filing
to existing 100-year floodplains. Where
the transmission line corridor would April 22, 2008. April 21, 2008.
cross a stream, new power line poles In accordance with the National Take notice that PJM Interconnection,
would be situated at maximum Environmental Policy Act of 1969 and L.L.C., New York Independent System
distances so as to not obstruct flood the Federal Energy Regulatory Operator, Inc. and ISO New England,
flows. Construction and operation of the Commission’s regulations, 18 CFR Part Inc. have posted on their internet Web
transmission line could impact 380 (Order No. 486, 52 FR 47879), the sites information updating their
approximately three acres of wetlands, Office of Energy Projects has reviewed progress on the resolution of RTO
of which 0.38 acres could be the proposed lake level amendment for seams.
permanently impacted as discussed the bond Falls Project, located in the Any person desiring to file comments
above in Biological Resources. Ontonagon River Basin in Ontonagon on this information should file with the
No floodplain or wetland impacts are and Gogebic Counties, Michigan and Federal Energy Regulatory Commission,
sroberts on PROD1PC70 with NOTICES

expected as a result of the fuel recovery Vilas County, Wisconsin, and has 888 First Street, NE., Washington, DC
efforts that would occur at the Anjean, prepared a Draft Environmental 20426, in accordance with Rules 211
Donegan, Green Valley, and Joe Knob Assessment (Draft EA). and 214 of the Commission’s Rules of
coal refuse sites to be used for fuel A copy of the Draft EA is on file with Practice and Procedure (18 CFR 385.211
supply to the project. the Commission and is available for and 385.214). All such comments