Sunteți pe pagina 1din 5

Federal Register / Vol. 73, No.

78 / Tuesday, April 22, 2008 / Rules and Regulations 21779

■ a. Revising the date of the provision; ADDRESSES: Submit comments and 53 and, where appropriate,
and identified by FAC 2005–25, FAR case replacing them with eSRS.
■ b. In paragraph (j), by removing the 2005–040, by any of the following • Incorporating general instructions
word ‘‘parent’’; removing ‘‘http:// methods: from Standard Forms 294 and 295 into
www.dnb.com’’ and adding ‘‘http:// • Regulations.gov: http:// the clause at FAR 52.219–9. The
fedgov.dnb.com/webform’’ in its place; www.regulations.gov.Submit comments language in FAR 52.219–9 differs from
and adding a sentence to the end of the via the Federal eRulemaking portal by the SF 295 general instruction for
paragraph to read as follows: inputting ‘‘FAR Case 2005–040’’ under submitting summary subcontract reports
the heading ‘‘Comment or Submission’’. on contracts awarded by the National
52.212–1 Instructions to Offerors— Select the link ‘‘Send a Comment or Aeronautics and Space Administration
Commercial Items.
Submission’’ that corresponds with FAR (NASA) in that the clause requires that
* * * * * Case 2005–040. Follow the instructions the reports be submitted semiannually,
INSTRUCTIONS TO OFFERORS— provided to complete the ‘‘Public rather than annually. This change
COMMERCIAL ITEMS (APR 2008) Comment and Submission Form’’. reflects what NASA currently requires
* * * * * Please include your name, company under its own regulations and does not
(j) * * * The offeror should indicate that name (if any), and ‘‘FAR Case 2005– impose a new burden on contractors.
it is an offeror for a Government contract 040’’ on your attached document. • Adding a requirement that a
when contacting the local Dun and Bradstreet • Fax: 202–501–4067. contractor provide its prime contract
office. • Mail: General Services number and DUNS number to its
* * * * * Administration, Regulatory Secretariat subcontractors with subcontracting
(End of provision) (VPR), 1800 F Street, NW, Room 4035, plans and require that each of its
[FR Doc. E8–8447 Filed 4–21–08; 8:45 am] ATTN: Diedra Wingate, Washington, DC subcontractors with a subcontracting
BILLING CODE 6820–EP–S 20405. plan provide the prime contract number
Instructions: Please submit comments and its own DUNS number to its
only and cite FAC 2005–25, FAR case subcontractors with subcontracting
DEPARTMENT OF DEFENSE 2005–040, in all correspondence related plans. This is necessary in order for the
to this case. All comments received will Government to have insight into all of
GENERAL SERVICES be posted without change to http:// the subcontracting done under a prime
ADMINISTRATION www.regulations.gov, including any contract. Access to this information will
personal and/or business confidential enable the Government to more
NATIONAL AERONAUTICS AND information provided. effectively manage the small business
SPACE ADMINISTRATION FOR FURTHER INFORMATION CONTACT: Ms. subcontracting program.
Rhonda Cundiff, Procurement Analyst, • Identifying what individuals/
48 CFR Parts 1, 4, 19, 52, and 53 at (202) 501–0044 for clarification of entities are responsible for
[FAC 2005–25; FAR Case 2005–040; Item content. Please cite FAC 2005–25, FAR acknowledging that a report has been
II; Docket 2008–0001, Sequence 01] case 2005–040. For information received or rejecting the report if it has
pertaining to status or publication not been adequately completed.
RIN 9000–AK95
schedules, contact the FAR Secretariat • Revising FAR 52.219–9 to reflect
Federal Acquisition Regulation; FAR at (202) 501–4755. use of the Year-End Supplementary
Case 2005–040, Electronic SUPPLEMENTARY INFORMATION: Report for Small Disadvantaged
Subcontracting Reporting System Businesses in eSRS to provide the
A. Background information, already required by the
(eSRS)
This interim rule amends the Federal clause, on subcontract awards to Small
AGENCIES: Department of Defense (DoD), Acquisition Regulation to require that Disadvantaged Businesses. Currently,
General Services Administration (GSA), small business subcontract reports be the clause requires that the information
and National Aeronautics and Space submitted using the Electronic be submitted along with the year-end
Administration (NASA). Subcontracting Reporting System Summary Subcontract Report. The
ACTION: Interim rule with request for (eSRS), rather than Standard Form 294 interim rule provides for a 90-day
comments. - Subcontract Report for Individual extension beyond the date when the
Contracts and Standard Form 295 - year-end Summary Subcontract Report
SUMMARY: The Civilian Agency Summary Subcontract Report. The eSRS is submitted.
Acquisition Council and the Defense is a web-based system managed by the • Revising FAR 52.219–25 to allow
Acquisition Regulations Council Integrated Acquisition Environment. the report currently required by that
(Councils) have agreed on an interim The eSRS is intended to streamline the clause to be submitted using the Small
rule amending the Federal Acquisition small business subcontracting program Disadvantaged Business Participation
Regulation (FAR) to require that small reporting process and provide the data Report in eSRS, or continuing to use
business subcontract reports be to agencies in a manner that will enable either the Optional Form 312 or the
submitted using the Electronic them to more effectively manage the contractor’s format.
Subcontracting Reporting System program. 2. Makes revisions to clarify that—
(eSRS), rather than Standard Form (SF) This rule implements in the FAR the • A contractor should have only one
294 - Subcontract Report for Individual use of eSRS to fulfill small business commercial plan in place at a time.
Contracts and Standard Form 295 - subcontracting reporting requirements. • A contract may have only one
Summary Subcontract Report. It further amends FAR 19.7 and related subcontracting plan. When a
mstockstill on PROD1PC66 with RULES3

DATES: Effective Date: April 22, 2008. clauses to clarify existing small business modification is issued that would
Comment Date: Interested parties subcontracting program requirements. require a subcontracting plan, if the
should submit written comments to the The interim rule: contract already has a subcontracting
FAR Secretariat on or before June 23, 1. Implements the use of eSRS by— plan, that plan should be revised to
2008 to be considered in the • Deleting references to Standard incorporate the goals associated with
formulation of a final rule. Forms 294 and 295 from Parts 1, 19, 52, the modification. A separate

VerDate Aug<31>2005 16:41 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00009 Fmt 4701 Sfmt 4700 E:\FR\FM\22APR3.SGM 22APR3
21780 Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Rules and Regulations

subcontracting plan should not be requirements that only apply to other and will have practical utility; whether
submitted. than small businesses. our estimate of the public burden of this
• The goals in a subcontracting plan Therefore, an Initial Regulatory collection of information is accurate,
should be updated when options are Flexibility Analysis has not been and based on valid assumptions and
exercised. performed. The Councils will consider methodology; ways to enhance the
• Subcontracting plans are not comments from small entities quality, utility, and clarity of the
required for subcontractors when the concerning the affected FAR Parts 1, 4, information to be collected; and ways in
prime contract contains the clause at 19, 52, and 53 in accordance with 5 which we can minimize the burden of
FAR 52.212–5 or the subcontractor U.S.C. 610. Interested parties must the collection of information on those
provides a commercial item subject to submit such comments separately and who are to respond, through the use of
the clause at FAR 52.244–6. should cite 5 U.S.C 601, et seq. (FAC appropriate technological collection
3. Makes these editorial changes— 2005–25, FAR case 2005–040), in
techniques or other forms of information
• Replaces references to PRO-Net correspondence.
technology.
with Central Contractor Registration C. Paperwork Reduction Act
(CCR) since PRO-Net is an obsolete Requester may obtain a copy of the
system and the former PRO-Net The Paperwork Reduction Act (Pub. justification from the General Services
functionality being referenced is L. 104–13) applies because the interim Administration, FAR Secretariat (VPR),
incorporated in CCR. rule contains information collection Room 4035, Washington, DC 20405,
• Replaces the acronym ‘‘ISR’’ in requirements. The information telephone (202) 501–4755. Please cite
Subpart 4.4 with Industrial Security collection requirement subsumes the OMB Control No. 9000–0006,
Regulation so that ‘‘ISR’’ will only be approved information collection for Subcontracting Plans/Subcontracting
used in the FAR to mean Individual semi-annual summary subcontract Reporting for Individual Contracts, and/
Subcontract Report. reports on contracts awarded by NASA. or OMB Control Number 9000–0007,
The Councils request specific Accordingly, the FAR Secretariat will Summary Subcontract Report, in all
comment on what period the year-end forward a request for approval of the correspondence.
Summary Subcontract Report should revised information collection
requirement concerning OMB Control E. Determination to Issue an Interim
cover. The interim rule retains the
current FAR requirement (reflected in No. 9000–0006, Subcontracting Plans/ Rule
SF 295) that the report cover Subcontracting Reporting for Individual
Contracts, and OMB Control Number A determination has been made under
subcontracting done during the the authority of the Secretary of Defense
Government’s fiscal year. However, the 9000–0007, Summary Subcontract
Report, to the Office of Management and (DoD), the Administrator of General
eSRS, which is currently being used by Services (GSA), and the Administrator
some agencies, indicates that the year- Budget under 44 U.S.C. 3501, et seq.
Public comments concerning this of the National Aeronautics and Space
end Summary Subcontract Report for a
request will be invited through this Administration (NASA) that urgent and
commercial subcontracting plan should
notice. compelling reasons exist to promulgate
reflect subcontracting performed during
Annual Reporting Burden: this interim rule without prior
the contractor’s fiscal year. Therefore,
The annual reporting burden for OMB opportunity for public comment. This
some contractors who are using eSRS
No. 9000–0006 is estimated as follows: action is necessary because the
and have commercial plans may be
Respondents: 103,908 Electronic Subcontracting Reporting
reporting subcontracts awarded during Responses per respondent: 3
their own fiscal year, whereas other System has already replaced the SFs 294
Total annual responses: 311,724 and 295 as the mechanism for
contractors are reporting subcontracts Preparation hours per response: 11.90
awarded during the Government’s fiscal submitting small business
Total response burden hours:
year. The Councils request comment on 3,709,515; and subcontracting data. This rule updates
what period the year-end Summary The annual reporting burden for OMB the FAR to show the current usage of
Subcontract Report should cover, the No. 9000–0007 is estimated as follows: the eSRS. However, pursuant to Pub. L.
Government’s fiscal year or the Respondents: 103,908 98–577 and FAR 1.501, the Councils
contractor’s fiscal year, with a rationale Responses per respondent: 1 will consider public comments received
for the period recommended. In Total annual responses: 103,908 in response to this interim rule in the
addition, the councils may consider Preparation hours per response: 12.4 formation of the final rule.
adding further coverage in the FAR to Total response burden hours:
mirror the instructions that are currently 1,288,459. List of Subjects in 48 CFR Parts 1, 4, 19,
in SFs 294 and 295. 52, and 53
This is not a significant regulatory D. Request for Comments Regarding
Paperwork Burden Government procurement.
action and, therefore, was not subject to
review under Section 6(b) of Executive Submit comments, including Dated: April 4, 2008.
Order 12866, Regulatory Planning and suggestions for reducing this burden, Al Matera,
Review, dated September 30, 1993. This not later than June 23, 2008 to: FAR Director, Office of Acquisition Policy.
rule is not a major rule under 5 U.S.C. Desk Officer, OMB, Room 10102, NEOB,
804. Washington, DC 20503, and a copy to ■ Therefore, DoD, GSA, and NASA
the General Services Administration, amend 48 CFR parts 1, 4, 19, 52, and 53
B. Regulatory Flexibility Act as set forth below:
FAR Secretariat (VPR), 1800 F Street,
mstockstill on PROD1PC66 with RULES3

The interim rule is not expected to NW, Room 4035, Washington, DC ■ 1. The authority citation for 48 CFR
have a significant economic impact on 20405. parts 1, 4, 19, 52, and 53 continues to
a substantial number of small entities Public comments are particularly read as follows:
within the meaning of the Regulatory invited on: whether this collection of
Flexibility Act, 5 U.S.C. 601, et seq., information is necessary for the proper Authority: 40 U.S.C. 121(c); 10 U.S.C.
because it concerns reporting performance of functions of the FAR, chapter 137; and 42 U.S.C. 2473(c).

VerDate Aug<31>2005 16:41 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00010 Fmt 4701 Sfmt 4700 E:\FR\FM\22APR3.SGM 22APR3
Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Rules and Regulations 21781

PART 1—FEDERAL ACQUISITION submit the ISR and/or the SSR using the the criteria in 19.702 for a plan, or an
REGULATIONS SYSTEM eSRS; option is exercised, the goals associated
(v) Provide its prime contract number with the modification or option shall be
1.106 [Amended] and its DUNS number and the e-mail added to those in the existing
■ 2. Amend section 1.106 by removing address of the Government or Contractor subcontract plan.
from FAR Segment19.7 OMB Control official responsible for acknowledging ■ 8. Amend section 19.705–6 by adding
Number ‘‘9000–0006’’, and adding or rejecting the reports, to all first-tier paragraph (h) to read as follows.
‘‘9000–0006 and 9000–0007’’ in its subcontractors with subcontracting
place; removing from FAR Segment plans so they can enter this information 19.705–6 Postaward responsibilities of the
52.219–9 OMB Control Number ‘‘9000– into the eSRS when submitting their contracting officer.
0006’’, and adding ‘‘9000–0006 and reports; and * * * * *
9000–0007’’ in its place; and removing (vi) Require that each subcontractor (h) Acknowledging receipt of or
FAR Segments ‘‘SF 294’’ with OMB with a subcontracting plan provide the rejecting the ISR and the SSR in the
Control Number ‘‘9000–0006’’, and ‘‘SF prime contract number and its own eSRS. Acknowledging receipt does not
295’’ with OMB Control Number ‘‘9000– DUNS number, and the e-mail address mean acceptance or approval of the
0007’’. of the Government or Contractor official report. The report shall be rejected if it
responsible for acknowledging or is not adequately completed. Failure to
PART 4—ADMINISTRATIVE MATTERS rejecting the reports, to its meet the goals of the subcontracting
subcontractors with subcontracting plan is not a valid reason for rejecting
4.402 [Amended]
plans. the report.
■ 3. Amend section 4.402 in paragraph
* * * * *
(b)(2) by removing ‘‘(ISR)’’. (d) A commercial plan (as defined in 19.705–7 [Amended]
4.403 [Amended] 19.701) is the preferred type of ■ 9. Amend section 19.705–7 in
■ 4. Amend section 4.403 in paragraph subcontracting plan for contractors paragraph (d) last sentence by removing
(c)(1) by removing ‘‘ISR’’ and adding furnishing commercial items. Once a ‘‘a failure to submit Standard Form (SF)
‘‘Industrial Security Regulation’’ in its contractor’s commercial plan has been 294, Subcontracting Report for
place. approved, the Government shall not Individual Contracts, or SF 295,
require another subcontracting plan Summary Subcontract Report, in
PART 19—SMALL BUSINESS from the same contractor while the plan accordance with the instructions on the
PROGRAMS remains in effect, as long as the product forms or as provided in agency
or service being provided by the regulations;’’ and adding ‘‘a failure to
■ 5. Amend section 19.701 by adding, in contractor continues to meet the
alphabetical order, the definition submit the ISR, or the SSR, using the
definition of a commercial item. The eSRS, or as provided in agency
‘‘Electronic Subcontracting Reporting contractor shall—
System (eSRS)’’ to read as follows: regulations;’’ in its place.
* * * * *
19.701 Definitions. (2) Submit a new commercial plan, 30 PART 52—SOLICITATION PROVISIONS
* * * * * working days before the end of the AND CONTRACT CLAUSES
‘‘Electronic Subcontracting Reporting Contractor’s fiscal year, to the
contracting officer responsible for the ■ 10. Amend section 52.212–5 by
System (eSRS)’’ means the
uncompleted Government contract with revising the date of the clause, and
Governmentwide, electronic, web-based
the latest completion date. The paragraphs (b)(8)(i) and (b)(12) to read
system for small business
contractor must provide to each as follows:
subcontracting program reporting.
* * * * * contracting officer responsible for an 52.212–5 Contract Terms and Conditions
■ 6. Amend section 19.704 by— ongoing contract subject to the plan, the Required to Implement Statutes or
■ a. Revising paragraphs (a)(10)(iii) and identity of the contracting officer that Executive Orders—Commercial Items.
(a)(10)(iv); will be negotiating the new plan; * * * * *
■ b. Adding paragraphs (a)(10)(v) and (3) When the new commercial plan is CONTRACT TERMS AND CONDITIONS
(a)(10)(vi); approved, provide a copy of the REQUIRED TO IMPLEMENT STATUTES OR
■ c. Revising paragraphs (d) approved plan to each contracting EXECUTIVE ORDERS—COMMERCIAL
introductory text and (d)(2); officer responsible for an ongoing ITEMS (APR 2008)
■ d. Amending paragraph (d)(1) by contract that is subject to the plan; and * * * * *
removing ‘‘; and’’ and adding ‘‘;’’ in its (4) Comply with the reporting (b) * * *
place; and requirements stated in paragraph (a)(10) ll (8)(i) 52.219–9, Small Business
■ e. Adding paragraphs (d)(3) and (d)(4). of this section by submitting one SSR in Subcontracting Plan (APR 2008) (15 U.S.C.
■ The revised and added text reads as eSRS, for all contracts covered by its 637(d)(4).
follows: commercial plan. This report will be * * * * *
acknowledged or rejected in eSRS by ll (12) 52.219–25, Small Disadvantaged
19.704 Subcontracting plan requirements. the contracting officer who approved Business Participation Program—
(a) * * * the plan. The report shall be submitted Disadvantaged Status and Reporting (APR
(10) * * * within 30 days after the end of the 2008) (Pub. L. 103–355, section 7102, and 10
(iii) Submit the Individual Government’s fiscal year. U.S.C. 2323).
Subcontract Report (ISR), and the ■ 7. Amend section 19.705–2 by adding * * * * *
Summary Subcontract Report (SSR) paragraph (e) to read as follows. ■ 11. Amend section 52.219–9 by—
mstockstill on PROD1PC66 with RULES3

using the Electronic Subcontracting


■ a. Revising the date of the clause;
Reporting System (eSRS) (http:// 19.705–2 Determining the need for a
www.esrs.gov), following the subcontracting plan. ■ b. Adding in paragraph (b) the
instructions in the eSRS; * * * * * definition ‘‘Electronic Subcontracting
(iv) Ensure that its subcontractors (e) A contract may have no more than Reporting System’’;
with subcontracting plans agree to one plan. When a modification meets ■ c. Revising paragraph (d)(5);

VerDate Aug<31>2005 16:41 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00011 Fmt 4701 Sfmt 4700 E:\FR\FM\22APR3.SGM 22APR3
21782 Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Rules and Regulations

■ d. Amending paragraph (d)(9) by in accordance with this clause, or as or small disadvantaged business credit from
adding ‘‘with further subcontracting provided in agency regulations; an ANC or Indian tribe.
possibilities’’ after ‘‘facility’’); (iv) Ensure that its subcontractors with (1) ISR. This report is not required for
subcontracting plans agree to submit the ISR commercial plans. The report is required for
■ e. Revising paragraphs (d)(10)(iii) and
and/or the SSR using eSRS; each contract containing an individual
(d)(10)(iv); (v) Provide its prime contract number, its subcontract plan and shall be submitted to
■ f. Adding paragraphs (d)(10)(v) and DUNS number, and the e-mail address of the the Administrative Contracting Officer (ACO)
(d)(10)(vi); Government or Contractor official or Contracting Officer, if no ACO is assigned.
■ g. Amending paragraph (d)(11)(i) by responsible for acknowledging or rejecting (i) The report shall be submitted semi-
removing ‘‘PRO-Net’’ and adding ‘‘CCR’’ the reports, to all first-tier subcontractors annually during contract performance for the
in its place; with subcontracting plans so they can enter periods ending March 31 and September 30.
■ h. Revising paragraph (g); and this information into the eSRS when A report is also required for each contract
■ i. Redesignating paragraphs (i) and (j) submitting their reports; and within 30 days of contract completion.
(vi) Require that each subcontractor with a Reports are due 30 days after the close of
as paragraphs (k) and (l), adding new each reporting period, unless otherwise
subcontracting plan provide the prime
paragraphs (i) and (j), and revising the contract number, its own DUNS number, and directed by the Contracting Officer. Reports
newly designated paragraph (l). the e-mail address of the Government or are required when due, regardless of whether
■ The revised and added text reads as Contractor official responsible for there has been any subcontracting activity
follows: acknowledging or rejecting the reports, to its since the inception of the contract or the
subcontractors with subcontracting plans. previous reporting period.
52.219–9 Small Business Subcontracting (ii) When a subcontracting plan contains
Plan. * * * * * separate goals for the basic contract and each
(g) A commercial plan is the preferred type option, as prescribed by FAR 19.704(c), the
* * * * * of subcontracting plan for contractors
SMALL BUSINESS SUBCONTRACTING dollar goal inserted on this report shall be the
furnishing commercial items. The sum of the base period through the current
PLAN (APR 2008) commercial plan shall relate to the offeror’s option; for example, for a report submitted
* * * * * planned subcontracting generally, for both after the second option is exercised, the
(b) * * * commercial and Government business, rather dollar goal would be the sum of the goals for
Electronic Subcontracting Reporting than solely to the Government contract. Once the basic contract, the first option, and the
System (eSRS) means the Governmentwide, the Contractor’s commercial plan has been second option.
electronic, web-based system for small approved, the Government will not require (iii) The authority to acknowledge receipt
business subcontracting program reporting. another subcontracting plan from the same or reject the ISR resides—
The eSRS is located at http://www.esrs.gov. Contractor while the plan remains in effect, (A) In the case of the prime Contractor,
* * * * * as long as the product or service being with the Contracting Officer; and
(d) * * * provided by the Contractor continues to meet (B) In the case of a subcontract with a
(5) A description of the method used to the definition of a commercial item. A subcontracting plan, with the entity that
identify potential sources for solicitation Contractor with a commercial plan shall awarded the subcontract.
purposes (e.g., existing company source lists, comply with the reporting requirements (2) SSR.
the Central Contractor Registration database stated in paragraph (d)(10) of this clause by (i) Reports submitted under individual
(CCR), veterans service organizations, the submitting one SSR in eSRS for all contracts contract plans—
National Minority Purchasing Council covered by its commercial plan. This report (A) This report encompasses all
Vendor Information Service, the Research shall be acknowledged or rejected in eSRS by subcontracting under prime contracts and
and Information Division of the Minority the Contracting Officer who approved the subcontracts with the awarding agency,
Business Development Agency in the plan. This report shall be submitted within regardless of the dollar value of the
Department of Commerce, or small, 30 days after the end of the Government’s subcontracts.
HUBZone, small disadvantaged, and women- fiscal year. (B) The report may be submitted on a
owned small business trade associations). A * * * * * corporate, company or subdivision (e.g. plant
firm may rely on the information contained (i) A contract may have no more than one or division operating as a separate profit
in CCR as an accurate representation of a plan. When a modification meets the criteria center) basis, unless otherwise directed by
concern’s size and ownership characteristics in 19.702 for a plan, or an option is the agency.
for the purposes of maintaining a small, exercised, the goals associated with the (C) If a prime Contractor and/or
veteran-owned small, service-disabled modification or option shall be added to subcontractor is performing work for more
veteran-owned small, HUBZone small, small those in the existing subcontract plan. than one executive agency, a separate report
disadvantaged, and women-owned small (j) Subcontracting plans are not required shall be submitted to each executive agency
business source list. Use of CCR as its source from subcontractors when the prime contract covering only that agency’s contracts,
list does not relieve a firm of its contains the clause at 52.212–5, Contract provided at least one of that agency’s
contracts is over $550,000 (over $1,000,000
responsibilities (e.g., outreach, assistance, Terms and Conditions Required to
for construction of a public facility) and
counseling, or publicizing subcontracting Implement Statutes or Executive Orders—
contains a subcontracting plan. For DoD, a
opportunities) in this clause. Commercial Items, or when the subcontractor
consolidated report shall be submitted for all
* * * * * provides a commercial item subject to the
contracts awarded by military departments/
(10) * * * clause at 52.244–6, Subcontracts for
agencies and/or subcontracts awarded by
(iii) Submit the Individual Subcontract Commercial Items, under a prime contract.
DoD prime Contractors. However, for
Report (ISR) and/or the Summary * * * * * construction and related maintenance and
Subcontract Report (SSR), in accordance with (l) The Contractor shall submit ISRs and repair, a separate report shall be submitted
paragraph (l) of this clause using the SSRs using the web-based eSRS at http:// for each DoD component.
Electronic Subcontracting Reporting System www.esrs.gov. Purchases from a corporation, (D) For DoD and NASA, the report shall be
(eSRS) at http://www.esrs.gov. The reports company, or subdivision that is an affiliate of submitted semi-annually for the six months
shall provide information on subcontract the prime Contractor or subcontractor are not ending March 31 and the twelve months
awards to small business concerns, veteran- included in these reports. Subcontract award ending September 30. For civilian agencies,
owned small business concerns, service- data reported by prime Contractors and except NASA, it shall be submitted annually
mstockstill on PROD1PC66 with RULES3

disabled veteran-owned small business subcontractors shall be limited to awards for the twelve month period ending
concerns, HUBZone small business concerns, made to their immediate next-tier September 30. Reports are due 30 days after
small disadvantaged business concerns, subcontractors. Credit cannot be taken for the close of each reporting period.
women-owned small business concerns, and awards made to lower tier subcontractors, (E) Subcontract awards that are related to
Historically Black Colleges and Universities unless the Contractor or subcontractor has work for more than one executive agency
and Minority Institutions. Reporting shall be been designated to receive a small business shall be appropriately allocated.

VerDate Aug<31>2005 16:41 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00012 Fmt 4701 Sfmt 4700 E:\FR\FM\22APR3.SGM 22APR3
Federal Register / Vol. 73, No. 78 / Tuesday, April 22, 2008 / Rules and Regulations 21783

(F) The authority to acknowledge or reject Small Disadvantaged Business Participation of the Department of Commerce
SSRs in eSRS, including SSRs submitted by Report, in the Contractor’s own format outlined in 15 CFR Part 700.
subcontractors with subcontracting plans, providing the same information, or
DATES: Effective Date: April 22, 2008.
resides with the Government agency accomplished through using the Electronic
awarding the prime contracts. Subcontracting Reporting System’s Small FOR FURTHER INFORMATION CONTACT: Ms.
(ii) Reports submitted under a commercial Disadvantaged Business Participation Report. Cecelia L. Davis, Procurement Analyst,
plan— This report is required for each contract at (202) 219–0202 for clarification of
(A) The report shall include all subcontract containing SDB participation targets. If this content. For information pertaining to
awards under the commercial plan in effect contract contains an individual Small status or publication schedules, contact
during the Government’s fiscal year. Business Subcontracting Plan, reports shall the FAR Secretariat at (202) 501–4755.
(B) The report shall be submitted annually, be submitted with the final Individual Please cite FAC 2005–25, FAR case
within thirty days after the end of the Subcontract Report at the completion of the 2006–033.
Government’s fiscal year. contract.
(C) If a Contractor has a commercial plan SUPPLEMENTARY INFORMATION:
(End of clause)
and is performing work for more than one A. Background
executive agency, the Contractor shall specify PART 53—FORMS
the percentage of dollars attributable to each Under Title I of the Defense
agency from which contracts for commercial ■ 13. Revise section 53.219 to read as Production Act (50 U.S.C. App. 2061, et
items were received. follows. seq.), the President is authorized to
(D) The authority to acknowledge or reject require preferential acceptance and
SSRs for commercial plans resides with the 53.219 Small business programs. performance of contracts or orders
Contracting Officer who approved the The following form may be used in supporting certain approved national
commercial plan. reporting small disadvantaged business defense and energy programs, and to
(iii) All reports submitted at the close of contracting data: OF 312 (10/00), Small allocate materials, services, and
each fiscal year (both individual and Disadvantaged Business Participation
commercial plans) shall include a Year-End
facilities in such a manner to promote
Supplementary Report for Small
Report. (See Subpart 19.12.) these approved programs. Additional
Disadvantaged Businesses. The report shall priorities authority is found in section
53.301–294 and 53.301–295 [Removed]
include subcontract awards, in whole dollars, 18 of the Selective Service Act of 1948
to small disadvantaged business concerns by ■ 14. Remove sections 53.301–294 and (50 U.S.C. App. 468), 10 U.S.C. 2538,
North American Industry Classification 53.301–295. and 50 U.S.C. 82.
System (NAICS) Industry Subsector. If the [FR Doc. E8–8449 Filed 4–21–08; 8:45 am] The President delegated the priorities
data are not available when the year-end SSR BILLING CODE 6820–EP–S and allocations authorities of the
is submitted, the prime Contractor and/or Defense Production Act in E.O. 12919,
subcontractor shall submit the Year-End as amended. The President has
Supplementary Report for Small DEPARTMENT OF DEFENSE delegated the authority to approve a
Disadvantaged Businesses within 90 days of
submitting the year-end SSR. For a program for priorities and allocations
GENERAL SERVICES support to the Secretaries of Defense,
commercial plan, the Contractor may obtain
ADMINISTRATION Energy, and Homeland Security. As part
from each of its subcontractors a
predominant NAICS Industry Subsector and of that delegation, the President
report all awards to that subcontractor under NATIONAL AERONAUTICS AND designated the Secretary of Commerce
its predominant NAICS Industry Subsector. SPACE ADMINISTRATION to administer the Defense Priorities and
(End of clause) Allocations System (DPAS). The
■ 12. Amend section 52.219–25 by— 48 CFR Parts 2, 11, 18, 52 and 53 Defense Production Act authority has
■ a. Revising the date of the clause; and also been extended to support
■ b. Revising paragraphs (a) last [FAC 2005–25; FAR Case 2006–033; Item
III; Docket 2008–0001; Sequence 7]
emergency preparedness activities
sentence and (b); under Title VI of the Robert T. Stafford
■ The revised and added text reads as RIN 9000–AK93 Disaster Relief and Emergency
follows: Assistance Act, as amended (42 U.S.C.
Federal Acquisition Regulation; FAR 5195, et seq.), and critical infrastructure
52.219–25 Small Disadvantaged Business
Participation Program—Disadvantaged
Case 2006–033, Revisions to the protection and restoration.
Status and Reporting. Defense Priorities and Allocations The FAR is revised as follows:
System (DPAS) • Subpart 2.101 revised the definition
* * * * * of ‘‘national defense’’ to include a
SMALL DISADVANTAGED BUSINESS AGENCIES: Department of Defense (DoD), reference to the DPAS definition, which
PARTICIPATION PROGRAM— General Services Administration (GSA),
DISADVANTAGED STATUS AND includes critical infrastructure
and National Aeronautics and Space protection and restoration.
REPORTING (APR 2008)
(a) * * * The Contractor shall confirm that
Administration (NASA). • Subpart 11.6, Priorities and
a joint venture partner, team member, or ACTION: Final rule. Allocations, is revised to reflect the
subcontractor representing itself as a small President’s delegation of the Defense
disadvantaged business concern is a small SUMMARY: The Civilian Agency Production Act’s priorities and
disadvantaged business concern certified by Acquisition Council and the Defense allocations authorities in Executive
the Small Business Administration by using Acquisition Regulations Council Order 12919, and the current provisions
the Central Contractor Registration database (Councils) have agreed on a final rule of the DPAS regulations of the
or by contacting the SBA’s Office of Small amending the Federal Acquisition Department of Commerce (see 15 CFR
Disadvantaged Business Certification and Regulation (FAR) to reflect the
Eligibility. Part 700).
mstockstill on PROD1PC66 with RULES3

(b) Reporting requirement. If this contract


President’s delegation of the Defense • Parts 18 and 52 are revised to
contains SDB participation targets, the
Production Act’s priorities and include the emergency acquisition text.
Contractor shall report on the participation of allocations authorities in Executive • Subpart 53.3 is revised to add
SDB concerns at contract completion, or as Order 12919, and to reflect the current changes to Standard Form 26 and 1447.
otherwise provided in this contract. provisions of the Defense Priorities and The Councils are publishing this rule
Reporting may be on Optional Form 312, Allocations System (DPAS) regulations as a final rule without comment under

VerDate Aug<31>2005 16:41 Apr 21, 2008 Jkt 214001 PO 00000 Frm 00013 Fmt 4701 Sfmt 4700 E:\FR\FM\22APR3.SGM 22APR3

S-ar putea să vă placă și