Sunteți pe pagina 1din 1

Federal Register / Vol. 73, No.

72 / Monday, April 14, 2008 / Notices 20049

Estimated Time per Response: 2 to 4 requirements for this collection have not broadcasting in analog. The Commission
hours. changed since we received approval. wants to ensure that no consumers are
Total Annual Burden: 10,513 hours. OMB Control Number: 3060–0029. left behind in the DTV transition.
Total Annual Cost: $51,350,347. Title: Application for TV Broadcast Specifically, the Report and Order
Obligation to Respond: Required to Station License, FCC Form 302 TV; requires Noncommercial Educational
obtain or retain benefits. The statutory Application for DTV Broadcast Station (‘‘NCE’’) television stations to use
authority is contained in Sections License, FCC Form 302–DTV; revised FCC Form 340 to obtain the
154(i), 303 and 308 of the Application for Construction Permit for necessary Commission approvals (i.e.,
Communications Act of 1934, as Reserved Channel Noncommercial construction permits and licenses) in
amended. Educational Broadcast Station, FCC time to build their post-transition
Confidentiality: No need for Form 340; Application for Authority to facility.
confidentiality required. Construct or Make Changes in an FM • Applications for post-transition
Privacy Impact Assessment: No Translator or FM Booster Station, FCC facilities. NCE television stations
impact(s). Form 349. without a construction permit for their
Needs and Uses: Congress has Form Number(s): FCC Form 302–TV; final, post-transition (DTV) facility must
mandated that after February 17, 2009, FCC Form 302–DTV; FCC Form 340; file an application to construct or
full-power television broadcast stations FCC Form 349. modify that facility using FCC Forms
must transmit only in digital signals, Type of Review: Extension of a 340.
and may no longer transmit analog currently approved collection. • Requests to transition early to post-
signals. On December 22, 2007, the Respondents: Business or other for- transition channel. NCE television
Commission adopted a Report and profit entities; Not-for-profit stations may request authority to
Order in the matter of the Third Periodic institutions; State, local or tribal transition early to their post-transition
Review of the Commission’s Rules and government. channel using FCC Form 340.
Number of Respondents/Responses:
Policies Affecting the Conversion to
4,325. • Revisions to FCC Form 340. FCC
Digital Television, MB Docket No. 07– Form 340 was revised to accommodate
Frequency of Response: On occasion
91, FCC 07–228, to establish the rules, the filing of post-transition applications.
reporting requirement; Recordkeeping
policies and procedures necessary to In addition, the Report and Order
requirement; One time reporting
complete the nation’s transition to DTV. requires that stations that have applied
requirement; Third party disclosure
With the DTV transition deadline less to construct or modify post-transition
requirement.
than 14 months away, the Commission Estimated Time per Response: 1 to 4 facilities must use the Form 302–DTV to
must ensure that broadcasters meet their hours. obtain a new or modified station license
statutory responsibilities and complete Total Annual Burden: 12,150 hours. to cover those post-transition facilities.
construction of, and begin operations Total Annual Costs: $21,091,625. The FCC received approval under the
on, the facility on their final, post- Obligation to Respond: Required to ‘‘emergency processing provisions’’ of
transition (digital) channel that will obtain or retain benefits. Statutory the PRA on January 7, 2008. The
reach viewers in their authorized authority for this collection of requirements for this collection have not
service areas by the statutory transition information is contained in Sections changed since we received approval.
deadline, when they must cease 154(i), 303 and 308 of the Federal Communications Commission.
broadcasting in analog. The Commission Communications Act of 1934, as
wants to ensure that no consumers are Marlene H. Dortch,
amended.
left behind in the DTV transition. Secretary.
Confidentiality: No need for
Specifically, the Report and Order confidentiality required. [FR Doc. E8–7884 Filed 4–11–08; 8:45 am]
requires full-power commercial Privacy Impact Assessment: No BILLING CODE 6712–01–P
television stations to use revised FCC impact(s).
Form 301 to obtain the necessary Needs and Uses: Congress has
Commission approvals (i.e., mandated that after February 17, 2009, FEDERAL COMMUNICATIONS
construction permits and licenses) in full-power television broadcast stations COMMISSION
time to build their post-transition must transmit only in digital signals,
facility. Sunshine Act Meeting Scheduled for
and may no longer transmit analog
Thursday, April 10, 2008, Cancelled
• Applications for post-transition signals. On December 22, 2007, the
facilities. Full-power commercial Commission adopted a Report and April 10, 2008.
television stations without a Order in the matter of the Third Periodic The Federal Communications
construction permit for their final, post- Review of the Commission’s Rules and Commission has cancelled the Open
transition (DTV) facility must file an Policies Affecting the Conversion to Meeting on the subjects previously
application to construct or modify that Digital Television, MB Docket No. 07– scheduled for Thursday, April 10, 2008,
facility using FCC Forms 301. 91, FCC 07–228, to establish the rules, at 445 12th Street, SW., Washington,
• Requests to transition early to post- policies and procedures necessary to DC.
transition channel. Full-power complete the nation’s transition to DTV. Additional information concerning
commercial television stations may With the DTV transition deadline less this meeting may be obtained from
request authority to transition early to than 14 months away, the Commission Audrey Spivack or David Fiske, Office
their post-transition channel using FCC must ensure that broadcasters meet their of Media Relations, (202) 418–0500;
Forms 301. statutory responsibilities and complete TTY 1–888–835–5322.
• Revisions to FCC Form 301. FCC construction of, and begin operations
jlentini on PROD1PC65 with NOTICES

Form 301 was revised to accommodate on, the facility on their final, post- Federal Communications Commission.
the filing of post-transition applications. transition (digital) channel that will Marlene H. Dortch,
The FCC received approval under the reach viewers in their authorized Secretary.
‘‘emergency processing provisions’’ of service areas by the statutory transition [FR Doc. 08–1128 Filed 4–10–08; 11:35 am]
the PRA on January 7, 2008. The deadline, when they must cease BILLING CODE 6712–01–P

VerDate Aug<31>2005 18:09 Apr 11, 2008 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\14APN1.SGM 14APN1

S-ar putea să vă placă și