Federal Register / Vol. 73, No.

60 / Thursday, March 27, 2008 / Notices 16291

APPLICATION’’, j. Deadline for filing comments, the Commission on or before the


‘‘RECOMMENDATIONS FOR TERMS protests, and motions to intervene: 60 specified comment date for the
AND CONDITIONS’’, ‘‘PROTEST’’, OR days from the issuance date of this particular application (see 18 CFR 4.36).
‘‘MOTION TO INTERVENE’’, as notice. Submission of a timely notice of intent
applicable, and the Project Number of All documents (original and eight allows an interested person to file the
the particular application to which the copies) should be filed with: Kimberly competing preliminary permit
filing refers. Any of the above-named D. Bose, Secretary, Federal Energy application no later than 30 days after
documents must be filed by providing Regulatory Commission, 888 First the specified comment date for the
the original and the number of copies Street, NE., Washington, DC 20426. particular application. A competing
provided by the Commission’s Comments, protests, and interventions preliminary permit application must
regulations to: The Secretary, Federal may be filed electronically via the conform with 18 CFR 4.30 and 4.36.
Energy Regulatory Commission, 888 Internet in lieu of paper; see 18 CFR n. Competing Development
First Street, NE., Washington, DC 20426. 385.2001(a)(1)(iii) and the instructions Application—Any qualified
A copy of any motion to intervene must on the Commission’s Web site under the development applicant desiring to file a
also be served upon each representative ‘‘e-Filing’’ link. The Commission competing development application
of the Applicant specified in the strongly encourages electronic filings. must submit to the Commission, on or
particular application. Please include the project number before a specified comment date for the
t. Agency Comments—Federal, State, (P–13006–000) on any comments or particular application, either a
and local agencies are invited to file motions filed. competing development application or a
comments on the described application. The Commission’s Rules of Practice notice of intent to file such an
A copy of the application may be and Procedure require all intervenors application. Submission of a timely
obtained by agencies directly from the filing documents with the Commission notice of intent to file a development
Applicant. If an agency does not file to serve a copy of that document on application allows an interested person
comments within the time specified for each person in the official service list to file the competing application no
filing comments, it will be presumed to for the project. Further, if an intervenor later than 120 days after the specified
have no comments. One copy of an files comments or documents with the comment date for the particular
agency’s comments must also be sent to Commission relating to the merits of an application. A competing license
the Applicant’s representatives. issue that may affect the responsibilities application must conform with 18 CFR
of a particular resource agency, they 4.30 and 4.36.
Kimberly D. Bose, must also serve a copy of the document o. Notice of Intent—A notice of intent
Secretary. on that resource agency. must specify the exact name, business
[FR Doc. E8–6218 Filed 3–26–08; 8:45 am] k. Description of Project: The address, and telephone number of the
BILLING CODE 6717–01–P proposed project using the U.S. Army prospective applicant, and must include
Corps of Engineers’ Green River Lock an unequivocal statement of intent to
and Dam #5 and operated in a run-of- submit, if such an application may be
DEPARTMENT OF ENERGY river mode would consist of: (1) A new filed, either a preliminary permit
powerhouse and switchyard; (2) two application or a development
Federal Energy Regulatory turbine/generator units with a combined application (specify which type of
Commission installed capacity of 14 megawatts; (3) a application). A notice of intent must be
[Project No. 13006–000] new 0.25-mile-long above ground 25- served on the applicant(s) named in this
kilovolt transmission line extending public notice.
Green River 5 Hydro, LLC; Notice of from the switchyard to an p. Proposed Scope of Studies Under
Application Accepted for Filing and interconnection point with the local Permit—A preliminary permit, if issued,
Soliciting Motions to Intervene, utility’s distribution system; and (4) does not authorize construction. The
Protests, and Comments appurtenant facilities. The proposed term of the proposed preliminary permit
Green River Lock and Dam #5 Project would be 36 months. The work
March 20, 2008.
would have an average annual proposed under the preliminary permit
Take notice that the following generation of 40 gigawatt-hours. would include economic analysis,
hydroelectric application has been filed l. This filing is available for review at preparation of preliminary engineering
with the Commission and is available the Commission in the Public Reference plans, and a study of environmental
for public inspection: Room or may be viewed on the impacts. Based on the results of these
a. Type of Application: Preliminary Commission’s Web site at http:// studies, the Applicant would decide
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
b. Project No.: 13006–000.
c. Date filed: September 7, 2007. Enter the docket number excluding the of a development application to
d. Applicant: Green River 5 Hydro, last three digits in the docket number construct and operate the project.
LLC. field to access the document. For q. Comments, Protests, or Motions to
e. Name of Project: Green River Lock assistance, call toll-free 1–866–208– Intervene—Anyone may submit
and Dam #5 Hydroelectric Project. 3676 or e-mail comments, a protest, or a motion to
f. Location: Green River in Warren FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
County, Kentucky. It would use the U.S. For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
Army Corps of Engineers’ Green River also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
Lock and Dam #5. reproduction at the address in item h In determining the appropriate action to
g. Filed Pursuant to: Federal Power above. take, the Commission will consider all
Act, 16 U.S.C. 791(a)–825(r). m. Competing Preliminary Permit— protests or other comments filed, but
pwalker on PROD1PC71 with NOTICES

h. Applicant Contact: Mr. Brent L. Anyone desiring to file a competing only those who file a motion to
Smith, COO, Symbiotics, LLC, P.O. Box application for preliminary permit for a intervene in accordance with the
535, Rigby, ID 83442, (208) 745–0834. proposed project must submit the Commission’s Rules may become a
i. FERC Contact: Robert Bell, (202) competing application itself, or a notice party to the proceeding. Any comments,
502–4126. of intent to file such an application, to protests, or motions to intervene must

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1
16292 Federal Register / Vol. 73, No. 60 / Thursday, March 27, 2008 / Notices

be received on or before the specified e. Name of Project: Kentucky River field to access the document. For
comment date for the particular Lock and Dam #10 Hydroelectric assistance, call toll-free 1–866–208–
application. Project. 3676 or e-mail
r. Filing and Service of Responsive f. Location: Kentucky River in FERCONLINESUPPORT@FERC.GOV.
Documents—Any filings must bear in Madison County, Kentucky. It would For TTY, call (202) 502–8659. A copy is
all capital letters the title use the U.S. Army Corps of Engineers’ also available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Kentucky River Lock and Dam #10. reproduction at the address in item h
TO FILE COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power above.
‘‘COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). m. Competing Preliminary Permit—
‘‘PROTEST’’, and ‘‘MOTION TO h. Applicant Contact: Mr. Brent L. Anyone desiring to file a competing
INTERVENE’’, as applicable, and the Smith, COO, Symbiotics, LLC, P.O. Box application for preliminary permit for a
Project Number of the particular 535, Rigby, ID 83442, (208) 745–0834. proposed project must submit the
application to which the filing refers. i. FERC Contact: Robert Bell, (202) competing application itself, or a notice
Any of the above-named documents 502–4126. of intent to file such an application, to
must be filed by providing the original j. Deadline for filing comments, the Commission on or before the
and the number of copies provided by protests, and motions to intervene: 60 specified comment date for the
the Commission’s regulations to: The days from the issuance date of this particular application (see 18 CFR 4.36).
Secretary, Federal Energy Regulatory notice. Submission of a timely notice of intent
All documents (original and eight allows an interested person to file the
Commission, 888 First Street, NE.,
copies) should be filed with: Kimberly competing preliminary permit
Washington, DC 20426. An additional
D. Bose, Secretary, Federal Energy application no later than 30 days after
copy must be sent to Director, Division
Regulatory Commission, 888 First the specified comment date for the
of Hydropower Administration and
Street, NE., Washington, DC 20426. particular application. A competing
Compliance, Federal Energy Regulatory
Comments, protests, and interventions preliminary permit application must
Commission, at the above-mentioned
may be filed electronically via the conform with 18 CFR 4.30 and 4.36.
address. A copy of any notice of intent,
Internet in lieu of paper; see 18 CFR n. Competing Development
competing application or motion to
385.2001(a)(1)(iii) and the instructions Application—Any qualified
intervene must also be served upon each
on the Commission’s Web site under the development applicant desiring to file a
representative of the Applicant
‘‘e-Filing’’ link. The Commission competing development application
specified in the particular application.
strongly encourages electronic filings. must submit to the Commission, on or
s. Agency Comments—Federal, State,
Please include the project number (P– before a specified comment date for the
and local agencies are invited to file
13001–000) on any comments or particular application, either a
comments on the described application.
motions filed. competing development application or a
A copy of the application may be The Commission’s Rules of Practice
obtained by agencies directly from the notice of intent to file such an
and Procedure require all intervenors application. Submission of a timely
Applicant. If an agency does not file filing documents with the Commission
comments within the time specified for notice of intent to file a development
to serve a copy of that document on application allows an interested person
filing comments, it will be presumed to each person in the official service list to file the competing application no
have no comments. One copy of an for the project. Further, if an intervenor later than 120 days after the specified
agency’s comments must also be sent to files comments or documents with the comment date for the particular
the Applicant’s representatives. Commission relating to the merits of an application. A competing license
Kimberly D. Bose, issue that may affect the responsibilities application must conform with 18 CFR
Secretary. of a particular resource agency, they 4.30 and 4.36.
[FR Doc. E8–6217 Filed 3–26–08; 8:45 am] must also serve a copy of the document o. Notice of Intent—A notice of intent
BILLING CODE 6717–01–P
on that resource agency. must specify the exact name, business
k. Description of Project: The address, and telephone number of the
proposed project using the U.S. Army prospective applicant, and must include
DEPARTMENT OF ENERGY Corps of Engineers’ Kentucky River an unequivocal statement of intent to
Lock and Dam #10 and operated in a submit, if such an application may be
Federal Energy Regulatory run-of-river mode would consist of: (1) filed, either a preliminary permit
Commission A new powerhouse and switchyard; (2) application or a development
two turbine/generator units with a application (specify which type of
[Project No. 13001–000]
combined installed capacity of 10 application). A notice of intent must be
Kentucky Hydro 10, LLC; Notice of megawatts; (3) a new 0.16-mile-long served on the applicant(s) named in this
Application Accepted for Filing and above ground 25-kilovolt transmission public notice.
Soliciting Motions to Intervene, line extending from the switchyard to p. Proposed Scope of Studies Under
Protests, and Comments an interconnection point with the local Permit—A preliminary permit, if issued,
utility’s distribution system; and (4) does not authorize construction. The
March 20, 2008. appurtenant facilities. The proposed term of the proposed preliminary permit
Take notice that the following Kentucky River Lock and Dam #10 would be 36 months. The work
hydroelectric application has been filed Project would have an average annual proposed under the preliminary permit
with the Commission and is available generation of 30 gigawatt-hours. would include economic analysis,
for public inspection: l. This filing is available for review at preparation of preliminary engineering
a. Type of Application: Preliminary the Commission in the Public Reference plans, and a study of environmental
pwalker on PROD1PC71 with NOTICES

Permit. Room or may be viewed on the impacts. Based on the results of these
b. Project No.: 13001–000. Commission’s Web site at http:// studies, the Applicant would decide
c. Date filed: September 7, 2007. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
d. Applicant: Kentucky Hydro 10, Enter the docket number excluding the of a development application to
LLC. last three digits in the docket number construct and operate the project.

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1