Sunteți pe pagina 1din 2

Federal Register / Vol. 73, No.

57 / Monday, March 24, 2008 / Notices 15503

an unequivocal statement of intent to obtained by agencies directly from the also serve a copy of the document on
submit, if such an application may be Applicant. If an agency does not file that resource agency. A copy of any
filed, either a preliminary permit comments within the time specified for motion to intervene must also be served
application or a development filing comments, it will be presumed to upon each representative of the
application (specify which type of have no comments. One copy of an Applicant specified in the particular
application). A notice of intent must be agency’s comments must also be sent to application.
served on the applicant(s) named in this the Applicant’s representatives. k. Description of Request: Alabama
public notice. Power Company (APC) is requesting a
p. Proposed Scope of Studies Under Kimberly D. Bose, temporary variance of the Jordan Dam
Permit—A preliminary permit, if issued, Secretary. Project’s minimum flow requirements
does not authorize construction. The [FR Doc. E8–5845 Filed 3–21–08; 8:45 am] due to continuing drought conditions in
term of the proposed preliminary permit BILLING CODE 6717–01–P the southeast, and to ensure, to the
would be 36 months. The work extent possible, that there will be
proposed under the preliminary permit sufficient water available in the Coosa
would include economic analysis, DEPARTMENT OF ENERGY River to support both reservoir and
preparation of preliminary engineering downstream environmental, municipal
plans, and a study of environmental Federal Energy Regulatory and industrial water supply and
impacts. Based on the results of these Commission navigation needs. Beginning April 1, the
studies, the Applicant would decide [Project No. 618–175] project license requires a continuous
whether to proceed with the preparation minimum base flow of 4,000 cubic feet
of a development application to Alabama Power Company; Notice of per second (cfs) for 18 hours per day
construct and operate the project. Application for Amendment of License and a pulse flow release for 6 hours per
q. Comments, Protests, or Motions to and Soliciting Comments, Motions To day. During June, the base and pulse
Intervene—Anyone may submit Intervene, and Protests flows are ramped down in daily
comments, a protest, or a motion to increments, to a continuous 2,000 cfs,
intervene in accordance with the March 14, 2008.
which is required up to March 31. APC
requirements of Rules of Practice and Take notice that the following is requesting a variance to release from
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed Jordan Dam no less than a continuous
In determining the appropriate action to with the Commission and is available flow of 2,000 cfs (± 5 percent) from
take, the Commission will consider all for public inspection: April 1 through December 31, 2008,
protests or other comments filed, but a. Type of Application: Request for unless further reduction in flows
only those who file a motion to Temporary Variance of Minimum Flow becomes necessary to address
intervene in accordance with the Requirement. emergency operating conditions. Any
Commission’s Rules may become a b. Project No.: 618–175. reduction in flows would be achieved
party to the proceeding. Any comments, c. Date Filed: March 13, 2008. by ramping down flows by no more than
protests, or motions to intervene must d. Applicant: Alabama Power 66.7 cfs per day. The licensee is also
be received on or before the specified Company. proposing to conduct weekly conference
comment date for the particular e. Name of Project: Jordan Dam. calls with the resource agencies to
application. f. Location: On the Coosa River, in discuss project releases and operations
r. Filing and Service of Responsive Elmore, Chilton, and Coosa Counties, to address drought related issues.
Documents—Any filings must bear in Alabama. l. Location of the Application: The
all capital letters the title g. Filed Pursuant to: Federal Power filing is available for inspection and
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT Act, 16 U.S.C. 791a–825r. reproduction at the Commission’s
TO FILE COMPETING APPLICATION’’, h. Applicant Contact: Barry Lovett, Public Reference Room, located at 888
‘‘COMPETING APPLICATION’’, Alabama Power Company, 600 N. 18th First Street, NE., Room 2A, Washington,
‘‘PROTEST’’, and ‘‘MOTION TO Street, P.O. Box 2641, Birmingham, AL DC 20426 or by calling (202) 502–8371,
INTERVENE’’, as applicable, and the 35291, (205) 257–1258. or by calling (202) 502–8371. This filing
Project Number of the particular i. FERC Contact: Peter Yarrington, may also be viewed on the
application to which the filing refers. peter.yarrington@ferc.gov, (202) 502– Commission’s Web site at http://ferc.gov
Any of the above-named documents 6129. using the ‘‘eLibrary’’ link. Enter the
must be filed by providing the original j. Deadline for filing comments, docket number (P–618) in the docket
and the number of copies provided by motions to intervene and protests: number field to access the document.
the Commission’s regulations to: The March 28, 2008. You may also register online at http://
Secretary, Federal Energy Regulatory All documents (original and eight www.ferc.gov/docsfiling/
Commission, 888 First Street, NE., copies) should be filed with: Kimberly esubscription.asp to be notified via e-
Washington, DC 20426. An additional D. Bose, Secretary, Federal Energy mail or new filings and issuances
copy must be sent to Director, Division Regulatory Commission, 888 First related to this or other pending projects.
of Hydropower Administration and Street, NE., Washington, DC 20426. For assistance, call 1–866–208–3676 or
Compliance, Federal Energy Regulatory The Commission’s Rules of Practice e-mail FERCOnlineSupport@ferc.gov,
Commission, at the above-mentioned and Procedure require all intervenors for TTY, call (202) 502–8659. A copy is
address. A copy of any notice of intent, filing documents with the Commission also available for inspection and
competing application or motion to to serve a copy of that document on reproduction at the address in item (h)
intervene must also be served upon each each person whose name appears on the above.
mstockstill on PROD1PC66 with NOTICES

representative of the Applicant official service list for the project. m. Individuals desiring to be included
specified in the particular application. Further, if an intervenor files comments on the Commission’s mailing list should
s. Agency Comments—Federal, state, or documents with the Commission so indicate by writing to the Secretary
and local agencies are invited to file relating to the merits of an issue that of the Commission.
comments on the described application. may affect the responsibilities of a n. Comments, Protests, or Motions to
A copy of the application may be particular resource agency, they must Intervene: Anyone may submit

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1
15504 Federal Register / Vol. 73, No. 57 / Monday, March 24, 2008 / Notices

comments, a protest, or a motion to f. Location: Kentucky River in Henry For TTY, call (202) 502–8659. A copy is
intervene in accordance with the County, Kentucky. It would use the U.S. also available for inspection and
requirements of Rules of Practice and Army Corps of Engineers’ Kentucky reproduction at the address in item h
Procedure, 18 CFR 385.210, .211, .214. River Lock and Dam #2. above.
In determining the appropriate action to g. Filed Pursuant to: Federal Power m. Competing Preliminary Permit—
take, the Commission will consider all Act, 16 U.S.C. 791(a)–825(r). Anyone desiring to file a competing
protests or other comments filed, but h. Applicant Contact: Mr. Brent L. application for preliminary permit for a
only those who file a motion to Smith, COO, Symbiotics, LLC, P.O. Box proposed project must submit the
intervene in accordance with the 535, Rigby, ID 83442, (208) 745–0834. competing application itself, or a notice
Commission’s Rules may become a i. FERC Contact: Robert Bell, (202) of intent to file such an application, to
party to the proceeding. Any comments, 502–4126. the Commission on or before the
protests, or motions to intervene must j. Deadline for filing comments, specified comment date for the
be received on or before the specified protests, and motions to intervene: 60 particular application (see 18 CFR 4.36).
comment date for the particular days from the issuance date of this Submission of a timely notice of intent
application. notice. allows an interested person to file the
All documents (original and eight competing preliminary permit
o. Any filings must bear in all capital
copies) should be filed with: Secretary, application no later than 30 days after
letters the title ‘‘COMMENTS’’,
Federal Energy Regulatory Commission, the specified comment date for the
‘‘PROTEST’’, or ‘‘MOTION TO
888 First Street, NE., Washington, DC particular application. A competing
INTERVENE’’, as applicable, and the
20426. Comments, protests, and preliminary permit application must
Project Number of the particular
interventions may be filed electronically conform with 18 CFR 4.30 and 4.36.
application to which the filing refers.
via the Internet in lieu of paper; see 18 n. Competing Development
p. Agency Comments: Federal, state,
CFR 385.2001(a)(1)(iii) and the Application—Any qualified
and local agencies are invited to file
instructions on the Commission’s Web development applicant desiring to file a
comments on the described application.
site under the ‘‘e-Filing’’ link. The competing development application
A copy of the application may be
Commission strongly encourages must submit to the Commission, on or
obtained by agencies directly from the
electronic filings. Please include the before a specified comment date for the
Applicant. If an agency does not file
project number (P–12991–000) on any particular application, either a
comments within the time specified for
comments or motions filed. competing development application or a
filing comments, it will be presumed to The Commission’s Rules of Practice
have no comments. One copy of an notice of intent to file such an
and Procedure require all intervenors application. Submission of a timely
agency’s comments must also be sent to filing documents with the Commission
the Applicant’s representatives. notice of intent to file a development
to serve a copy of that document on application allows an interested person
q. Comments, protests and each person in the official service list
interventions may be filed electronically to file the competing application no
for the project. Further, if an intervenor later than 120 days after the specified
via the Internet in lieu of paper. See, 18 files comments or documents with the
CFR 385.2001(a)(I)(iii) and the comment date for the particular
Commission relating to the merits of an application. A competing license
instructions on the Commission’s Web issue that may affect the responsibilities application must conform with 18 CFR
site at http://www.ferc.gov under the ‘‘e- of a particular resource agency, they 4.30 and 4.36.
Filing’’ link. must also serve a copy of the document o. Notice of Intent—A notice of intent
Kimberly D. Bose, on that resource agency. must specify the exact name, business
Secretary. k. Description of Project: The address, and telephone number of the
[FR Doc. E8–5832 Filed 3–21–08; 8:45 am] proposed project using the U.S. Army prospective applicant, and must include
Corps of Engineers’ Kentucky River an unequivocal statement of intent to
BILLING CODE 6717–01–P
Lock and Dam #2 and operated in a run- submit, if such an application may be
of-river mode would consist of: (1) A filed, either a preliminary permit
DEPARTMENT OF ENERGY new powerhouse and switchyard; (2) application or a development
two turbine/generator units with a application (specify which type of
Federal Energy Regulatory combined installed capacity of 13 application). A notice of intent must be
Commission megawatts; (3) a new 3-mile-long above served on the applicant(s) named in this
ground 25-kilovolt transmission line public notice.
[Project No. 12991–000]
extending from the switchyard to an p. Proposed Scope of Studies Under
Kentucky Hydro 2, LLC; Notice of interconnection point with the local Permit—A preliminary permit, if issued,
Application Accepted for Filing and utility’s distribution system; and (4) does not authorize construction. The
Soliciting Motions To Intervene, appurtenant facilities. The proposed term of the proposed preliminary permit
Protests, and Comments Kentucky River Lock and Dam #2 would be 36 months. The work
Project would have an average annual proposed under the preliminary permit
March 17, 2008. generation of 39 gigawatt-hours. would include economic analysis,
Take notice that the following l. This filing is available for review at preparation of preliminary engineering
hydroelectric application has been filed the Commission in the Public Reference plans, and a study of environmental
with the Commission and is available Room or may be viewed on the impacts. Based on the results of these
for public inspection: Commission’s Web site at http:// studies, the Applicant would decide
a. Type of Application: Preliminary www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
mstockstill on PROD1PC66 with NOTICES

Permit. Enter the docket number excluding the of a development application to


b. Project No.: 12991–000. last three digits in the docket number construct and operate the project.
c. Date filed: September 10, 2007. field to access the document. For q. Comments, Protests, or Motions to
d. Applicant: Kentucky Hydro 2, LLC. assistance, call toll-free 1–866–208– Intervene—Anyone may submit
e. Name of Project: Kentucky River 3676 or e-mail comments, a protest, or a motion to
Lock and Dam #2 Hydroelectric Project. FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the

VerDate Aug<31>2005 16:33 Mar 21, 2008 Jkt 214001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\24MRN1.SGM 24MRN1

S-ar putea să vă placă și