Sunteți pe pagina 1din 45

PROJECT ENGINEERING SYSTEM

2010-10-01 First Issue

Rev.

Date

ABto
Description

Client:

PNcl

Performed Checked

PNcl
Approved

Title:

ICEPRONAV SA

DRAUGHTING PROCEDURE

Size:
A4

Project No:
PES

Rev:
A

1921 Circular Road, Douglas, Phone: +44-(0)-1624-623-190


Isle of Man, IM11AF British Isles Fax: +44-(0)-1624-628-297
Document No:
Sheet:
Additional contact information:
Phone:+40-(0)-236-415-965
1 of 45
Web: www.icedesign.info
Fax: +40-(0)-236-417-836
The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

PES-MD-P001

2010, ICEPRONAV
File name: PES-MD-P001_A - Draughting Procedure.doc

Form Code PES-AD-T001 Rev. A / May 2010

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
2 of 45
Rev

REVISION HISTORY
REVISION

REVISED CHAPTERS

REVISION DESCRIPTION

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

REASON FOR REVISION

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
3 of 45
Rev

TABLE OF CONTENTS
1

PURPOSE .............................................................................................................................. 5

SCOPE ................................................................................................................................... 5

ABBREVIATIONS .................................................................................................................. 5

REFERENCES........................................................................................................................ 6

PROCEDURE DESCRIPTION ................................................................................................ 7


5.1

GENERAL ......................................................................................................................... 7

5.1.1

Drawing layout ....................................................................................................... 8

5.1.2

Sheet sizes ............................................................................................................. 9

5.1.3

Font name and sizes............................................................................................ 10

5.2

ADMINISTRATIVE PART LAYOUT ................................................................................. 11

5.2.1

Property stamp block .......................................................................................... 12

5.2.2

Title block ............................................................................................................. 13

5.2.3

Revision status list .............................................................................................. 15

5.2.4

Sticker / Stamp area............................................................................................. 16

5.2.5

Holds block .......................................................................................................... 17

5.2.6

Notes .................................................................................................................... 18

5.2.7

List of reference documents ............................................................................... 19

5.2.8

Key plan................................................................................................................ 20

5.2.9

List of materials ................................................................................................... 21

5.3

DRAWING PART LAYOUT .............................................................................................. 22

5.3.1

Creating a drawing in Model Space / Paper Space ............................................ 23

5.3.2

Projection method ............................................................................................... 25

5.3.3

Scale method ....................................................................................................... 27

5.3.4

Titles ..................................................................................................................... 28

5.3.5

Text in Drawing Part Layout ................................................................................ 29

5.3.6

Dimensions .......................................................................................................... 30

5.3.7

Sections, Views and Details ................................................................................ 31

5.3.8

Item Number ......................................................................................................... 32

5.3.9

Holds indication ................................................................................................... 33

5.3.10

Revision Indication .............................................................................................. 34

5.4

CAD DRAWING SPECIFICS ........................................................................................... 35

5.4.1

Layer arrangements............................................................................................. 36

5.4.2

Line types, line styles and colours ..................................................................... 37


2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010

File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001
5.4.3

Sheet
4 of 45
Rev

CAD blocks .......................................................................................................... 38

APPENDIX 1 - EXAMPLE OF DRAWING LAYOUT ............................................................. 39

APPENDIX 2 LAYER ARRANGEMENTS .......................................................................... 40

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
5 of 45
Rev

PURPOSE

The purpose of this document is to ensure a consistent and unified company-wide approach in the
production of engineering drawings.
The intent is to guide the reader through the steps to be taken when producing a drawing. In addition
the procedure describes a uniform and logical approach in order to ensure easy-to-read layouts for all
CAD drawings.

SCOPE

This procedure is applicable to all drawings generated within ICE for all types of projects. In addition
drawings produced by subcontractors to ICE shall be subject to the same procedure.

ABBREVIATIONS
CAD
D&ID
P&ID

Computer Aided Design


Ducting & Instrumentation Diagram
Piping & Instrumentation Diagram

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
6 of 45
Rev

REFERENCES
[1] PES-AD-P001 - Project Document Coding Procedure
[2] HR - P 011 - Employees / Subcontractors Name Coding Procedure.
[3] ISO 128-20 - Technical drawings -- General principles of presentation -- Part 20: Basic
conventions for lines
[4] ISO 128-22 - Technical drawings -- General principles of presentation -- Part 22: Basic
conventions and applications for leader lines and reference lines
[5] ISO 128-24 - Technical drawings -- General principles of presentation -- Part 24: Lines
on mechanical engineering drawings
[6] ISO 128-25 - Technical drawings -- General principles of presentation -- Part 25: Lines
on shipbuilding drawings
[7] ISO 128-30 - Technical drawings -- General principles of presentation -- Part 30: Basic
conventions for views
[8] ISO 128-34 - Technical drawings -- General principles of presentation -- Part 34: Views
on mechanical engineering drawings
[9] ISO 128-40 - Technical drawings -- General principles of presentation -- Part 40: Basic
conventions for cuts and sections
[10] ISO 128-44 - Technical drawings -- General principles of presentation -- Part 44:
Sections on mechanical engineering drawings
[11] ISO 128-50 - Technical drawings -- General principles of presentation -- Part 50: Basic
conventions for representing areas on cuts and sections
[12] ISO 129-1 - Technical drawings -- Indication of dimensions and tolerances -- Part 1:
General principles
[13] ISO 1101 - Geometrical Product Specifications (GPS) -- Geometrical tolerancing -Tolerances of form, orientation, location and run-out - Generalities, definitions,
symbols, indications on drawings
[14] ISO 1302 - Geometrical Product Specifications (GPS) -- Indication of surface texture in
technical product documentation
[15] ISO 2768-1 - General tolerances -- Part 1: Tolerances for linear and angular
dimensions without individual tolerance indications
[16] ISO 3040 - Geometrical product specifications (GPS) -- Dimensioning and tolerancing
Cones
[17] ISO 3098-2 - Technical product documentation Lettering
[18] ISO 5455 - Technical drawings Scales
[19] ISO 5456-1 - Technical Drawings. Projection methods
[20] ISO 5457 - Technical product documentation -- Sizes and layout of drawing sheets
[21] ISO 6410 - Technical drawings -- Screw threads and threaded parts
[22] ISO 6433 - Technical drawings Item references
[23] ISO 7200 - Technical product documentation -- Data fields in title blocks and document
headers
[24] ISO 7573 - Technical product documentation -- Parts lists

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
7 of 45
Rev

PROCEDURE DESCRIPTION

5.1

GENERAL

Drawings must be complete and unambiguous in interpretation. Complete drawings contain or make
reference to all data necessary for:
-

fabricating, assembling, installing of the component parts;


testing requirements;
procurement requirements indicating suppliers.

Drawings must be:


- laid out in accordance with this procedure;
- complete (unless specifically stated otherwise);
- accurate and technically correct;
- properly laid out;
- easy to read;
- unambiguous;
- contain all necessary information;
- avoid duplication of information;
- be checked in accordance with company procedures prior to general issue /
distribution;
- be approved in accordance with company procedures prior to issue to the client.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
8 of 45

Document No: PES-MD-P001

5.1.1

Rev

Drawing layout

A drawing is divided in two parts:


- an administrative part;
- a drawing part.
1

10

11

12

File name: Drawing6.dwg

19-21 Circular Road, Douglas,


Phone: +44-(0)-1624-623-190
Isle of Man, IM1 1AF British Isles Fax: +44-(0)-1624-628-297
Additional contact information:
Phone: +40-(0)-236-415-965
Web: www.icedesign.info
Fax: +40-(0)-236-417-836
The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

10

11

12

A1

The administrative part is located on the right hand side of the drawing, extended from bottom to
top, dedicated to the following elements wherever these are applicable: property stamp, title block,
revision list, stickers / stamps, holds block, notes, list of reference documents, key plan, list of
materials. The administrative part is described in instructions 5.2.1 to 5.2.9 of this document.
The drawing part indicates the area upon which arrangements, views, elevations, sections,
diagrams, etc. shall be drawn. The standards to be used for the drawing part are described in detail in
instructions 5.3.1 to 5.3.9 of this document.
The both parts are divided by a vertical line only on first page of drawing.
References:
- None

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.1.2

Sheet
9 of 45
Rev

Sheet sizes

The standard sizes of ICE drawing sheets are in accordance with ISO 5457, namely A series, as
presented below. The basic size in this series is the A0 size (1189 x 841mm).

Drawing
Sheet Size

Size
[mm]

A0
A1
A2
A3
A4

1189 x 841
841 x 591
594 x 420
420 x 297
297 x 210

ICE Form Code Drawing


Form Code Dwg.A0
Form Code Dwg.A1
Form Code Dwg.A2
Form Code Dwg.A3
Form Code Dwg.A4

The use of A0 size is to be avoided wherever possible unless it is a specific contract


requirement.
The preferred size for drawings is A1.
A3 and A4 drawings are preferably to be used for drawing packages (e.g. booklets of drawings). A
package may consist of a cover sheet, an index sheet (or sheets) and the drawings which make up
the package. All drawings within a package shall have the same document number but be identified
by unique and consecutive sheet numbers.
Drawings are to be produced to the most appropriate scale in order to meet the requirements for the
respective type of drawing (concept, basic or detail). This is intended to maintain clarity once all
dimensions, symbols, item numbers and miscellaneous details have been included.
The originator is responsible for the accuracy and clarity of drawings. It will be for the originator to
decide upon the appropriate number of sheets.

References:
- ISO 5457 - Technical product documentation -- Sizes and layout of drawing sheets

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
10 of 45

Document No: PES-MD-P001

5.1.3

Rev

Font name and sizes

Text used in all ICE drawings must be in font Arial (ISO 3098-2).
Preferred font sizes are: 2.5, 3.5 and 5.
In special cases there will be used sizes: 1.8, 7 and 10. These cases are treated in 5.2.1, 5.3.4.
Width Factor: 0.8 - 1, as defined in the next chapters.
Colour:
Font colour
Font size

Drawing Part Layout

1.8
2.5
3.5
5
7
10

Red
White
Yellow
Magenta
Blue
Green

Administrative Part
Layout
White
White
White
White
White
White

Notes:
o
o

Exceptions: Dimensions text will be red (see chapter 5.3.6), revision indication
symbol will be red (see chapter 5.3.10);
For background texts, the colour will be grey - 253.

References:
- ISO 3098-2 - Technical product documentation -- Lettering

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.2

Sheet
11 of 45
Rev

ADMINISTRATIVE PART LAYOUT

The administrative part of the drawing consists of the following sections, extended from bottom to top,
in the following order (Appendix 1):
1.
2.
3.
4.
5.
6.
7.
8.

Property stamp block;


Title block;
Revision status list;
Sticker / Stamp area;
Holds block;
Notes;
List of reference documents;
Key plan, applicable on structural unit drawings, arrangement and coordination
drawings;
9. List of materials.
For multiple page drawings, the administrative part for the pages from the second onward shall
include the following sections only:
1.
2.
3.
4.

Property stamp block;


Title block;
Revision status list;
Sticker / Stamp area;

References:
- Detailed instructions for above sections are given in instructions 5.2.1 5.2.9.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
12 of 45

Document No: PES-MD-P001

5.2.1

Rev

Property stamp block

Property stamp block


The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

is located bottom of title block:

H
19-21 Circular Road, Douglas,
Phone: +44-(0)-1624-623-190
Isle of Man, IM1 1AF British Isles Fax:
+44-(0)-1624-628-297
Additional contact information:
Phone: +40-(0)-236-415-965
Web: www.icedesign.info
Fax:
+40-(0)-236-417-836
The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

10

11

Font name, size and colour used:


-

Font used: Arial;


Width factor: 0.8;
Colour: white.
Font size: 1.8;

References:
-

Font name and sizes as per instruction 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

12

A1

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
13 of 45

Document No: PES-MD-P001

5.2.2

Rev

Title block

The title block conveys relevant information about the drawing enabling accurate interpretation,
identification and archiving.
The default title block to be used in all ICE projects is (ISO 7200):

File name: Drawing17.dwg

8
5
19-21 Circular Road, Douglas, Phone: +44-(0)-1624-623-190
Isle of Man, IM1 1AF British Isles Fax: +44-(0)-1624-628-297
Additional contact information: Phone: +40-(0)-236-415-965
Web: www.icedesign.info
Fax: +40-(0)-236-417-836

1
2

The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

Wherein:
Item 1 - Project number
Item 2 - Drawing number
Item 3 - Revision status (revision status will be completed for all sheets of the drawing)
Item 4 - Client / Third Party or Client Info and logo
Item 5 - Main scale of the drawing (e.g. 1:50)
Item 6 - Current sheet number out of total number of sheets.
The typical format to be used is: 1 of 2.
Item 7 - Drawing title
Drawing number and title are to be in accordance with the Project Document Coding Procedure PES-AD-P001
Font name, sizes, width factor and colour used:
Item
1
2
3
4
5
6
7
8
9

Area
Project Number
Drawing Number
Revision1
Client
Scale
Sheet
Title
Subtitle
Size

Font
Style
Arial
Arial
Arial
<LOGO>
Arial
Arial
Arial
Arial
Arial

Font
Size
2.5
3.5
3.5

Width
Factor
0.8
0.8
0.8

Font
colour
white
white
white

2.5
2.5
3.5
2.5
2.5

0.8
0.8
0.8
0.8
0.8

white
white
white
white
white

Revision status will be completed in all sheets of the drawing.


2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010

File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
14 of 45
Rev

References:
- Document numbering and title as per Project Document Coding Procedure- PES-AD-P001
- Sheet size as per instruction 5.1.2.
- Font name and sizes as per instruction 5.1.3.
- Revision as per instruction 5.2.3 and 5.3.10.
- Projection method as per instruction 5.3.2.
- Scale method as per instruction 5.3.3.
- ISO 7200 - Technical product documentation -- Data fields in title blocks and document
headers

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
15 of 45

Document No: PES-MD-P001

5.2.3

Rev

Revision status list

The revision status list2 to be used is:

Changes of the contents of the drawing3 shall be marked by clouds around the revised drawing area.
Clouds will be used starting with B revision.
The 1st issue of a drawing is to be identified as revision A.
Drawing revisions shall follow the below sequence in alphabetic order:
First
Issue

If a Revision A drawing is modified, the new drawing showing the latest modifications will have the
same drawing number, but its revision status is to be advanced to revision B. Outdated revision A
drawings are to be filed and retained within the filing system for historic and back-referencing
purposes.
Fields Performed, Checked and Approved will be completed with name abbreviation - (according to
Employees / Subcontractors Name Coding Procedure).
Date format is yyyy.mm.dd.
Font name, sizes, width factor and colour used:
Area
Rev
Date
Description
Performed
Checked
Approved

Font style
Arial
Arial
Arial
Arial
Arial
Arial

Font size
2.5
2.5
2.5
2.5
2.5
2.5

Width factor
0.8
0.8
0.8
0.8
0.8
0.8

Font colour
white
white
white
white
white
white

References:
- Employees / Subcontractors Name Coding Procedure - HR - P - 011
- Font name and sizes as per instruction 5.1.3.
- Revision indication in title block as per instruction 5.2.2.
- Revision indication on drawing part layout as per instruction 5.3.10.

Status revision list will be placed on each sheet, if the drawing has a lot of sheets.
When a drawing has a lot of sheets, revision cloud an revision status will be placed on the sheet which will be
modified. Status revision list will be changed in all sheets of the drawing.
3

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
16 of 45

Document No: PES-MD-P001

5.2.4

Rev

Sticker / Stamp area

The area located immediately above the revision list is reserved for stickers/stamps, such as IN
PROGRESS sticker, CHECK PRINT stamp, etc.
Where a drawing has not been finalised for formal delivery but is to be issued to an external party
then upon the instruction of the Document Controller it must contain an "IN PROGRESS" indicator as
shown below:

The same indication will also be included for drawings still in progress or submitted for
internal checking.
Font name, sizes, width factor and colour used:

Area
IN PROGRESS
Date and Time

Font
Style
Arial
Arial

Font
Size
5
3.5

Width
Factor
0.8
0.8

Font
colour
white
white

When the drawing is plotted for checking / verification, this area should be kept free for CHECK
PRINT stamp to be placed.
If necessary, a PRELIMINARY or CONFIDENTIAL INFORMATION sticker will be placed in
Administrative Area, as shown below:

Font name, sizes, width factor and colour used:


-

Font name: Arial;


Font size: 5;
Width factor: 0.8;
Colour: white.

References:
- Font name and sizes as per instruction 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
17 of 45

Document No: PES-MD-P001

5.2.5

Rev

Holds block

If necessary, holds are to be indicated on the drawing using the following block:

4
5
Font name, sizes, width factor and colour used:
Item
1
2
3
4
5

Font
Style
Arial
Arial
Arial
Arial
Arial

Area
HOLDS
ID
Description
ID number
Description field

Font
Size
3.5
3.5
3.5
2.5
2.5

References:
- Font name and sizes as per instruction 5.1.3.
- Hold indication on drawing part layout 5.3.9.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Width
Factor
0.8
0.8
0.8
0.8
0.8

Font
colour
white
white
white
white
white

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
18 of 45

Document No: PES-MD-P001

5.2.6

Rev

Notes

The Notes give general information about the parts shown on the drawing concerning materials,
welds, treatment, Class Notation, etc.
The Notes shall be numbered sequentially for reference purposes. In case a note becomes redundant
and will be removed from a subsequent revision, the numbering will not be re-sequenced.
CAD coordinators within the various departments are to ensure that the standard of appearance of
Notes is consistent throughout all departments. Special care is to be taken in order to ensure that
naming conventions and abbreviations are applied consistently. (e.g. use of the abbreviation for
centreline is CL instead of C.L., etc.).
An example of a list of notes is shown below.

Description in 1 Line

Description Starting in First Line and


Continued in Second Line

5
Font name, sizes, width factor and colour used:
Item
1
2
3
4
5

Font
Style
Arial
Arial
Arial
Arial
Arial

Area
NOTES
ID
Description
ID number
Description field

Font
Size
3.5
3.5
3.5
2.5
2.5

References:
- Font name and sizes as per instruction 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Width
Factor
0.8
0.8
0.8
0.8
0.8

Font
colour
white
white
white
white
white

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
19 of 45

Document No: PES-MD-P001

5.2.7

Rev

List of reference documents

The list of reference documents is to contain only those that are directly pertinent to the subject matter
contained within the drawing .
Reference documents can be:
- parts list;
- drawings with sections or details;
- documents referring to the subject drawing;
- client drawings;
- specifications, calculations, material take-off, etc.
Referenced documents shall be denoted with:
- A reference number on the drawing which can be found in the reference list.
- A reference list which states the reference number as indicated on the drawing
followed by document number4 and title.
Reference document sequence number is unique per sheet.
Below, an example of a list of reference documents is given:
1
3

2
5

4
7

Font name, sizes, width factor and colour used:


Item
1
2
3
4
5
6
7

Font
Style
Arial
Arial
Arial
Arial
Arial
Arial
Arial

Area
REFERENCE DOCUMENTS
ID
Document number
Title
ID number
Document number
Document title

Font
Size
3.5
3.5
3.5
3.5
2.5
2.5
2.5

Width
Factor
0.8
0.8
0.8
0.8
0.8
0.8
0.8

Font
colour
white
white
white
white
white
white
white

References:
- Document numbering as per Project Document Coding Procedure - PES-AD-P001
- Font name and sizes as per instruction: 5.1.3.

Document number will be recorded without revision.


2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010

File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.2.8

Sheet
20 of 45
Rev

Key plan

A key plan is a small scale representation of the whole ship or object under consideration. The key
plan is located within the administrative part of the drawing in the top right hand corner.
On the drawing the key plan is located in top right corner of the drawing form. The recommended size
of key plan will be 180mm x 70mm.
Font name, size, width factor and colour used:
- Font name: Arial;
- Font size for key plan title: 3.5, width factor: 0.8, colour: white;
- Font size for other information: 2.5, width factor: 0.8, colour: white.
Below, is an example of a key plan:

References:
- Font name and sizes as per instruction: 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
21 of 45

Document No: PES-MD-P001

5.2.9

Rev

List of materials

List of materials (acc. to ISO 7573) will be placed to the top of the Administrative Part.
Normally, List of materials is only drawn on Detail Drawings. In this table all positions marked in
Drawing Part by Item Number will be detailed.

13

2
10

14
11

12

Font style, sizes, width factor and colour used:


Item

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Field

Item
Description
Dwg. no., Standard or
Codification
Pcs.
Material or characteristics
Remarks
Weight kg/pc.
Item number
Description: e.g. Screw M8x10-1
line
Standard: e.g. ISO EN 4815
Pieces: e.g. 40
Material or characteristics: e.g.
St.37.3
Remarks: e.g. Cd5Fl
Weight per pc.

Font
Style

Font
Size

Width
Factor

Font
colour

Arial
Arial
Arial

3.5
3.5
3.5

0.8
0.8
0.8

white
white
white

Arial
Arial
Arial
Arial
Arial
Arial

3.5
3.5
3.5
3.5
3.5
2.5

0.8
0.8
0.8
0.8
0.8
0.8

white
white
white
white
white
white

Arial
Arial
Arial

2.5
2.5
2.5

0.8
0.8
0.8

white
white
white

Arial
Arial

2.5
2.5

0.8
0.8

white
white

Once a drawing has been itemised ( see 5.3.8 ) then the list of materials is to be filled in accordingly
with item number, description, etc.
References:
- Font name and sizes as per instruction: 5.1.3.
- Item number as per instruction: 5.3.8.
- ISO 7573 - Technical product documentation -- Parts lists

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
22 of 45

Document No: PES-MD-P001

5.3

Rev

DRAWING PART LAYOUT

This area of a drawing sheet is designated solely for graphical representations such as plan views,
elevations, sections, details, diagrams, schematics, etc. It is vitally important that views must always
be laid out in a logical, consistent and easy-to-read manner in accordance with the following rules:
-

the frame numbering (frame ruler) of one view is to align with the frame numbering of others;
section views are to be aligned and laid out such that they are in a logical numeric sequence;
datums (e.g. centrelines, baseline) are to align from one view to another;
details are to be identified and positioned in a logical alphanumeric sequence;
plan views of decks must be tiered one above the other in sequence with the lowermost deck
at the bottom of the drawing area and the uppermost deck at the top of the drawing area.

Only under exceptional and agreed circumstances are these rules to be infringed.
Further information regarding projection methods, scales, titles, dimensioning, referencing, etc. are
given in instruction parts 5.3.1 to 5.3.9 of this document.
1

10

11

12

File name: Drawing6.dwg

19-21 Circular Road, Douglas,


Phone: +44-(0)-1624-623-190
Isle of Man, IM1 1AF British Isles Fax: +44-(0)-1624-628-297
Additional contact information:
Phone: +40-(0)-236-415-965
Web: www.icedesign.info
Fax: +40-(0)-236-417-836
The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

References:
- none

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

10

11

12

A1

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.3.1

Sheet
23 of 45
Rev

Creating a drawing in Model Space / Paper Space

Model Space is an environment in which all drawing components are drawn at a scale one to one,
and millimetre is the preferred measurement unit. The drawings must be positioned versus the
defined coordinate system. This will enable an accurate integration / superimposition between various
drawings.
Paper Space / Layout is an environment enabling the creation of sheet layouts for plotting purposes.
Paper Space is not intended to be used for full scale drawings.
A drawing may be created in one of two ways:
-

Inside Model Space: views, cross-sections, details, dimensions, different types of blocks
(revision clouds, item number, weld symbols, etc.) at a scale 1:1, and inside Paper Space:
Administrative Part and viewports.
Entirely within the Model Space when the previous method proves to be troublesome. In
this case the main view is created at a scale of 1:1. All entities consisting of plan views,
elevations, sections, details, text, dimensions, title block, border, etc are to be scaled to
suit the intended drawing plot size.

Steps for producing a drawing:


-

Creating a model.
Creating a Paper space Lay-out;
Creating Viewports;
Sizing / dimensioning and inserting symbols, item numbers and text.

Creating a model
It is important that the model is created in a logical and orderly manner, so it will be clear to anyone
who uses the drawing as an eXternal-Reference.
When attaching reference files, the path to this file should only be named as No Path. Set
Reference Type on Overlay:

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
24 of 45
Rev

Creating a Paper space Layout


From Model space switch to Paper Space environment. Page Setup Manager will be selected, and
then Paper Size will be set to A1, Plot Scale to 1:1 and Plot Area to Layout. The drawing border, title
block and other administrative blocks are then superimposed.

Creating Viewports
As a standard, a layer is made with the name Viewport. Otherwise this layer should be created. The
existing viewport must be produced at a desired scale (i.e. 1:50) and then be locked. The viewport will
be sized and positioned upon the drawing area. Any other necessary viewport is to be created, scaled
and sited as above.

References:
- None

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.3.2

Sheet
25 of 45
Rev

Projection method

The method shown by Reference Arrows is mainly used for ship work rather than the First Angle
Projection Method.
The ICE projection method used is the European projection - first angle projection (ISO 5456-1).

Principal view

If the use of European projection method is not suitable due the lack of space in the drawing format,
then another possibility for representation of projections is by using Reference Arrows:
Principal view

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Sheet
26 of 45
Rev

Projections A and B (view from A or view from B) can be placed below principal view in a single row.
Sections parallel with A or B will be subject to the same treatment.
Projections C and D (view from C or view from D) can be placed in the same row with the principal
view in the right side. Sections parallel with C or D will be subject to the same treatment.
Naming conventions for views are as follows:
profile view meaning projection looking from starboard to port;
plan view on main deck - meaning looking vertically downwards on main deck;
plan view on platform - meaning looking vertically downwards on platform;
plan view on tank top - meaning looking vertically downwards on tank top;
section view at frame, e.g. Fr.100 - meaning cross-section (at Fr 100) looking from aft to
forward.

General projection method can be summarised as:


-

Looking from aft to forward5;


Looking vertically downwards;
Looking from starboard to port;

In general, the principal view should be the most informative, being the most recognisable during
manufacture or use.

References:
- ISO 5456-1 - Technical Drawings. Projection methods.

By exception and only when necessary, section views looking from forward to aft may of necessity have to
be used for the sake of clarity. In these circumstances such views will be clearly identified as looking aft.
2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
27 of 45

Document No: PES-MD-P001

5.3.3

Rev

Scale method

Drawings shall be to scale, except for diagrams and sketches. The main scale is indicated in box
position 5 of the title block. Deviating scales are mentioned below the title of the relevant views,
sections or details. Whenever a drawing refers to a diagram or a sketch, NTS (not to scale) will be
written in box position 5 of the title block.
Standard scales (ISO 5455), to be used:
1:1;
1:10;
1:100;
1:1000

1:2;
1:20;
1:200;

1:5;
1:50;
1:500;

1:75;
1: 750;

However, in exceptional circumstances it may be necessary to use the following scales:


(1:2.5);

(1:25);

(1:150);

(1:250);

References:
-

Title block as per instruction 5.2.2.


Sections, views and details as per instruction 5.3.7.
ISO 5455 - Technical drawings -- Scales

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
28 of 45

Document No: PES-MD-P001

5.3.4

Rev

Titles

Title descriptions for views are to be written above the view, located centrally wherever possible.
Font name, size and width factor:
- Font used: Arial underlined, uppercase;
- Font size for Title: 5; Font colour: Magenta; Layer: _G Text 0.50;
(Font size 7 or 10 can be used for Safety Plan and Fire Control Plan and font colour: blue
and green respectively)
- Font size for Subtitle or other information: 3.5, uppercase; Font colour: Yellow;
Layer: _G Text 0.35;
- Font size for Scale: 2.5; Font colour: White; Layer: _G Text 0.25;
- Width factor: 1.

SECTION ON B-B
SIMILAR IN 8 POSITIONS
SCALE 1:5

Resilient Mount

Daming Foam 50x20


Flat Bar 50x5

References:
- Font name and size as per instruction 5.1.3.
- Symbols as per instruction 5.3.7.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

1
2
3
4
5

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.3.5

Sheet
29 of 45
Rev

Text in Drawing Part Layout

For all text situated within the Drawing Part Layout other than as previously described for view Titles
(see 5.3.4), the font style, size and width factor is to be as indicated below:
-

Font used: Arial;


Font size: 2.5;
Font colour: White;
Width factor: 1;
Layer: _G Text 0.25.

References:
-

Font name and size as per instruction 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.3.6

Sheet
30 of 45
Rev

Dimensions

Drawings must include the minimum number of dimensions required for accurate manufacture:
-

describing the form or shape of the component, usually by using orthographic and
sometimes pictorial views;
giving actual dimensions of all features of the geometry;
giving information about any special manufacturing processes and materials required.

General rules for dimensioning (ISO 129):


-

Company accepted standards and conventions must be followed;


Dimensions must be placed on drawings so that they may be easily read;
Drawings must include only the minimum number of dimensions required for accurate
manufacture;
A dimension is not to be stated more than once, unless it aids communication;
It should not be necessary for the operator manufacturing or assembling the
component to need to calculate any dimension(s).

All dimensions are in metric units, unless otherwise indicated.


Font name, sizes, width factor and colour used:
-

Font name: Arial.


Dimension lines: 0.18 mm.
Font size for dimensions text: 2.5.
Width factor: 1.
Colour: text, lines, arrows - by layer (red).
Layer: _G Dimensioning.

References:
- Font size as per instruction 5.1.3.
- ISO 129 - Technical drawings -- Indication of dimensions and tolerances -- Part 1:
General principles

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
31 of 45

Document No: PES-MD-P001

5.3.7

Rev

Sections, Views and Details

For sections, views and details (ISO 128-34), the following symbols are to be used for:
Section indication and presentation:

SECTION A-A
SCALE 1:10

SECTION B-B
SCALE 1:10

View indication and presentation:

PLAN VIEW ON A
SCALE 1:10

Detail indication and presentation:

See Detail A

DETAIL A
SCALE 1:10

Font name, sizes, width factor and colour used:


-

Font name: Arial.


Font size: 5.
Width of lines: 0.25 mm
Width factor: 1.
Colour: by layer.
Layer for section, view and detail symbol: _G Symbols

References:
- Font name and size as per instruction 5.1.3.
- ISO 128-34 - Technical drawings -- General principles of presentation -- Part 34: Views
on mechanical engineering drawings

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
32 of 45

Document No: PES-MD-P001

5.3.8

Rev

Item Number

The following symbol will be used in drawing area:


Item number indication

Case a

Case b

Font name, sizes, width factor and colour used:


-

Font name: Arial.


Width of lines: 0.25 mm.
Font size for text: 5.
Width factor: 1.
Colour: by layer.
Later: _G Item Number.

References:
- Font name and size as per instruction 5.1.3.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
33 of 45

Document No: PES-MD-P001

5.3.9

Rev

Holds indication

The following symbol is to be used within the Drawing Area in order to highlight those parts of a
drawing that are on-hold. Hold numbers are to correspond with the number listed in the table of Holds
where the description of the hold point will be made also.

HOLDS indication and presentation:

HOLD 1

All indications in drawing area and the corresponding HOLDS table details (see. 5.2.5) will be deleted
after the hold status is resolved.
Font name, sizes, width factor and colour used:
-

Font name: Arial;


Width of lines: 0.35 mm;
Font size for text: 5;
Width factor: 1;
Colour: by layer;
Layer: _G Holds.

References:
- Font name and size as per instruction 5.1.3.
- HOLDS table will be completed, see 5.2.5.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
34 of 45

Document No: PES-MD-P001

5.3.10

Rev

Revision Indication

Modifications for new revisions are indicated by a Cloud around the revised part(s). Clouds are only
shown for the latest (actual) revision and only when the revision status is updated.

View on design fields

Title block and revision list will be completed in all sheets of the drawing, see 5.2.2.
One specific layer will be defined for each revision status. When a new revision occurs, the previous
revision clouds and symbols remain on their specific layers which are switched off. In this way the
revision history is kept.
Font name, sizes, width factor and colour used:
-

Font name: Arial.


Width of lines: 0.35 mm.
Font size for text: 5.
Width factor: 1.
Colour: by layer.
Layer: _G REVISION-X6

References:
- Font type and size as per instruction 5.1.3.
- Revision status from title block as per instruction 5.2.2.
- Status revision list as per instruction 5.2.3.

X means revision status. Will be a layer for each revision.


2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010

File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.4

Sheet
35 of 45
Rev

CAD DRAWING SPECIFICS

Preparation of CAD drawings will entail specific procedures and the use of tailor-made provisions,
such as reference files, layer arrangements, blocks, AutoCAD Auto lisp, Visual Basic programs and
commands.
Recording and filing of CAD drawings differs from those directly draughted by means of non-CAD
methods such as hand-draughted/non CAD produced drawings.
CAD drawings are to be prepared in such a way that they are compatible with, and easily converted
to, the various other CAD systems that may be in use.

References:
- Essential features of CAD drawings are given in the instruction 5.4.1 5.4.3 of this
document.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.4.1

Sheet
36 of 45
Rev

Layer arrangements

Different items of a CAD drawing are drawn on layers.


The layer classification is dependent on the type of drawing. The following types of drawing are set:
-

General;
Structure construction
Arrangements;
Piping and ducting layouts and schematics P&ID etc.
Electrical layouts, cables, etc.
Fire and Safety

For the various drawing types, the layer classifications are as given in Appendix 2.
Each type of drawing will be built onto one or more specific layers. Entities such as electric cable, hull,
etc. can be used as background for other drawings. Attributes such as colour and line width, for all
entities pertaining to the background will be set to grey (253) and, respectively 0.18 mm.

References:
- None

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:

Sheet
37 of 45

Document No: PES-MD-P001

5.4.2

Rev

Line types, line styles and colours

The following rules (ISO 128-20) are applicable for lines attributes - colour, width (line thickness) and
style:
LINE STYLE TABLE
LINE STYLE

ACAD Line Type


Name

Continuous

Continuous

Dots

Dot

Small dashes (hidden lines)

Hidden

__________________________

Dashes

Dashed

Dash - dot

DashDot2

_____ . _____ . _____ . _____ . _____ . _____ . ___

Dash - dot - dot

Phantom2

____ _ _ ____ _ _ ____ _ _ ____ _ _ _____ _ _ ___

Line pattern

For details of line types, lineweights, colour and application domain used see Appendix 2 LAYER
ARRANGEMENTS.

For specific hull drawings the line style and the rules for application are according to ISO 128-25.

References:
- Symbols as per instruction 5.3.6.
- ISO 128-20 - Technical drawings -- General principles of presentation -- Part 20: Basic
conventions for lines
- ISO 128-24 - Technical drawings -- General principles of presentation -- Part 24: Lines
on mechanical engineering drawings
- ISO 128-25 - Technical drawings -- General principles of presentation -- Part 25: Lines
on shipbuilding drawings

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name: PROJECT ENGINEERING SYSTEM


DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

5.4.3

Sheet
38 of 45
Rev

CAD blocks

Blocks (for AutoCAD) are displays of standard elements, such as symbols, equipment, outfitting and
auxiliary structures.
Blocks are discipline related and maintenance of the block library is consequently allocated to the
appropriate departmental CAD coordinator, under global responsibility of the CAD coordinator, who is
also responsible for the maintenance of the blocks for general use.
The structure for organizing block libraries is as follows:
O:\ICE Standards\PROJECT SYSTEMS\
- ICE Menu
- Library
- Symbols;
- Models;
- Lisp (CAD commands)
- Menu (pull-down menus)
- Template (different templates)
Notes:
1. For some projects, specific blocks are created; those blocks (not belonging to the blocks for a
certain discipline or for a specific client) are stored in project libraries (and will be stored in the
computer backup for that order).
2. In order to create a new block in the project library, the following steps are to be used:
- the entities must be drawn in layer 0. The entities will be drawn with colour, line type
and line weight attributes set BY LAYER. If necessary, these characteristics will be
changed according to drawing standards.
- upon block completion, it will be saved by using WBLOCK command, into the folder
corresponding with block destination or will be sent to CAD coordinator to do this
operation.
References:
None

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
39 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Appendix 1 - EXAMPLE OF DRAWING LAYOUT


1

10

11

12

CROSS SECTION
Full dimensioning in this section

PLAN VIEW

CROSS SECTION
C

For dimensioning in remaining sections


refer to the first section

LONGITUDINAL SECTION

CROSS SECTION
If port and starboard side are identical,
half sections may be used

LONGITUDINAL SECTION
F

DETAILS
For general details refer to
separate details drawing

File name: A$C66BC45AF.DWG

LONGITUDINAL SECTION

H
19-21 Circular Road, Douglas,
Phone: +44-(0)-1624-623-190
Isle of Man, IM1 1AF British Isles Fax: +44-(0)-1624-628-297
Additional contact information:
Phone: +40-(0)-236-415-965
Web: www.icedesign.info
Fax: +40-(0)-236-417-836
The information and data contained herein are proprietary to International Contract Engineering Ltd and are not to be copied, reproduced,
duplicated or disclosed to others, in whole or in part, without prior written consent of International Contract Engineering Ltd.

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

10

11

12

A1

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
40 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Appendix 2 LAYER ARRANGEMENTS


General
Colour
(By Layer)

Line Type
(By Layer)

Lineweight
(By Layer)

_G Text 0.18

Red

CONTINUOUS

0.18

_G Text 0.25

white

CONTINUOUS

0.25

_G Text 0.35

yellow

CONTINUOUS

0.35

_G Text 0.50

magenta

CONTINUOUS

0.50

_G Text 0.70

Blue

CONTINUOUS

0.70

_G Text 1.0

green

CONTINUOUS

1.00

_G Ad-tive

white

CONTINUOUS

0.25

_G Ruler

Red

CONTINUOUS

0.18

Used to draw CL and BL.

_G Centrelines

red

CENTER2

0.18

CentreLine and frames in


each view from drawing

_G Tank lines

211

CENTER2

0.18

Tanks delimitation

Name

_G Symbols

white

CONTINUOUS

0.18

_G Dimensioning

Red

CONTINUOUS

0.18

_G Item Number

white

CONTINUOUS

0.25

Red

CONTINUOUS

0.35

_G Holds

Red

CONTINUOUS

0.35

_G Break_Line

white

PHANTOM2

0.25

red

CONTINUOUS

0.18

magenta

CONTINUOUS

0.25

White

CONTINUOUS

0.25

_G Revision - X

_G Hatch

_G Viewports
_General

X means revision status. A layer is to be created for each revision.


2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010

File name: PES-MD-P001_A - Draughting Procedure.doc

Description
Used to write texts with font
height = 1.8 mm
Used to write texts with font
height = 2.5 mm
Used to write texts with font
height = 3.5 mm
Used to write texts with font
height = 5 mm
Used to write texts with font
height = 7 mm
Used to write texts with font
height = 10 mm
Borders; Title Block;
Revision Blocks; Note;
External References;
Property Stamp; Key Plan;
Legend; List of Materials

Used to store blocks of


drawing: tolerance, weld,
roughness, section symbol,
etc
Used to draw the
dimensions
Used for storing item
number blocks
Used for storing the revision
symbols
Used for storing the hold
symbols
Used for plotting the
drawing of break lines
Used to show hatched areas
within the design field when
plotting drawings
Used to draw on the
viewport line layout aids
work;

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
41 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Hull
Colour
(By Layer)

Line Type
(By Layer)

Width
(By Layer)

Description

H Stiffeners

green

CONTINUOUS

0.25

Draughting of stiffeners;

H Stiffeners Hidden I

green

DASHED

0.25

DASHED2

0.25

CONTINUOUS

0.50

Draughting of web frame;

CENTER

0.50

Draughting of web frame


(opposite);

CONTINUOUS

0.25

Draughting of edge;

CONTINUOUS

0.50

CONTINUOUS

0.25

HIDDEN

0.35

CONTINUOUS

0.50

DASHEDX2

0.50

Name

H Stiffeners Hidden II
H Web frame
H Web frame Hidden

green
green
green

H Edge

green

H Visible WT
Bulkhead

green

H WT Bhd Hidden
Double
H WT Bhd Hidden
Simple
H Visible NWT
Bulkhead

green

green

green
green

H NWT Bhd Hidden

Draughting of stiffeners
(opposite);
Draughting of stiffeners
(opposite);

Draughting of visible
watertight bulkhead;
Draughting of invisible
watertight bulkhead (double
line menu draw multiline);
Draughting of invisible
watertight bulkhead (simple
line);
Draughting of visible nonwatertight bulkhead;
Draughting of visible nonwatertight bulkhead
(opposite);

H Pillars

green

CONTINUOUS

0.25

Draughting of pillars;

H Shell

green

CONTINUOUS

0.50

Draughting of shell;

CONTINUOUS

0.25

Draughting of holes;

H Stairwell Manholes
Hatch openings

red

H Plate Seams

red

CONTINUOUS

0.25

Draughting of plate seams;

H Knuckle Lines

green

DASHDOT

0.25

Draughting of knuckle lines;

0.18

Draughting of additional
structure;

H Additional Structure

cyan

CONTINUOUS

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
42 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Arrangements
Colour
(By Layer)

Line Type
(By Layer)

Width
(By Layer)

A WT Bulkhead

magenta

CONTINUOUS

0.5

A WT Bulkhead
hidden

magenta

DASHED

0.35

A NWT Bulkhead

40

CONTINUOUS

0.5

A NWT Bulkhead
hidden

41

DASHED

0.35

A Stairwell Manholes
Hatch openings

yellow

CONTINUOUS

0.25

A Stairwell Manholes
Hatch openings above

yellow

CENTER2

0.25

Name

Description
Draughting of visible
watertight bulkhead in
arrangement drawings;
Draughting of hidden
watertight bulkhead in
arrangement drawings;
Draughting of visible nonwatertight bulkhead in
arrangement drawings;
Draughting of hidden nonwatertight bulkhead in
arrangement drawings;
Draughting of stairwell/
manhole/hatch openings
Draughting of stairwell/
manhole/hatch openings
above the current deck

A Stairs Platforms
Walkways Railing
A Doors Portholes
Windows
A Lining Ceiling and
Partition Bulkheads

160

CONTINUOUS

0.25

yellow

CONTINUOUS

0.25

80

CONTINUOUS

0.25

A Insulation

white

CONTINUOUS

0.25

Draughting of insulation

A Furniture

131

CONTINUOUS

0.25

Draughting of furniture

A Sanitary

131

CONTINUOUS

0.25

Draughting of sanitary cabins

white

CONTINUOUS

0.18

41

CONTINUOUS

0.50

yellow

CONTINUOUS

0.50

white

CONTINUOUS

0.25

yellow

CONTINUOUS

0.25

A Manoeuvring
Equipment

yellow

CONTINUOUS

0.50

A Deck Equipment

yellow

CONTINUOUS

0.25

A Electrical Equipment

yellow

CONTINUOUS

0.25

A Navigation
Searching
Communication Equip.

white

Continuous

0.5

A Special Equipment

white

Continuous

0.5

A Machinery
Equipment

grey

Continuous

0.5

A Stair Indication
A Foundation &
support
A Manholes Hatch
A Floor & Deck
Covering
A Propulsion
(thrusters etc)

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Draughting railings
Draughting of windows and
portholes
Draughting of lining, ceiling
and partition bulkheads

Draughting of stairs indication


symbols
Draughting of foundation and
supports
Draughting of hatches and
manholes
Draughting of floor and deck
covering
Draughting of propulsion
equipment
Draughting of Rudder,
Steering Gear, Stabilizers,
dynamic positioning system
Draughting deck equipment
Draughting electrical
equipment
Draughting of Radar plants,
GPS, GMDSS, EPIRBS,
VHF/UHF, etc.
Draughting of Drilling,
Dredging, Diving, De-icing,
Seismic, Laboratory equip.
Draughting of equipment in
machinery rooms

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
43 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Piping & Ducting


Colour
(By Layer)

Line Type
(By Layer)

Width
(By Layer)

Description

P Chilled Water

31

Continuous

0.5

Chilled water

P Sanitary supply

182

Continuous

0.5

Sanitary supply

P Sanitary discharge

211

Continuous

0.5

Sanitary discharge

P Fuel Oil

41

Continuous

0.5

Fuel oil

P Waste oil

242

Continuous

0.5

Waste oil

P Lube Oil

40

Continuous

0.5

Lube oil

P Sea Water

Blue

Continuous

0.5

Sea water

P Cooling Water-HT

166

Continuous

0.5

HT Cooling water

P Cooling-Water-LT

74

Continuous

0.5

LT Cooling water

P Fresh Water

Cyan

Continuous

0.5

Fresh water

P Starting Air

254

Continuous

0.5

Starting air

P Service & Control


Air

70

Continuous

0.5

Service & Control


Compressed Air

P Exhaust

33

Continuous

0.5

Exhaust gas

Grey

Continuous

0.5

Steam condensate and feed


water

202

Continuous

0.5

Distilled fresh water

32

Continuous

0.5

Pneumatic valve remote


control

P Ballast

121

Continuous

0.5

Ballast system

P Bilge

123

Continuous

0.5

Bilge system

P Scupper Pipes

80

Continuous

0.5

Scupper system

P Fire water

Red

Continuous

0.5

Fire fighting with water

P Fire CO2

245

Continuous

0.5

Fire fighting with CO2

White

Continuous

0.5

Fire fighting with Foam

P Air and Sounding

30

Continuous

0.5

Overflow Pipes Systems;

P Hydraulic

251

Continuous

0.5

Name

P Steam Condensate
& Feed Water
P Distilled Fresh water
storage
P Pneum. Valves
Remote Control

P Fire Foam

P Thermal Oil

P Air Conditioning

White

Continuous

0.5

Heating Oil Treatment


Systems; Heating Oil
distribution Systems for ER
and Outside ER

- blue for
supply air;
- green for
exhaust air;
- red for return
air.

Continuous

0.5

Air Conditioning ducts

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
44 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001
P Ventilation
accommodation
P Ventilation holds
technical

P Ventilation
Machinery

P Heating
P Process systems

- green for
exhaust air;
- blue for
supply air;
- green for
exhaust air;
- blue for
supply air;
- green for
exhaust air;
- red for return
air.

Rev

Continuous

0.5

Ventilation in accommodation

Continuous

0.5

Ventilation in holds and


technical spaces

Continuous

0.5

Ventilation in machinery
rooms

White

Continuous

0.5

Heating system

200

Continuous

0.5

Process systems

Electrical
Name

E Automation Systems
for Machinery

E Fire Detection and


Alarm
E Common electric
and Electronic

Colour
(By Layer)

Line Type
(By Layer)

Width
(By Layer)

blue

Continuous

0.5

green

Continuous

0.5

white

Continuous

0.5

Description
Main and Maneuvre
consoles; Common
Automation Equipment
Engine Room Alarm
Systems; Automation
Equipment for Boilers, Motor /
turbo Aggregates, other
Machinery Components; etc
Electric Devices: Detectors,
Manual Call Point, etc.
Common computer Systems
Generators / Alternators;
Transformers; Battery and
Chargers; Rectifiers and
Converters; Electric Shore
Supply Systems;
Main Switchboards;
Emergency Switchboards;
Distribution panels and
Boards; Group Starters;

E Electric Power
Supply

cyan

Continuous

0.5

E Common Electric
Distribution

white

Continuous

0.5

132

Continuous

0.5

Cable trays for power system

Magenta

Continuous

0.5

Low voltage cable trays

Red

Continuous

0.5

High voltage cable trays

Yellow

Continuous

0.5

White

Continuous

0.5

E Cable Trays - Power


E Cable Trays - Low
voltage
E Cable Trays - High
voltage
E Cable Trays - control
& instrumentation
E Electric Consumer
Systems

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Control and instrumentation


cable trays/lines
Electric Lighting Systems for
Engine and Boiler room,
Accommodation, Deck and
Cargo Holds

Project Name:

PROJECT ENGINEERING SYSTEM

Sheet
45 of 45

DRAUGHTING PROCEDURE
Title:
Document No: PES-MD-P001

Rev

Fire & Safety


Colour
(By Layer)

Line Type
(By Layer)

Width
(By Layer)

white

CONTINUOUS

0.18

Fire & Safety

FS Rating A60

240

CONTINUOUS

0.5

Fire & Safety

FS Rating A30

90

CONTINUOUS

0.5

Fire & Safety

FS Rating A0

magenta

CONTINUOUS

0.5

Fire & Safety

FS Rating B15

52

CONTINUOUS

0.5

Fire & Safety

FS Rating B0

40

CONTINUOUS

0.5

Fire & Safety

Name
FS F & S Symbols

2010, ICEPRONAV
Form Code PES-AD-T001 Rev. A / May 2010
File name: PES-MD-P001_A - Draughting Procedure.doc

Description

S-ar putea să vă placă și