Sunteți pe pagina 1din 8

CEBU POWER PLANT PROJECT

COMMISSIONING TEST RECORD


Item No. :

Equipment :

System :

COMMISSIONING CHECK SHEET


No.

Description

Specification

Remarks

1. Electric Motor Manufacturer


Type
Serial Number
Protection Class
Output (kW)
Voltage / Phase / Herz
Current (A) at full load
Speed (rpm)
Connection Method
Manufacturer
Type
Serial Number
Rated Capacity (/h)
Total Head (m)
Speed (rpm)

2. Pump

No.

Acceptance Recording
Criteria
/Check

Check Point

Witness

Remarks

1. Motor
Name Plate Rating
Voltage
Frequency

Visual
10%
0.04
Connection with the motor with main terminal box drawing.
Visual
All Gaskets
Visual
All bolts and nuts
Visual
Check oil level for oil lubricated
Visual
Foreign materials and general cleanliness in motor
Visual
Switch on of the space heater when motor is stop
Visual
Megohmmeter (applying 1000 V)
100 M-ohm
The rotor turns freely
Visual
Rotation ( Viewed from load side)
C.W

2. Pump
Alignment between
pump and motor

Parallel
Angular

Complete Installation
Other accessories installation
Foundation bolts
Check Line-Up to Suction
All bolts and nuts
Suction Valve
Discharge Valve
Prime
Flushing, Sealing is available
Check Level for Lube Oil

Certified by
Test Executor

Name

0.1mm '(T.I.R)

0.05mm
Visual
Visual
Visual
Visual
Visual
Open
Visual
Visual
Visual
Visual

Signature

Date

DOOSAN
KEPCO SPC

7-1. Test Data Sheet for Motor Solo Run Test.

CEBU POWER PLANT PROJECT


MOTOR SOLO RUN TEST RECORD
Item No.

Equipment

System

Manufacturer

Starting Current (A)

Output (KW)

Rated Current (A)

Temperature (deg.C)

Voltage (V)

Motor Speed (rpm)

Humidity (%)

Description

Rotation Direction
(Viewed from load side)

Noise Level(dB A)
Vibration
(mm/sec. RMS)

No.

Criteria

Serial No.

Recording

Remarks

Vertical (DE/NDE)
Horizontal (DE/NDE)
Axial (DE/NDE)

Item

Time(min)

30

60

90

120

150

180

210

240

Remarks

"R" Phase
Current (A)
(No load)

"S" phase
"T" Phase

Motor
Temp' (deg.C)

DE Side
NDE Side

Test Start Time

Logging Start Time

Logging End Time

Remarks:

<Measure Point>

Certified by
Test Executor
DOOSAN

Name

Signature

Date

KEPCO SPC

CEBU POWER PLANT PROJECT


COMMISSIONING TEST RECORD
Item No. :

Equipment :

System :

PUMP LOAD TEST RECORD


No.

Check Time
Check Item
Pressure
(Bar G)

Vibration
(mm/sec. RMS)

Temp. ()

Motor
Pump

Motor

Pump

Current (A)
at Full Load

5
6
7

Ambient Temp. ()
Noise Level (dB(A))
Revolution (rpm)

0 min.

Suction
Discharge
TDH (Bar)
NDE
DE
NDE
DE
"V" (NDE/DE)
"H" (NDE/DE)
"A" (NDE/DE)
"V" (DE/NDE)
"H" (DE/NDE)
"A" (DE/NDE)
"R" Phase
"S" Phase
"T" Phase

30 min.

60 min.

90 min. 120 min. Remarks

= Dis.- Suc.

/
/
/
/
/
/

/
/
/
/
/
/

/
/
/
/
/
/

/
/
/
/
/
/

/
/
/
/
/
/

at 1 m distance

"U" Phase
"U" Phase Spare
"V" Phase
Motor
Winding Temp () "V" Phase Spare
"W" Phase
"W" Phase Spare
Flow Rate (t/hr)

Remarks :

Start Time ;

Logging Start Time ;

<Measure Point>

Certified by
Test Executor

Name

Signature

Date