Federal Register / Vol. 73, No.

25 / Wednesday, February 6, 2008 / Notices 6953

Docket Nos. D. Bose, Secretary, Federal Energy elevation of approximately 4,254 feet
Regulatory Commission, 888 First ASL. Currently, water entering Lake
FPL Energy Oliver Wind II, EG08–4–000 Street, NE., Washington, DC 20426. Abert remains in Lake Abert until it
LCC. Comments, protests and interventions evaporates, i.e. Lake Abert occurs
Marble River, LLC .................. EG08–5–000 may be filed electronically via the within a closed topographic basin with
Santa Rosa Energy Center, EG08–6–000 Internet in lieu of paper; see 18 CFR no outlets. Lake Abert has an
LLC.
385.2001(a)(1)(iii) and the instructions approximate storage capacity of 400,000
Long Beach Peakers LLC ...... EG08–7–000
Plum Point Energy Associ- EG08–8–000 on the Commission’s Web site under the acre-feet.
ates, L.L.C. ‘‘e-Filing’’ link. The Commission A new 45-mile-long 128-kV
Wharton County Generation, EG08–9–000 strongly encourages electronic filings. transmission line will be constructed to
LLC. Please include the project number (P– interconnect the proposed project with
Macquarie Bank Limited ........ FC08–1–000 13054–000) on any comments or an existing Bonneville Power
motions filed. Administration 500-kV, AC
Take notice that during the month of The Commission’s Rules of Practice transmission line located northwest of
December 2007, the status of the above- and Procedure require all intervenors Lake Abert. This interconnection will
captioned entities as Exempt Wholesale filing documents with the Commission link the proposed project with the both
Generators or Foreign Utility Companies to serve a copy of that document on the California-Nevada and Pacific
became effective by operation of the each person in the official service list Northwest power grids. A new
Commission’s regulations. 18 CFR for the project. Further, if an intervenor substation would be constructed at the
366.7(a). files comments or documents with the point of interconnection. The proposed
Commission relating to the merits of an project would have an annual
Kimberly D. Bose, issue that may affect the responsibilities generation of 489.1 GWh.
Secretary. of a particular resource agency, they k. Location of Applications: A copy of
[FR Doc. E8–2109 Filed 2–5–08; 8:45 am] must also serve a copy of the document the application is available for
BILLING CODE 6717–01–P on that resource agency. inspection and reproduction at the
j. Description of Existing Facilities Commission in the Public Reference
and Proposed Project: The proposed Room or may be viewed on the
DEPARTMENT OF ENERGY Abert Rim Pumped Storage Project will Commission’s Web site at http://
consist of the existing Mule Lake, which www.ferc.gov using the ‘‘eLibrary’’ link.
Federal Energy Regulatory is an existing small lake, and Lake Enter the docket number excluding the
Commission Abert, which is an existing alkali lake. last three digits in the docket number
[Project No. 13054–000] Both water bodies are located on BLM field to access the document. For
lands. Under the proposed project, Mule assistance, call toll-free 1–866–208–
Nt Hydro; Notice of Application Lake Reservoir and Lake Abert will be 3676 or e-mail
Accepted for Filing and Soliciting connected by a 6,200 foot-long pipeline FERCOnlineSupport@ferc.gov. For TTY,
Comments, Protests, and Motions To consisting of two eight-foot-diameter call (202) 502–8659. A copy is also
Intervene steel pipes with a hydraulic capacity of available for inspection and
approximately 700 cubic feet per second reproduction at the address in item g
January 30, 2008. (cfs) each. The pipeline will include a above.
Take notice that the following 6,200-foot-long tunnel immediately l. Individuals desiring to be included
hydroelectric application has been filed below Abert Rim Wilderness Study on the Commission’s mailing list should
with the Commission and is available Area. A powerhouse/pumphouse will be so indicate by writing to the Secretary
for public inspection: located near the shore of Lake Abert, of the Commission.
a. Type of Application: Preliminary containing two 67 megawatt (MW)/700 m. Competing Preliminary Permit—
Permit. cfs pump-turbines, and appurtenant Anyone desiring to file a competing
b. Project No.: 13054–000. facilities. The powerhouse/pumphouse application for preliminary permit for a
c. Date filed: October 22, 2007. would be a metal building with a proposed project must submit the
d. Applicant: NT Hydro. concrete foundation, approximately competing application itself, or a notice
e. Name and Location of Project: The 120-foot-wide by 60-foot-long and 30- of intent to file such an application, to
proposed Abert Rim Pumped Storage foot-high. the Commission on or before the
Hydroelectric Project would be located Mule Lake, which stores runoff from specified comment date for the
in Lake County, Oregon and would intermittent streams, has a normal particular application (see 18 CFR 4.36).
utilize the existing Mule Lake and Lake maximum water surface elevation of Submission of a timely notice of intent
Albert, both located on U.S. Bureau of approximately 5,605 feet above sea level allows an interested person to file the
Land Management (BLM) land. (ASL). USGS topographic data indicate competing preliminary permit
f. Filed Pursuant to: Federal Power that Mule Lake occurs within a closed application no later than 30 days after
Act, 16 U.S.C. 791(a)–825(r). basin, with no outlet streams. Currently, the specified comment date for the
g. Applicant contact: Mr. Ted Mule Lake has an approximate storage particular application. A competing
Sorenson, Sorenson Engineering, 5203 capacity of 1,600 acre-feet. Under the preliminary permit application must
South 11th, East Idaho Falls, ID 83404, proposed project, storage in Mule Lake conform with 18 CFR 4.30(b) and 4.36.
(208) 522–8069. would be increased to about 4,000 acre- n. Competing Development
h. FERC Contact: Tom Papsidero, feet by increasing the lake level 20 feet. Application—Any qualified
(202) 502–6002. Because Mule Lake is in a closed basin, development applicant desiring to file a
i. Deadline for filing comments, no new dam would be required to competing development application
pwalker on PROD1PC71 with NOTICES

protests, and motions to intervene: 60 increase the lake level and storage. Lake must submit to the Commission, on or
days from the issuance date of this Abert, which receives water from before a specified comment date for the
notice. Chewaucan River, various springs and particular application, either a
All documents (original and eight intermittent runoff streams, has a competing development application or a
copies) should be filed with: Kimberly normal maximum water surface notice of intent to file such an

VerDate Aug<31>2005 18:21 Feb 05, 2008 Jkt 214001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\06FEN1.SGM 06FEN1
6954 Federal Register / Vol. 73, No. 25 / Wednesday, February 6, 2008 / Notices

application. Submission of a timely copy must be sent to Director, Division should submit an original and 14 copies
notice of intent to file a development of Hydropower Administration and of the protest or intervention to the
application allows an interested person Compliance, Federal Energy Regulatory Federal Energy Regulatory Commission,
to file the competing application no Commission, at the above-mentioned 888 First Street, NE., Washington, DC
later than 120 days after the specified address. A copy of any notice of intent, 20426.
comment date for the particular competing application or motion to This filing is accessible on-line at
application. A competing license intervene must also be served upon each http://www.ferc.gov, using the
application must conform with 18 CFR representative of the Applicant ‘‘eLibrary’’ link and is available for
4.30(b) and 4.36. specified in the particular application. review in the Commission’s Public
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, state, Reference Room in Washington, DC.
must specify the exact name, business and local agencies are invited to file There is an ‘‘eSubscription’’ link on the
address, and telephone number of the comments on the described application. Web site that enables subscribers to
prospective applicant, and must include A copy of the application may be receive e-mail notification when a
an unequivocal statement of intent to obtained by agencies directly from the document is added to a subscribed
submit, if such an application may be Applicant. If an agency does not file docket(s). For assistance with any FERC
filed, either a preliminary permit comments within the time specified for Online service, please e-mail
application or a development filing comments, it will be presumed to FERCOnlineSupport@ferc.gov, or call
application (specify which type of have no comments. One copy of an (866) 208–3676 (toll free). For TTY, call
application). A notice of intent must be agency’s comments must also be sent to (202) 502–8659.
served on the applicant(s) named in this the Applicant’s representatives. Comment Date: 5 p.m. Eastern Time on
public notice. February 19, 2008.
p. Proposed Scope of Studies under Kimberly D. Bose,
Permit—A preliminary permit, if issued, Secretary. Kimberly D. Bose,
does not authorize construction. The [FR Doc. E8–2117 Filed 2–5–08; 8:45 am] Secretary.
term of the proposed preliminary permit BILLING CODE 6717–01–P [FR Doc. E8–2114 Filed 2–5–08; 8:45 am]
would be 36 months. The work BILLING CODE 6717–01–P
proposed under the preliminary permit
would include economic analysis, DEPARTMENT OF ENERGY
preparation of preliminary engineering DEPARTMENT OF ENERGY
plans, and a study of environmental Federal Energy Regulatory
impacts. Based on the results of these Commission Federal Energy Regulatory
studies, the Applicant would decide [Docket Nos. EL00–95–204, EL00–98–189]
Commission
whether to proceed with the preparation [Project No. 1951–151]
of a development application to San Diego Gas & Electric Company v.
construct and operate the project. Sellers of Energy and Ancillary Georgia Power Company; Notice of
q. Comments, Protests, or Motions to Services; Investigation of Practices of Application for Amendment of License
Intervene—Anyone may submit the California Independent System and Soliciting Comments, Motions To
comments, a protest, or a motion to Operator and the California Power Intervene, and Protests
intervene in accordance with the Exchange; Notice of Filing
requirements of Rules of Practice and January 29, 2008.
Procedure, 18 CFR 385.210, .211, .214. January 30, 2008. Take notice that the following
In determining the appropriate action to Take notice that on January 29, 2008, hydroelectric application has been filed
take, the Commission will consider all Conectiv Energy Supply, Inc. and the with the Commission and is available
protests or other comments filed, but California Parties filed a joint for public inspection:
only those who file a motion to compliance filing in response to the a. Application Type: Non-Project Use
intervene in accordance with the Commission’s January 4, 2008 Order. of Project Lands and Waters.
Commission’s Rules may become a Any person desiring to intervene or to b. Project No: 1951–151.
party to the proceeding. Any comments, protest this filing must file in c. Date Filed: October 1, 2007.
protests, or motions to intervene must accordance with Rules 211 and 214 of d. Applicant: Georgia Power
be received on or before the specified the Commission’s Rules of Practice and Company.
comment date for the particular Procedure (18 CFR 385.211, 385.214). e. Name of Project: Sinclair
application. Protests will be considered by the Hydroelectric Project.
r. Filing and Service of Responsive Commission in determining the f. Location: On the Oconee River, in
Documents—Any filings must bear in appropriate action to be taken, but will Hancock, Baldwin, and Putnam
all capital letters the title not serve to make protestants parties to counties, Georgia.
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT the proceeding. Any person wishing to g. Filed Pursuant to: Federal Power
TO FILE COMPETING APPLICATION’’, become a party must file a notice of Act, 16 U.S.C. 791a–825r.
‘‘COMPETING APPLICATION’’, intervention or motion to intervene, as h. Applicant Contact: Lee Glenn, Lake
‘‘PROTEST’’, or ‘‘MOTION TO appropriate. Such notices, motions, or Resources Manager, 125 Wallace Dam
INTERVENE’’, as applicable, and the protests must be filed on or before the Road NE., Eatonton, GA 31024; (706)
Project Number of the particular comment date. Anyone filing a motion 485–8704.
application to which the filing refers. to intervene or protest must serve a copy i. FERC Contact: Gina Krump,
Any of the above-named documents of that document on the Applicant and Telephone (202) 502–6704, and e-mail:
must be filed by providing the original all the parties in this proceeding. Gina.Krump@ferc.gov.
pwalker on PROD1PC71 with NOTICES

and the number of copies provided by The Commission encourages j. Deadline for filing comments,
the Commission’s regulations to: The electronic submission of protests and motions to intervene, and protest:
Secretary, Federal Energy Regulatory interventions in lieu of paper using the February 29, 2008.
Commission, 888 First Street, NE., ‘‘eFiling’’ link at http://www.ferc.gov. All documents (original and eight
Washington, DC 20426. An additional Persons unable to file electronically copies) should be filed with: Kimberly