Sunteți pe pagina 1din 3

4856 Federal Register / Vol. 73, No.

18 / Monday, January 28, 2008 / Notices

minutes for those speakers who sign up Pennsylvania and Frederick County, use of eminent domain and how to
to speak. Those members of the public Maryland. The EA will be used by the participate in the Commission’s
interested in submitting written Commission in its decisionmaking proceedings. It is available for viewing
comments may do so at the address process to determine whether the on the FERC Internet Web site (http://
indicated above by Monday, January 28, project is in the public convenience and www.ferc.gov).
2008. necessity.
Records are kept of all Board This notice announces the opening of Summary of the Proposed Project
proceedings and are available for public a second scoping period (due to changes On August 29, 2007, we issued a
inspection at the Office of the White in the project and design) that will be Notice of Intent to Prepare an
House Initiative on Tribal Colleges and used to gather environmental input from Environmental Assessment for the
Universities, U.S. Department of the public and interested agencies on Proposed Storage Factory Project,
Education, 1990 K Street, NW., the project. Your input will help the Request for Comments on
Washington, DC 20006, during the Commission staff determine which Environmental Issues, and Notice of
hours of 8 a.m. to 5 p.m., Eastern issues need to be evaluated in the EA. Public Scoping Meetings and Site Visit.
Standard Time, Monday through Friday. Please note that the scoping period will At the time of that Notice, the project
Electronic Access to this Document: close on February 19, 2008. facilities were all in Pennsylvania.
You may view this document, as well as Comments may be submitted in Subsequently, Dominion made
all other documents of this Department written or verbal form. Further details modifications to its project design,
published in the Federal Register, in on how to submit written comments are which have resulted in the removal of
text or Adobe Portable Document provided in the Public Participation some facilities and the addition of
Format (PDF) on the Internet at the section of this notice. In lieu of sending others. The current configuration of the
following site: http://www.ed.gov/news/ written comments, you may choose to proposed facilities is detailed below.
federegister. attend the public scoping meeting The Storage Factory Project would
To use PDF you must have Adobe scheduled as follows: involve the leaching of two salt caverns
Acrobat Reader, which is available free and placing the first cavern in service by
at this site. If you have questions about Date and time Location 2014. The project consists of
using PDF, call the U.S. Government constructing leaching/pumping
Printing Office (GPO), toll free at 1–888– Wednesday, February Middletown Middle
facilities, a brine processing facility,
6, 2008, 7 p.m. to 9 School, 100 High
293–6498; or in the Washington, DC, p.m. (EST). Street, Middletown, water and brine pipelines, and a new
area at (202) 512–1530. MD 21769, Tele- compressor station for gas storage
Note: The official version of this document phone: (240) 236– injection/withdrawal purposes in Tioga
is the document published in the Federal 4200. County, Pennsylvania. Alternative water
Register. Free Internet access to the official sources for leaching of the salt caverns
edition of the Federal Register and the Code This notice is being sent to affected are also being investigated. Dominion is
of Federal regulations is available on GPO landowners; Federal, State, and local also proposing piping upgrades to its
Access at: http://www.gpoaccess.gov/nara/ government representatives and existing Sabinsville Storage Pool in
index.html. agencies; environmental and public Tioga County. In addition, Dominion
interest groups; Native American tribes; proposes construction of a new 14,000
Diane Auer Jones,
other interested parties in this horsepower compressor station
Assistant Secretary, Office of Postsecondary proceeding; and local libraries and (Middletown Compressor Station)
Education.
newspapers. We 1 encourage located off of Marker Road
[FR Doc. E8–1364 Filed 1–25–08; 8:45 am] government representatives to notify approximately two miles west of
BILLING CODE 4000–01–P
their constituents of this planned Middletown in Frederick County,
project and encourage them to comment Maryland.
on their areas of concern. As part of its modifications, Dominion
DEPARTMENT OF ENERGY If you are a landowner receiving this has removed the proposed additional
notice, you may be contacted by a compression at Dominion’s existing
Federal Energy Regulatory Dominion representative about the Ardell Station located in Elk County,
Commission acquisition of an easement to construct, Pennsylvania and approximately 7.5
[Docket No. PF07–12–000] operate, and maintain the proposed miles of new 30-inch-diameter pipeline
project facilities. The pipeline company looping in Clinton County,
Dominion Transmission, Inc.; Notice of would seek to negotiate a mutually Pennsylvania.
Intent to Prepare an Environmental acceptable agreement. However, if the Dominion anticipates filing an
Assessment for the Proposed Storage project is approved by the Commission, application with the FERC after March
Factory Project, Request for that approval conveys with it the right 2008 and to seek the Commission’s
Comments on Environmental Issues, of eminent domain. Therefore, if approval in time for Dominion to begin
and Notice of Public Scoping Meetings easement negotiations fail to produce an construction by March 2009, with a
and Site Visit agreement, Dominion could initiate proposed in-service date of January
condemnation proceedings in 2014.
January 18, 2008.
accordance with State law. Project location maps are included in
The staff of the Federal Energy A fact sheet prepared by the FERC Appendix A.2
Regulatory Commission (FERC or entitled ‘‘An Interstate Natural Gas
Commission) will prepare an Facility on My Land? What Do I Need 2 The appendices referenced in this notice are not
mstockstill on PROD1PC66 with NOTICES

environmental assessment (EA) that will to Know?’’ addresses a number of being printed in the Federal Register. Copies of all
discuss the environmental impacts of typically asked questions, including the appendices are available on the Commission’s Web
the Storage Factory Project, involving site at the ‘‘eLibrary’’ link or from the Commission’s
Public Reference Room, 888 First Street, NE.,
construction and operation of facilities 1 ‘‘We’’ ‘‘us’’ and ‘‘our’’ refer to the environmental Washington, DC 20426, or call (202) 502–8371. For
by Dominion Transmission, Inc. staff of the Office of Energy Projects, part of the instructions on connecting to eLibrary refer to the
(Dominion) in Tioga County, Commission staff. ‘‘Additional Information’’ section of this notice.

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1
Federal Register / Vol. 73, No. 18 / Monday, January 28, 2008 / Notices 4857

Land Requirements for Construction Notice of Intent, we are requesting • Alternative leaching water sources.
The Storage Factory Project is in the public comments on the scope of the • Impacts on existing land uses.
preliminary planning stage. The precise issues that should be addressed in the • Visual impacts of the aboveground
facility design, pipeline route, rights-of- EA. We will consider all comments facilities on surrounding areas.
received during scoping in the • Impacts on local air and noise
way, and other details have not yet been
preparation of the EA. quality associated with construction and
finalized. Specific information on the
Our independent analysis and operation.
proposed project location and the land
evaluation of the issues will be included • Impacts on cultural resources.
used by it will be made available to the • Public safety and potential hazards
public when it is finalized. in the EA. The EA will also include
possible alternatives to the proposed associated with the transport of natural
Construction of the proposed project
project or portions of the project, and gas and the proposed compressor
would affect a total of about 190.03
we will make recommendations on how facilities.
acres during construction. Following
construction, about 87.13 acres would to lessen or avoid impacts on the Public Participation
be allowed to revert to its previous various resource areas of concern.
Depending on the comments received You can make a difference by
conditions. Disturbance associated with providing us with your specific
aboveground facilities would during the scoping process, the EA may
be published and mailed to Federal, comments or concerns about the project.
permanently impact 57.23 acres of land. By becoming a commenter, your
This includes the compressor station in State, and local agencies; elected
officials; environmental and public concerns will be addressed in the EA
Frederick County which would be and considered by the Commission.
located on approximately 11 acres interest groups; other interested parties;
affected landowners; Native American Your comments should focus on the
within a 135 acre site that Dominion is potential environmental effects of the
seeking to acquire. The land is currently tribes; libraries and newspapers; and the
Commission’s official service list for proposal, reasonable alternatives to the
used for agriculture. proposal (including alternative locations
Dominion proposes to construct the this proceeding. A 30-day comment
period will be allotted for review of the and routes), and measures to avoid or
pipelines associated with the lessen environmental impact. The more
Sabinsville Storage Pool in existing EA. We will consider all comments
submitted on the EA in any Commission specific your comments, the more useful
rights-of-way and it would seek a they will be. If you have already mailed
construction right-of-way width varying Order that is issued for the project.
We are currently involved in in comments in response to the initial
between 100-feet and 75-feet for the Notice for this project, your comments
pipelines associated with the leaching discussions with other jurisdictional
agencies to identify their issues and will still be considered and you do not
and proposed gas storage areas. need to resubmit your comments. Please
concerns. These agencies include the
The EA Process U.S. Army Corps of Engineers, U.S. Fish carefully follow these instructions to
For this project, the FERC staff has and Wildlife Service, Susquehanna ensure that your comments are received
initiated its National Environmental River Basin Commission, and in time and properly recorded:
Pennsylvania Department of • Send an original and two copies of
Policy Act (NEPA) review prior to
Environmental Protection. your letter to: Kimberly D. Bose,
receiving the application. The purpose
By this notice, we are asking these Secretary, Federal Energy Regulatory
of the Commission’s Pre-Filing Process
and other Federal, State, and local Commission, 888 First Street, NE.,
is to involve interested stakeholders
agencies with jurisdiction and/or Room 1A, Washington, DC 20426.
early in project planning and to identify
special expertise with respect to • Label one copy of the comments for
and resolve issues before an application
environmental issues to formally the attention of Gas Branch 1;
is filed with the FERC. A docket number • Reference Docket No. PF07–12–000;
(PF07–12–000) has been established to cooperate with us in the preparation of
the EA. Agencies that would like to • Mail your comments so that they
place information filed by Dominion, will be received in Washington, DC, on
and related documents issued by the request cooperating status should follow
the instructions for filing comments or before February 19, 2008.
Commission, into the public record. Please note that the Commission
Once a formal application is filed with provided below.
strongly encourages electronic filing of
the FERC, a new docket number will be Currently Identified Environmental comments. See 18 Code of Federal
established. The FERC will be the lead Issues Regulations (CFR) 385.2001(a)(1)(iii)
Federal agency for the preparation of the and the instructions on the
The EA will discuss impacts that
EA which will satisfy the requirements Commission’s Internet Web site at
could occur as a result of the
of NEPA. http://www.ferc.gov under the ‘‘eFiling’’
The NEPA requires the Commission construction and operation of the
proposed project. We have already link and the link to the User’s Guide.
to take into account the environmental Prepare your submission in the same
impacts that could result from an action identified several issues that we think
deserve attention based on a manner as you would if filing on paper
whenever it considers the issuance of a and save it to a file on your hard drive.
Certificate of Public Convenience and preliminary review of the project site
and the facility information provided by Before you can file comments you will
Necessity. NEPA also requires us to need to create an account by clicking on
discover and address concerns the Dominion. This preliminary list of
issues and potential impacts may ‘‘Login to File’’ and then ‘‘New User
public may have about proposals. This Account.’’ You will be asked to select
process is referred to as ‘‘scoping.’’ The change based on your comments and
our analysis. the type of filing you are making. This
main goal of the scoping process is to
• Impacts on perennial and filing is considered a ‘‘Comment on
focus the analysis in the EA on the
mstockstill on PROD1PC66 with NOTICES

intermittent streams and waterbodies. Filing.’’


important environmental issues. By this • Evaluation of temporary and The public scoping meeting (date,
permanent impacts on wetlands and time, and location is listed above) is
Copies of the appendices were sent to all those
receiving this notice in the mail. Requests for development of appropriate mitigation. designed to provide state and local
detailed maps of the proposed facilities should be • Effect on federally and State-listed agencies, interested groups, affected
made directly to Dominion. species. landowners, and the general public with

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1
4858 Federal Register / Vol. 73, No. 18 / Monday, January 28, 2008 / Notices

another opportunity to offer your For additional information, please the documents. Go to http://
comments on the project. Interested contact the Commission’s Office of www.ferc.gov/esubscribenow.htm.
groups and individuals are encouraged External Affairs at 1–866–208–FERC Finally, Dominion has established an
to attend the meeting and to present (3372). Internet Web site for this project at
comments on the environmental issues http://www.dom.com/about/gas-
Environmental Mailing List
they believe should be addressed in the transmission/storage/index.jsp. The
EA. A transcript of the meeting will be An effort is being made to send this Web site includes a project overview,
made so that your comments will be notice to all individuals, organizations, status, and answers to frequently asked
accurately recorded.3 and government entities interested in questions. You can also request
All public meetings will be posted on and/or potentially affected by the additional information by calling
the Commission’s calendar located at proposed project. This includes all Dominion at 1–888–882–5055.
http://www.ferc.gov/EventCalendar/ landowners who are potential right-of-
way grantors, whose property may be Kimberly D. Bose,
EventsList.aspx along with other related
used temporarily for project purposes, Secretary.
information.
Once Dominion formally files its or who own homes within distances [FR Doc. E8–1421 Filed 1–25–08; 8:45 am]
application with the Commission, you defined in the Commission’s regulations BILLING CODE 6717–01–P

may want to become an official party to of certain aboveground facilities. If you


the proceeding known as an do not return the attached form
‘‘intervenor.’’ Intervenors play a more (Appendix B), you will be removed from DEPARTMENT OF ENERGY
formal role in the process and are able the Commission’s environmental
mailing list. All individuals who Federal Energy Regulatory
to file briefs, appear at hearings, and be Commission
heard by the courts if they choose to provide written comments, attend the
appeal the Commission’s final ruling. scoping meeting, or return the ‘‘Keep on [Docket No. PF08–2–000]
An intervenor formally participates in a Mailing List Form’’ will remain on our
Commission proceeding by filing a environmental mailing list for this MarkWest Pioneer, L.L.C.; Notice of
request to intervene. Instructions for project. Intent To Prepare an Environmental
becoming an intervenor are included in Any individual who participated in Assessment for the Proposed Arkoma
the User’s Guide under the ‘‘e-filing’’ the first scoping period will remain on Connector Pipeline Project; and
link on the Commission’s Web site. our mailing list and does not need to Request for Comments on
Please note that you may not request mail back the enclosed ‘‘Keep on Environmental Issues
intervenor status at this time. You must Mailing List Form’’. This includes those
January 18, 2008.
wait until a formal application is filed who already have:
• Mailed in comments to FERC; The staff of the Federal Energy
with the Commission. Regulatory Commission (FERC or
• Mailed back the ‘‘Keep on the
Site Visit Mailing List Form’’ ; or Commission) will prepare an
• Attended the scoping meeting in environmental assessment (EA) that will
On February 6, 2008, the Office of discuss the environmental impacts of
Energy Projects staff will conduct a pre- Lawrenceville, Pennsylvania, on
September 18, 2007. the proposed Arkoma Connector
certification site visit of the proposed Pipeline Project which involves the
Middletown Compressor Station in Additional Information construction and operation of natural
Middletown, Maryland. We will view Additional information about the gas pipeline facilities in Coal, Atoka,
Dominion’s proposed compressor project is available from the and Bryan Counties, Oklahoma. This
station site and possibly alternative sites Commission’s Office of External Affairs notice announces the opening of the
that are being considered for the at 1–866–208–FERC (3372) or on the scoping period that will be used to
proposed project. Staff will tour these FERC Internet Web site (http:// gather environmental input from the
proposed project areas by automobile www.ferc.gov). Using the ‘‘eLibrary’’ public and interested agencies on the
and on foot. Representatives of link, select ‘‘General Search’’ from the project. Your input will help the
Dominion will accompany the OEP eLibrary menu, enter the selected date Commission staff determine which
staff. range and ‘‘Docket Number’’ excluding issues need to be evaluated in the EA.
All interested parties may attend the the last three digits (i.e., PF07–12), and Please note that the scoping period will
site visit. Those planning to attend must follow the instructions. For assistance close on February 20, 2008.
provide their own transportation. If you with access to eLibrary, the helpline can Comments may be submitted in
are interested in attending the site visit, be reached at 1–866–208–3676, TTY written form or verbally. Further details
please meet us at 1:30 p.m. at the (202) 502–8659, or at on how to submit written comments are
proposed Middletown Compressor FERCOnlineSupport@ferc.gov. The provided in the Public Participation
Station Site. The directions to the eLibrary link on the FERC Internet Web portion of this notice.
location of the proposed compressor site also provides access to the texts of If you are a landowner receiving this
station from Middletown, Maryland are formal documents issued by the notice, you may be contacted by a
as follows: Commission, such as orders, notices, pipeline company representative about
Take US–40–Alt West to Marker Road, turn and rule makings. the acquisition of an easement to
left. Travel on Marker Road about 1.5 miles In addition, the Commission now construct, operate, and maintain the
until you pass PL–1 pipeline and power offers a free service called eSubscription proposed facilities. MarkWest Pioneer,
lines. The proposed compressor station which allows you to keep track of all L.L.C. (MarkWest) would seek to
mstockstill on PROD1PC66 with NOTICES

property will be on your left (see Appendix formal issuances and submittals in negotiate a mutually acceptable
A map for location).
specific dockets. This can reduce the agreement. However, if the project is
3 We previously held a public scoping meeting on
amount of time you spend researching approved by the Commission, that
September 18, 2007, in Lawrenceville,
proceedings by automatically providing approval conveys with it the right of
Pennsylvania to address Dominion’s proposed you with notification of these filings, eminent domain. Therefore, if easement
facilities in Pennsylvania. document summaries and direct links to negotiations fail to produce an

VerDate Aug<31>2005 17:56 Jan 25, 2008 Jkt 214001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\28JAN1.SGM 28JAN1

S-ar putea să vă placă și