Generator Protection
100%-Stator-Ground-Fault
Protection
Presenter: Dr. Hans-Joachim Herrmann
PTD PA13
Phone +49 911 433 8266
E-Mail: Hans-Joachim.Herrmann@siemens.com
Power Automation
Basic Problem
Faults Close to the Star Point
Power Automation
Progress. Its that simple.
U0
V0 Displacement voltage
Power Automation
V0 3.Harm
(V03H<)
V0 3.Harm
(V03H>)
During an ground fault close to the star point the measured 3rd
harmonics reduces in the star point (V3.H <) and increases at the
terminals (V3.H >)
Power Automation
Power Automation
Measurements on a Generator
Power Automation
Progress. Its that simple.
2. Test device
7UM 61
V0
U 0Test device
I L 7UM7UM
1.
61 61
V0
IL
VL
G
606 Ohm
5250
100 V
?3
45 VA
5P20
800/5 A
6 MVA
5250 V
400 Rpm
6 MVA; Yd5
5,25/58,3 kV
60 kV
+
- 5%
Power Automation
Measurements on a Generator
Influence of the Active and Reactive Power
Power Automation
Progress. Its that simple.
Influence of the
active power is
visible
150-Hz-voltage in V
120
100
Approx. 15 V measured
without load
80
60
40
20
0
0
150 Hz at Q =
- 2 MVar
150 Hz at Q =
2 MVar
Release of the
protection function
at a determined
active power is
recommended
Active
in=MW
150Power
Hz at Q
0 MVar
150 Hz at Q =
4 MVar
Power Automation
Comparison of
Measuring Results
between Star Point
and Terminals
300
250
150-Hz-voltage in V
200
150
100
50
0
0
-50
10
12
-100
-150
Stator (0= star point; 10= terminal)
P 2 MW
P 3 MW
P 4 MW
P 5,6 MW
Fault Record
Switching OFF of a Generators during Full Load
Power Automation
Progress. Its that simple.
iL3
VL3
VE
3rd harmonics
drops
Power Automation
10
9.3
181
U03h
3rd harmonics
under load
5.58
knU
( 10 ?tan )
i
4
Pickup generator
overcurrent
protection
33.344
50
100
150
200
ta
i
250
300
350
312.6
Time
in ms
Zeit in ms
Power Automation
10
Logic Diagram
Power Automation
Progress. Its that simple.
Preferred
Connection:
Star point
(V3.H <)
Active power
and
minimum
voltage
release
Power Automation
11
Basic idea
max.
200 V
20 Hz
RE
I
Power Automation
12
U0
100 % protection range includes VTs and low side of unit transformer
13
Power Automation
14
Scheme Design
Gas Turbine with Neutral Transformer
Power Automation
Progress. Its that simple.
K17 +
Excitation
UErr
7XT33
1B1
7XT34
1B4
4A1
BE
Neutral
transformer
Current
transformer:
Direct order
at Ritz
KS60-03 Size 3
15VA Cl.1 FS5
400A R
L
5A
K
L
l
Wiring shielded
4A3
K18
Auxiliary
voltage
20-HzGenerator
20-HzBand pass
1A1
1A2
1A3
2A1
2A3
3A2
3A3
3A1
DC
+UH
-UH
AC
UL1
UL2
UL3
external
block
Device
ready
R13
max 200 V
7KG6
- 11 (Amplifier)
max. 10 cm
UE
R14
J8
J7
+ 12
TD3
+ 31
K13 +
- 32
K14
IEE1
TD1
Shunt: 10 A/ 150 mV
Power Automation
15
Replica:
ises
RE = Fault resistance
RE
20Hz
RB
CE
CE = Ground capacitance in
stator circuit
ises
Vses
1) Filtering
Vses
Fourierfilter
ises
I20 = Ir + jIi
(20Hz)
Yers
CE
RE
1
Yers =
+ j ? CE
RE
? I 20 ?
?
Re ?
?V 20 ?
Vr . Ir + Vi . Ii
V2r + V2i
RE =
V2r + V2i
Vr . Ir + Vi . Ii
Power Automation
16
1.989
a
f1
b
0
f1
1.733
10
20
30
40
50
60
f1
af1
2 ?? ?
cos
( f1
32
0.5) ? 1
bf1
sin
2 ?? ?
( f1
32
0.5) ? 1
f1
cos 2?? ?
f1
cos 2?? ?
70
63
0.5
64
0.5
64
Power Automation
17
Power Automation
18
Phase to ground
voltage
Displacement
voltage
Ground current
At the device
inputs are
small
secondary
values
The capacitive
current is visible.
This disturbance
current will be
eliminated by the
algorithm.
Power Automation
19
20-HzBandpass
1B1
RL
UN
?3
7XT34
7XT33
1B4
4A1
1A1
BI
500 V
1A4
1A3
Aux.
voltage
20-HzGenerator
4A3
Voltage
transformer
1A1
1A2
1A3
2A1
2A3
3A2
3A3
3A1
DC
+UH
-UH
7UM62
AC
UL1
UL2
UL3
external
Block
Device
ready
R13
R14
J8
CT Ratio 1: 1
Voltage transformer:
two pole isolated,
until VN saturation free
for 20 Hz should be Rps < 1000?
20s approx. 3 kVA
UE
IEE1
J7
Current transformer:
5P10 or 5P15 (or 5FS10)
1A secondary
CT Ratio: 1A/1A
(max. Ampere windings)
Power Automation
20
Two Stages
Back-up
overcurrent
Supervision
Calibration
Power Automation
21
Logic Diagram
Power Automation
Progress. Its that simple.
Power Automation
22