Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Power Transmission and Distribution

Communication in Substations with IEC 61850


Commissioning & Diagnostics
Markus Spangler, Siemens AG, PTD EA 13

02/2007

Power Transmission and Distribution

Recommended Commissioning and Diagnostic Tools


Power Automation

Progress. Its that simple.

1.) Networkview

to visualize all participants in the network

2.) WEB Monitor

to have access to commissioning aids supported


by SIPROTEC-devices
to communicate, based on MMS communication,
between client and server
to get or load the configuration file of the switch

3.) IEC Browser


4.) TFTP
5.) EN100 homepage
6.) module infodisplay

shows commisioning data, error data and statistic


data as well
shows module parameter

7.) SNMP
8) Ethereal
9.) Kema Analyzer/Observer
10.) PING
11.) Firmware update

05/2007

Power Transmission and Distribution

1.) Networkview

www.networkview.com

Power Automation

Progress. Its that simple.

Start\Programs\networkview

The program identifies all IP-addresses


Configurations can be saved and printed out
Direct access to all participants with right mouse-click via telnet or http

05/2007

Power Transmission and Distribution

1.) Networkview

www.networkview.com

Power Automation

Progress. Its that simple.

License:
The program can be run without any license (old version V 2.03)
There will be some hints that you are using an unregistered version
If you have a registered license, the key must be copied in installation-root
e.g. C:\program files\networkview\

05/2007

Power Transmission and Distribution

1.) Networkview

www.networkview.com

Power Automation

Progress. Its that simple.

Creating

a new file

File => New


Selection of the IP-address range

Remove the hooks for


quick processing

05/2007

Power Transmission and Distribution

The Online Mode


Power Automation

Progress. Its that simple.

Edit => Monitor Nodes ( adjust the scanning cycle for the polling of all
devices)
The recommended polling cycle (10 s ) depends on the no. of devices. The
shorter the polling time the higher the network data flow, i.e. if you have
200 devices you should set the polling time to 60-120 seconds.
The default timeout shouldnt be changed

05/2007

Power Transmission and Distribution

The Online Mode


Power Automation

Progress. Its that simple.

05/2007

Power Transmission and Distribution

The Online Mode / Recommendation for a fast switch


diagnosis
Power Automation

Progress. Its that simple.

05/2007

Power Transmission and Distribution

Expanding an existing Configuration


Power Automation

Progress. Its that simple.

This can be done only in offline mode:


Edit => Add node ( insert address or range of addresses for the new devices)

05/2007

Power Transmission and Distribution

2.) Web Monitor of SIPROTEC (directly or with


networkview)
Power Automation

Progress. Its that simple.

05/2007

10

Power Transmission and Distribution

3.) IEC Browser


Power Automation

Progress. Its that simple.

Start => Programs => IEC_Browser => IEC_Browser.exe

Files => Fault Records


Description of the switchgear with 5 logical devices:
CTRL Control

DR
EXT
MEAS
PROT

Disturbance Recorder
extended
Measurement
Protection
05/2007

11

Power Transmission and Distribution

3.) IEC Browser


Power Automation

Progress. Its that simple.

GGIO = user defined indications


LLN0 = common indication of logical node
LPHD = common indication of logical node
physical device
CILO = Control interlockings
CSWI = Control Switches
XCBR = class switching devices X; CBR=Q0

05/2007

12

Power Transmission and Distribution

3.) IEC Browser


Power Automation

Progress. Its that simple.

FC=
Functional
Constraint

CF
CO
DC
EX
RP
ST

= Configuration
= Control
= Description
= Extended definition
= Unbuffered report
= Status information

05/2007

13

Power Transmission and Distribution

3.) IEC Browser (Feedback DPI of Q1)


Power Automation

Progress. Its that simple.

01 = OFF

05/2007

14

Power Transmission and Distribution

3.) IEC Browser (Actualizing the information)


Power Automation

Progress. Its that simple.

Attention:
Please check the correct time stamp of all indications.
Only that information is valid and actual which
is allocated in DIGSI to system interface IEC61850
05/2007

15

Power Transmission and Distribution

3.) IEC Browser (Get fault records)


Power Automation

Progress. Its that simple.

05/2007

16

Power Transmission and Distribution

4.) TFTP Trivial File Transfer Program


Power Automation

Progress. Its that simple.

to get the configuration file of the switch

To get the file:


tftp 192.168.1.21 get config.csv c:\temp\config.csv
IP-Address
Destination Folder

For diagnosis (syslog.txt and crashlog.txt):


i.e. tftp 192.168.1.21 get syslog.txt c:\temp\syslog.txt
IP-Address
Destination Folder

Editing the config.csv


we recommend Excel
or notepad
05/2007

17

Power Transmission and Distribution

4.) TFTP Trivial File Transfer Program


Power Automation

Progress. Its that simple.

to load the configuration file to the switch


Attention:
In the switch (IP Services) the tftp-access must be
Enabled
To load the file:
tftp 192.168.1.21 put c:\temp\config.csv config.csv
IP-Address
Source Folder

For diagnosis (syslog.txt and crashlog.txt):


i.e. tftp 192.168.1.21 get syslog.txt c:\temp\syslog.txt
IP-Address
Destination Folder

Editing the config.csv


we recommend the
notepad-program
05/2007

18

Power Transmission and Distribution

5.) EN100 module homepage


Power Automation

Progress. Its that simple.

e.g. 192.168.1.99/home

05/2007

19

Power Transmission and Distribution

module-homepage Error Buffer


Power Automation

Progress. Its that simple.

05/2007

20

Power Transmission and Distribution

EN100-Homepage FEC-Statistics
Power Automation

Progress. Its that simple.

05/2007

21

Power Transmission and Distribution

FEC-Statistics
Power Automation

Progress. Its that simple.

RSTP-Role Chan1/2 = Alternate/Root


If theSIPROTEC 4 devices are arranged in a ring, and the ring is closed
and connected to the external switches which are also on, one device on
the FEC side must always display the above text. If none of the devices in
the ring does, the ring is physically broken.
FilterSymErrCntChan1/2 = 0/2753
If these two counters are incremented during stable operation of the
device, and with neither of the two adjacent devices turned off, there is a
poor FO connection. This can be due to an excessive attenuation by the
coupling devices, or to a defective cable.
FNS queue overflow = 0
If this display is not equal zero, this suggests that there are circulating
broadcast telegrams.
Frames Loss = 0
A value that is not zero indicates circulating multicast telegrams.

05/2007

22

Power Transmission and Distribution

Module-Homepage Dump
Power Automation

Progress. Its that simple.

05/2007

23

Power Transmission and Distribution

Modul-Homepage Print Buffer


Power Automation

Progress. Its that simple.

05/2007

24

Power Transmission and Distribution

Modul-Homepage Print Buffer


Power Automation

Progress. Its that simple.

All shown pages can be saved with the used Internet Browser as a HTML
file (e.g. for troubleshooting in case of failures)
05/2007

25

Power Transmission and Distribution

6. Diagnostic module informationpage


Power Automation

Progress. Its that simple.

Menu ->Test/Diagnostic -> moduleinfos ->


Port B

line 1 to 7 (network configuration)


same for EN100 optical and electric
7 Phy1 100 MBit Full-Duplex (electr. EN100)

Zeilen 8-10 (status of interface)


Zeilen 12 bis 21 (Parameter optical
interface)

see EN100 manual chapter 7.3 for


additional information

05/2007

26

Power Transmission and Distribution

7. SNMP
Power Automation

Progress. Its that simple.

possible with FW >= 3


SNMP:
Simple Network Management
Protocol
for displaying use a mib browser,
e.g. iReasoning
(www.ireasoning.com)
necessary file: SipEthernet.mib
MIB, Management
Information Base
download under
www.siprotec.com

IP-address

link Status

RSTP

05/2007

27

Power Transmission and Distribution

8. Ethereal
Power Automation

Progress. Its that simple.

Read

for

the Ethernetframes on the bus

investigating detailed ethernet knowledge is necessary

Ethereal

with GOOSE-Filter available

Freeware

05/2007

28

Power Transmission and Distribution

8. Ethereal
Power Automation

Progress. Its that simple.

05/2007

29

Power Transmission and Distribution

8. Ethereal
Power Automation

Progress. Its that simple.

1
2

10

3
5
6

7
8
9
05/2007

30

Power Transmission and Distribution

2
Power Automation

sending device

Progress. Its that simple.

10

1
4
6

05/2007

31

Power Transmission and Distribution

receiving device

Power Automation

Progress. Its that simple.

3
6

7
4

10

8
1
05/2007

32

Power Transmission and Distribution

System configurator properties


Power Automation

Progress. Its that simple.

4
5

05/2007

33

Power Transmission and Distribution

9.) KEMA Observer/Analyzer


Power Automation

Progress. Its that simple.

Read

the Ethernetframes on the bus

frame will be viewed in one line (Observer)

the

captured file can be investigated with the analyzer by our


development

The

Observer ist Freeware, the Analyzer costs more than 4.000,- EUR.

05/2007

34

Power Transmission and Distribution

KEMA UNICA Observer


Power Automation

Progress. Its that simple.

05/2007

35

Power Transmission and Distribution

KEMA UNICA Analyzer


Power Automation

Progress. Its that simple.

05/2007

36

Power Transmission and Distribution

10.) PING
Power Automation

Progress. Its that simple.

multiple transmission of ICPM Echo Requests

05/2007

37

Power Transmission and Distribution

Firmware update EN100 module


Power Automation

Progress. Its that simple.

1.) download the firmware of the relevant device under www.siprotec.com.


2.) the update will be done via Siprotec Firmware-update tool
3.) if updating an existing optical EN100 module with FW <= 3.04, an update of the
Bootfirmware to V01.02.04 has to be done first

05/2007

38

Power Transmission and Distribution

Firmware update Ruggedcom switches


Power Automation

Progress. Its that simple.

1.) download updatetool and firmware under www.ruggedcom.com


2.) insert the IP-addresses of the relevant switches or import from an existing table
3.) insert Admin-Passwort
4.) choose the firmware-file (.bin), start upload (if uploading a config-file (.csv), just one IPaddress possible)
05/2007

39

Power Transmission and Distribution

Backup the configuration Ruggedcom switches


Power Automation

Progress. Its that simple.

1.) in section Download tag the


data for backup
2.) select the destination folder

background:
Data backup and recovery
troubleshooting

05/2007

40