QC REF No.
::
DATE OF INSPECTION
::
ADMN. SANCTION
::
::
EXECUTING AGENCY
::
::
GRANT
::
ESTIMATE COST
::
TECHNICAL SANCTION
::
10 AGREEMENT NO.
::
::
12 TENDER PERCENTAGE
::
13 CONTRACTING AGENCY
::
::
::
16 AGREEMENT PERIOD
::
17 EXTENTION OF TIME
::
::
20 ITEMS INSPECTED
::
::
::
c) Asst.Exe. Engineer
:
::
22 Name of the Officers inspecting the wo ::
a) Executive Engineer
:
::
b) Dy. Executive Engineer :
::
c) Asst.Exe. Engineer
:
::
b) Dy. Executive Engineer
INPUTS
NOT TO PRINT- FOR DATA ENTRY ONLY
QC Ref.No:
20.11.2013
AEE2/PR(V&QC)Nlgd/BNRGSK/Kodad/2013-14,
date
21.10.2013
Dist.Collector Nalgonda Proc.No.G/EGS/3473/2011 dated 31.10.2011
Construction of BNRGSK Mandal Level Building at Kodad
Executive Engineer (PR) PRI Miryalaguda
Kodad
MGNREGS (BNRGSK)
Rs.25.00 Lakhs
EE PRI Miryalaguda DR.No. 108 /2011-12 dated
EE PRI Mrlg Agr.No. 5/MGNREGS/ Kodad/2011-12 Dt.02/04/2012
Rs.8,90,181.00
Estimate Rates.
Gram Panchayat Kodad
8/8/2011
5/7/2012
9 Months
N/A
Rs.24.52 Lakhs
Completed & Ready for Inauguration.
Foundations, RCC Plinth,Columns, Beams & Roof Slab, Brick Work &
Chajjas, Doors & Windows, Impervious Coat over Roof Slab, Painting,
Flooring & General Observations.
Asst.Executive Engineer 2,
::
DATE OF INSPECTION
:: 21.10.2013
::
ESTIMATE COST
:: Rs.25.00 Lakhs
:: MGNREGS (BNRGSK)
:: Kodad
EXECUTING AGENCY
CONTRACTING AGENCY
ITEMS COVERED
Foundations,
RCC
Plinth,Columns,
Beams & Roof Slab, Brick Work &
Chajjas,
Doors
&
Windows,
::
Impervious Coat over Roof Slab,
Painting,
Flooring
&
General
Observations.
Miryalaguda
INSPECTION REPORT
Construction of BNRGSK Mandal Level
Building at Kodad
::
Estimate Cost
:: Rs.25.00 Lakhs
Date of Inspection
:: 21.10.2013
a)
Executive Engineer
b)
c)
Asst.Exe. Engineer
a)
Executive Engineer
b)
c)
Asst.Exe. Engineer
a)
Admn.Sanction
b)
Estimate Sanction
c)
Rs.8,90,181.00
d)
Agreement Number
e)
Tender Percentage
Estimate Rates.
f)
g)
8/8/2011
h)
5/7/2012
i)
Agreement Period
9 Months
j)
N/A
Financial Progress
a)
Rs.24.52 Lakhs
b)
Physical Progress
a)
a)
Test reports for Building Materials are not furnished by the Field Staff.
b)
c)
d)
The Plinth level is only 1'-6'' height above GL , it should have been atleast 3'-00'' ht.
e)
2 Sets of Doors for Toilet Blocks is found un necessary, One Door is enough.
f)
The Windows on Staircase should have been glazed windows to have more ventilations & Lighting.
g)
The QC Register is not submitted by the field officer during the inspection.
ii
Mix design particulars are not furnished by the field staff for verification.
iii
The CC Cube test results are not furnished by the field staff for verification.
Asst.Executive Engineer 2,
To,
The Executive Engineer ,
PRI, Miryalaguda for taking necessary action.
Submitted to the Executive Engineer (PR) Vigilance & Quality Control Division Hyderabad for favour of
information.
block:::Kodad
="block:: "&inputs!D8&""
INSPECTION REPORT
Name of the Work :-
Estimate Cost
Rs.25.00 Lakhs
:-
Date of Inspection :
21.10.2013
I)
Sl.
No.
As per Design/
M.Book
As per
Observation
Depth of Foundation
1.65
1.70
0.15
0.15
Thickness of Footing
0.25
0.25
Size of Footing
1.30 x 1.30
1.60 x 1.30
Height of Pedastal
0.60
0.72
Size of Pedastal
0.60 x 0.60
0.62 x 0.62
Height of R.R.Masonry
1.10
1.10
0.30
0.30
General Observations:a
The physical measurements are tallying with the M.Book recordings & on upper side.
The Plinth level is only 1'-6'' height above GL , it should have been atleast 3'-00'' ht.
II)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
General Observations:a
The cantilever beams projecting over the brick wall should have been tapered towards out side.
III)
Brick Masonry:
i)
ii)
iii)
iv)
v)
vi)
Provided.
vii)
viii)
General Observations:a
The painting was paled out and white patches (waning) of painting is observed at one to two place
IV).
i)
ii)
iii)
iv)
Flooring:
Workman ship :
Verification of Area/ Room dimension :
Type of Flooring provided w.r.t . Sanctioned
Estimate/ M.Book :
Thickness of Bed Concrete :
General Observations:a
V.
i)
ii)
iii)
Verification of Hinges, Aldrops & Tower bolts : The quality is not good.
iv)
Workmanship :
Average.
v)
General Observations:a
VI)
Stair Case :-
ii)
iii)
iv)
i)
General Observations:a
The waist slab is only 10mm thick , it should have been 15cm thick atleast.
As per National Building Code of India 2005 the minimum tread & rise shall be 300mm x 150mm
& width of stair to be 2.0M for institutional buildings and the risers shall be limited to 12 per flight
VII
Roof Slab:
i)
Slab Dimenisions :
ii)
iii)
iv)
3" dia. PVC Pipes are provided for water drain out.
General Observations:a)
b)
c)
4" dia. PVC Pipes are should have been provided for efffective water drain out. It is desirable to
conserve rain water using suitable rain water harvesting techniques by roof water collection or
the rain-water pipes to be connected to a drain or sewer to the road gutter.
Further the rain water pipes at the scale of at least one pipe of 10 cm. diameter for every 40
sq.m. of roof area shall be provided and so arranged, jointed and fixed as to ensure that the rain
water is carried away from the building without causing dampness in any part of the walls.
Impervious coat of 20mm thick provided on slab but the slope for water drain out is not properly
executed..
General Observations:a
Cement mortar haunches are not provided at junction of roof & parapet .
As per National Building Code of India 2005, the Parapet shall not be less than 1.0 m and not
more than 1.2 m in height from the finished floor level.
IX.
Dimensions :
ii
Alignment :
iii
iv
General Observations:a
The top finishings are not good. Proper rain water drain at single point out shall be provided.
The sun shades shall have been extended 6'' more than the windows size.
Th size of sun shade should have been tapered out side to 2'' thick.
Overall Observations:-
A ramp for physically handi capped persons shall be provided and it should not have a slope
greater than 1 in 20 or maximum of 1 in 12 for short distance up to 9.0m as per National Building
Code of India 2005
The overall workmanship is good.
The periferal sorroundings 2.0m in width all round the building shall be gravelled.
The Building rooms shall have minimum plinth height of 0.45mt. from ground level as per
National Building Code of India 2005
Note:
1) This inspection report does not purport to be covering all the aspects of the work, and the filed officers
are advised to check up the work and ensure the work as per the specified standards before making
payment..
Asst.Executive Engineer 2,
(PR) Vig & QC Sub-Division, Nalgonda.
To,
The Executive Engineer ,
PRI Miryalaguda for taking necessary action.
Submitted to the Executive Engineer (PR) Vigilance & Quality Control Division Hyderabad for favour of
information and necessary action.
a Pradesh
g Department
RT
Mandal Level Building at Kodad
easurements
ments
ur corners of building :
Remarks
As per M.Book
should be attended.
painting is observed at one to two place
n sheet enclosed.(Annexure V)
y is not good.
d found satisfactory.
nd workmanship is satisfactory.
ents Verified at random over flooring of
observed tread of 0.30m and rise of
n sheet enclosed.(Annexure I)
over Roof
he windows size.
o 2'' thick.
ANNEXURE I
REBOUND HAMMER TEST
Name of the Work :-
Date of Inspection :
21.10.2013
Sl.
No
Descrption of Item
Ground floor
(- 90)
degrees
32.00
27.50
M20
(0)
degrees
32.60
19.60
M20
Plinth Beam
(0)
degrees
34.30
34.00
M20
(0)
degrees
31.00
25.40
M20
First Floor
(-90)
degrees
33.33
22.00
M20
Remarks
NOTE:-1) The Results are tentative only . The actual Compressive Strengh shall be verified by the
Cube Test Results.
Asst.Executive Engineer 2,
(PR) Vig & QC Sub-Division, Nalgonda.
ANNEXURE II
OBSERVATION SHEET FOR ROOF SLAB
Name of the Work :-
Date of Inspection :-
21.10.2013
Slab Dimensions
Sl.
No
Room Number
As per M.Book
As per
Observation
Remarks
31.72 x 8.75m
31.80 x 8.86m
Asst.Executive Engineer 2,
Nalgonda.
ANNEXURE III
Observation sheet for RCC roof Beams and Columns
Name of the Work Construction of BNRGSK Mandal Level Building at Kodad
Date of Inspection 21.10.2013
Room
Number
As per
M.Book
Span of Beams
As per
Observation
Computer Room
As per
M.Book
As per
Observation
6.53m
6.53m
Remarks
COLUMNS
Size of Column
Sl.
No
Room
Number
Hall
Computer Room
As per
M.Book
As per
Observation
Asst.Executive Engineer 2,
(PR) Vig & QC Sub-Division, Nalgonda.
As per
M.Book
As per
Observation
2.90m
2.92m above
flooring
Remarks
ANNEXURE IV
Observation Sheet for Brick Masonry ( RANDOM )
Name of the Work :-
Date of Inspection :
21.10.2013
Sl.
No
Room
Number
Wall
Number
Hall
Long Wall
PO Room
As per observation
14.68m x 0.23 mx
3.07m
14.68m x 0.23 mx
3.07m
Remarks
Asst.Executive Engineer 2,
(PR) Vig & QC Sub-Division, Nalgonda.
ANNEXURE V
OBSERVATION SHEET FOR FLOORING
Name of the Work :-
Date of Inspection :
21.10.2013
Sl.
No
Room Number
Area of Flooring
Dimensions
Room
Remarks
As per M.Book
As per
Observation
6
Height of
skirting
observed as
15.00cm.
Meeting Hall
9.65m x 7.70m
9.65m x 7.75m
Computer Room
6.97m x 3.00m
6.97m x 3.00m
PO Room
3.57m x 3.00m
3.57m x 3.03m
Record Room
3.57m x 3.00m
3.57m x 3.00m
Room No.3
3.06m x 3.80m
3.06m x 3.80m
Asst.Executive Engineer 2,