Sunteți pe pagina 1din 1

Federal Register / Vol. 72, No.

238 / Wednesday, December 12, 2007 / Notices 70579

First Revised Sheet No. 335 DEPARTMENT OF ENERGY receive e-mail notification when a
First Revised Sheet No. 337 document is added to a subscribed
First Revised Sheet No. 338 Federal Energy Regulatory docket(s). For assistance with any FERC
Commission Online service, please e-mail
FGT states that the filing is being FERCOnlineSupport@ferc.gov, or call
made in compliance with the [Docket No. EL08–14–000]
(866) 208–3676 (toll free). For TTY, call
Commission’s ‘‘Order Issuing Black Oak Energy, LLC, EPIC Merchant (202) 502–8659.
Certificates’’ issued on June 15, 2006 in Energy, LP, SESCO Enterprises, LLC, Comment Date: 5 p.m. Eastern Time
the above referenced proceeding. Complainants v. PJM Interconnection, on December 26, 2007.
Any person desiring to protest this Inc., Respondent; Notice of Complaint Kimberly D. Bose,
filing must file in accordance with Rule Secretary.
December 4, 2007.
211 of the Commission’s Rules of
Take notice that on December 3, 2007, [FR Doc. E7–24028 Filed 12–11–07; 8:45 am]
Practice and Procedure (18 CFR
Black Oak Energy, LLC (Black Oak), BILLING CODE 6717–01–P
385.211). Protests to this filing will be EPIC Merchant Energy, LP and SESCO
considered by the Commission in Enterprises, LLC (collectively, Financial
determining the appropriate action to be Marketers), filed a formal complaint DEPARTMENT OF ENERGY
taken, but will not serve to make against PJM Interconnection, Inc. (PJM)
protestants parties to the proceeding. pursuant to section 206 and 306 of the Federal Energy Regulatory
Such protests must be filed in Federal Power Act, 16 U.S.C. 824e and Commission
accordance with the provisions of 825e (2000), and Rule 206 of the [Docket No. EL08–13–000]
Section 154.210 of the Commission’s Commission’s Rules of Practice and
regulations (18 CFR 154.210). Anyone Procedure, 18 CFR 385.206 (2007), Dynegy Moss Landing, LLC, Dynegy
filing a protest must serve a copy of that alleging that the PJM Tariff is Morro Bay, LLC, El Segundo Power
document on all the parties to the improperly allocating physical LLC, and Reliant Energy, Inc.,
proceeding. transmission line losses to virtual Complainants v. California
transactions and also distributing over- Independent System Operator
The Commission encourages
collected transmission line losses in a Corporation, Respondents; Notice of
electronic submission of protests in lieu
manner that discriminates against Complaint
of paper using the ‘‘eFiling’’ link at
virtual Market Participants.
http://www.ferc.gov. Persons unable to Financial Marketers certify that copies December 4, 2007.
file electronically should submit an of the complaint were served on the Take notice that on November 30,
original and 14 copies of the protest to contacts for PJM as listed on the 2007, Dynegy Moss Landing, LLC,
the Federal Energy Regulatory Commission’s list of Corporate Officials. Dynegy Morro Bay, LLC, El Segundo
Commission, 888 First Street, NE., Any person desiring to intervene or to Power LLC, and Reliant Energy, Inc.
Washington, DC 20426. protest this filing must file in (Complainants), filed a formal
This filing is accessible on-line at accordance with Rules 211 and 214 of complaint against the California
http://www.ferc.gov, using the the Commission’s Rules of Practice and Independent System Operator
‘‘eLibrary’’ link and is available for Procedure (18 CFR 385.211, 385.214). Corporation (Respondent) pursuant to
Protests will be considered by the sections 206 and 306 of the Federal
review in the Commission’s Public
Commission in determining the Power Act, alleging that Respondent’s
Reference Room in Washington, DC.
appropriate action to be taken, but will application of the must-offer
There is an ‘‘eSubscription’’ link on the
not serve to make protestants parties to compensation provisions under its tariff
Web site that enables subscribers to commencing January 1, 2008, is unjust
the proceeding. Any person wishing to
receive e-mail notification when a and unreasonable and unduly
become a party must file a notice of
document is added to a subscribed intervention or motion to intervene, as discriminatory. The Complainants have
docket(s). For assistance with any FERC appropriate. The Respondent’s answer requested fast track processing.
Online service, please e-mail and all interventions, or protests must Complainants certify that copies of
FERCOnlineSupport@ferc.gov, or call be filed on or before the comment date. the complaint were served on the
(866) 208–3676 (toll free). For TTY, call The Respondent’s answer, motions to contacts for Respondent as listed on the
(202) 502–8659. intervene, and protests must be served Commission’s list of Corporate Officials.
Comment Date: 5 p.m. Eastern Time on the Complainants. Any person desiring to intervene or to
December 12, 2007. The Commission encourages protest this filing must file in
electronic submission of protests and accordance with Rules 211 and 214 of
Kimberly D. Bose, interventions in lieu of paper using the the Commission’s Rules of Practice and
Secretary. ‘‘eFiling’’ link at http://www.ferc.gov. Procedure (18 CFR 385.211, 385.214).
[FR Doc. E7–24030 Filed 12–11–07; 8:45 am] Persons unable to file electronically Protests will be considered by the
BILLING CODE 6717–01–P should submit an original and 14 copies Commission in determining the
of the protest or intervention to the appropriate action to be taken, but will
Federal Energy Regulatory Commission, not serve to make protestants parties to
888 First Street, NE., Washington, DC the proceeding. Any person wishing to
20426. become a party must file a notice of
This filing is accessible on-line at intervention or motion to intervene, as
mstockstill on PROD1PC66 with NOTICES

http://www.ferc.gov, using the appropriate. The Respondent’s answer


‘‘eLibrary’’ link and is available for and all interventions, or protests must
review in the Commission’s Public be filed on or before the comment date.
Reference Room in Washington, DC. The Respondent’s answer, motions to
There is an ‘‘eSubscription’’ link on the intervene, and protests must be served
Web site that enables subscribers to on the Complainants.

VerDate Aug<31>2005 15:54 Dec 11, 2007 Jkt 214001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\12DEN1.SGM 12DEN1

S-ar putea să vă placă și