Sunteți pe pagina 1din 2

Federal Register / Vol. 72, No.

232 / Tuesday, December 4, 2007 / Notices 68149

whether to proceed with the preparation DEPARTMENT OF ENERGY Corps of Engineers’ Emsworth Locks &
of a development application to Dam and operated in a run-of-river
construct and operate the project. Federal Energy Regulatory mode would consist of: (1) A new 200-
Commission foot-long, 200-foot-wide, 50-foot-high
q. Comments, Protests, or Motions to
[Project No. 12905–000] concrete powerhouse; (2) a new intake
Intervene—Anyone may submit
channel and tailrace channel on the
comments, a protest, or a motion to
BPUS Generation Development, LLC; southern bank of the main channel, on
intervene in accordance with the Neville Island directly opposite the
Notice of Application Accepted for
requirements of Rules of Practice and existing locks structure; (3) five turbine/
Filing and Soliciting Motions To
Procedure, 18 CFR 385.210, .211, .214. generator units with a combined
Intervene, Protests, and Comments
In determining the appropriate action to installed capacity of 32.7 megawatts; (4)
take, the Commission will consider all November 26, 2007. a new 11,500-foot-long aboveground
protests or other comments filed, but Take notice that the following transmission line extending from the
only those who file a motion to hydroelectric application has been filed switchyard near the powerhouse to an
intervene in accordance with the with the Commission and is available interconnection point with an existing
Commission’s Rules may become a for public inspection: transmission line located southwest of
party to the proceeding. Any comments, a. Type of Application: Preliminary the powerhouse; and (5) appurtenant
protests, or motions to intervene must Permit. facilities. The proposed Emsworth
b. Project No.: 12905–000. Locks & Dam Project would have an
be received on or before the specified c. Date filed: July 30, 2007.
comment date for the particular average annual generation of 141.3
d. Applicant: BPUS Generation
application. gigawatt-hours.
Development, LLC. l. This filing is available for review at
r. Filing and Service of Responsive e. Name of Project: Emsworth Locks &
the Commission in the Public Reference
Documents—Any filings must bear in Dam Hydroelectric Project.
f. Location: Ohio River in Allegheny Room or may be viewed on the
all capital letters the title Commission’s Web site at http://
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT County, Pennsylvania. It would use the
U.S. Army Corps of Engineers’ www.ferc.gov using the ‘‘eLibrary’’ link.
TO FILE COMPETING APPLICATION’’, Enter the docket number excluding the
Emsworth Locks & Dam.
‘‘COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power last three digits in the docket number
‘‘PROTEST’’, and ‘‘MOTION TO Act, 16 U.S.C. 791(a)–825(r). field to access the document. For
INTERVENE’’, as applicable, and the h. Applicant Contact: Mr. Jeffrey M. assistance, call toll-free 1–866–208–
Project Number of the particular Auser, P.E., BPUS Generation 3676 or e-mail
application to which the filing refers. Development, LLC, 225 Greenfield FERCONLINESUPPORT@FERC.GOV.
Any of the above-named documents Parkway, Suite 201, Liverpool, NY For TTY, call (202) 502–8659. A copy is
must be filed by providing the original 13088, (315) 413–2700. also available for inspection and
and the number of copies provided by i. FERC Contact: Robert Bell, (202) reproduction at the address in item h
the Commission’s regulations to: The 502–4126. above.
Secretary, Federal Energy Regulatory j. Deadline for filing comments, m. Competing Preliminary Permit—
protests, and motions to intervene: 60 Anyone desiring to file a competing
Commission, 888 First Street, NE.,
days from the issuance date of this application for preliminary permit for a
Washington, DC 20426. An additional
notice. proposed project must submit the
copy must be sent to Director, Division competing application itself, or a notice
All documents (original and eight
of Hydropower Administration and of intent to file such an application, to
copies) should be filed with: Kimberly
Compliance, Federal Energy Regulatory the Commission on or before the
D. Bose, Secretary, Federal Energy
Commission, at the above-mentioned Regulatory Commission, 888 First specified comment date for the
address. A copy of any notice of intent, Street, NE., Washington, DC 20426. particular application (see 18 CFR 4.36).
competing application or motion to Comments, protests, and interventions Submission of a timely notice of intent
intervene must also be served upon each may be filed electronically via the allows an interested person to file the
representative of the Applicant Internet in lieu of paper; see 18 CFR competing preliminary permit
specified in the particular application. 385.2001(a)(1)(iii) and the instructions application no later than 30 days after
s. Agency Comments—Federal, State, on the Commission’s Web site under the the specified comment date for the
and local agencies are invited to file ‘‘e-Filing’’ link. The Commission particular application. A competing
comments on the described application. strongly encourages electronic filings. preliminary permit application must
Please include the project number (P– conform with 18 CFR 4.30 and 4.36.
A copy of the application may be
12905–000) on any comments or n. Competing Development
obtained by agencies directly from the Application—Any qualified
Applicant. If an agency does not file motions filed.
The Commission’s Rules of Practice development applicant desiring to file a
comments within the time specified for and Procedure require all intervenors competing development application
filing comments, it will be presumed to filing documents with the Commission must submit to the Commission, on or
have no comments. One copy of an to serve a copy of that document on before a specified comment date for the
agency’s comments must also be sent to each person in the official service list particular application, either a
the Applicant’s representatives. for the project. Further, if an intervenor competing development application or a
files comments or documents with the notice of intent to file such an
Kimberly D. Bose,
Commission relating to the merits of an application. Submission of a timely
mstockstill on PROD1PC66 with NOTICES

Secretary. notice of intent to file a development


issue that may affect the responsibilities
[FR Doc. E7–23435 Filed 12–3–07; 8:45 am] of a particular resource agency, they application allows an interested person
BILLING CODE 6717–01–P must also serve a copy of the document to file the competing application no
on that resource agency. later than 120 days after the specified
k. Description of Project: The comment date for the particular
proposed project using the U.S. Army application. A competing license

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1
68150 Federal Register / Vol. 72, No. 232 / Tuesday, December 4, 2007 / Notices

application must conform with 18 CFR representative of the Applicant CFR 385.2001(a)(1)(iii) and the
4.30 and 4.36. specified in the particular application. instructions on the Commission’s Web
o. Notice of Intent—A notice of intent s. Agency Comments—Federal, State, site under the ‘‘e-Filing’’ link. The
must specify the exact name, business and local agencies are invited to file Commission strongly encourages
address, and telephone number of the comments on the described application. electronic filings. Please include the
prospective applicant, and must include A copy of the application may be project number (P–12906–000) on any
an unequivocal statement of intent to obtained by agencies directly from the comments or motions filed.
submit, if such an application may be Applicant. If an agency does not file The Commission’s Rules of Practice
filed, either a preliminary permit comments within the time specified for and Procedure require all intervenors
application or a development filing comments, it will be presumed to filing documents with the Commission
application (specify which type of have no comments. One copy of an to serve a copy of that document on
application). A notice of intent must be agency’s comments must also be sent to each person in the official service list
served on the applicant(s) named in this the Applicant’s representatives. for the project. Further, if an intervenor
public notice. files comments or documents with the
p. Proposed Scope of Studies Under Kimberly D. Bose, Commission relating to the merits of an
Permit—A preliminary permit, if issued, Secretary. issue that may affect the responsibilities
does not authorize construction. The [FR Doc. E7–23436 Filed 12–3–07; 8:45 am] of a particular resource agency, they
term of the proposed preliminary permit BILLING CODE 6717–01–P must also serve a copy of the document
would be 36 months. The work on that resource agency.
proposed under the preliminary permit k. Description of Project: The
would include economic analysis, DEPARTMENT OF ENERGY proposed project using the U.S. Army
preparation of preliminary engineering Corps of Engineers’ Monongahela Lock
plans, and a study of environmental Federal Energy Regulatory & Dam No. 4 and operated in a run-of-
impacts. Based on the results of these Commission river mode would consist of: (1) A new
studies, the Applicant would decide [Project No. 12906–000] 200-foot-long, 250-foot-wide, 50-foot
whether to proceed with the preparation high concrete powerhouse; (2) a new
of a development application to BPUS Generation Development, LLC; intake channel and tailrace channel on
construct and operate the project. Notice of Application Accepted for the southwest side of the river opposite
q. Comments, Protests, or Motions To Filing and Soliciting Motions To the existing lock structure; (3) four
Intervene—Anyone may submit Intervene, Protests, and Comments turbine/generator units with a combined
comments, a protest, or a motion to installed capacity of 18.7 megawatts; (4)
intervene in accordance with the November 26, 2007. a new 4,900-foot-long aboveground
requirements of Rules of Practice and Take notice that the following transmission line extending from the
Procedure, 18 CFR 385.210, .211, .214. hydroelectric application has been filed switchyard near the powerhouse to an
In determining the appropriate action to with the Commission and is available existing substation located southwest of
take, the Commission will consider all for public inspection: the powerhouse; and (5) appurtenant
protests or other comments filed, but a. Type of Application: Preliminary facilities. The proposed Monongahela
only those who file a motion to Permit. Lock & Dam No. 4 Project would have
intervene in accordance with the b. Project No.: 12906–000. an average annual generation of 81.8
Commission’s Rules may become a c. Date filed: July 30, 2007. gigawatt-hours.
party to the proceeding. Any comments, d. Applicant: BPUS Generation l. This filing is available for review at
protests, or motions to intervene must Development, LLC. the Commission in the Public Reference
be received on or before the specified e. Name of Project: Monongahela Lock Room or may be viewed on the
comment date for the particular & Dam No. 4 Hydroelectric Project. Commission’s Web site at http://
application. f. Location: Monongahela River in www.ferc.gov using the ‘‘eLibrary’’ link.
r. Filing and Service of Responsive Westmoreland County, Pennsylvania. It Enter the docket number excluding the
Documents—Any filings must bear in would use the U.S. Army Corps of last three digits in the docket number
all capital letters the title Engineers’ Monongahela Lock & Dam field to access the document. For
‘‘COMMENTS’’, ‘‘NOTICE OF INTENT No. 4. assistance, call toll-free 1–866–208–
TO FILE COMPETING APPLICATION’’, g. Filed Pursuant to: Federal Power 3676 or e-mail
‘‘COMPETING APPLICATION’’, Act, 16 U.S.C. 791(a)–825(r). FERCONLINESUPPORT@FERC.GOV.
‘‘PROTEST’’, and ‘‘MOTION TO h. Applicant Contact: Mr. Jeffrey M. For TTY, call (202) 502–8659. A copy is
INTERVENE’’, as applicable, and the Auser, P.E., BPUS Generation also available for inspection and
Project Number of the particular Development, LLC, 225 Greenfield reproduction at the address in item h
application to which the filing refers. Parkway, Suite 201, Liverpool, NY above.
Any of the above-named documents 13088, (315) 413–2700. m. Competing Preliminary Permit—
must be filed by providing the original i. FERC Contact: Robert Bell, (202) Anyone desiring to file a competing
and the number of copies provided by 502–4126. application for preliminary permit for a
the Commission’s regulations to: The j. Deadline for filing comments, proposed project must submit the
Secretary, Federal Energy Regulatory protests, and motions to intervene: 60 competing application itself, or a notice
Commission, 888 First Street, NE., days from the issuance date of this of intent to file such an application, to
Washington, DC 20426. An additional notice. the Commission on or before the
copy must be sent to Director, Division All documents (original and eight specified comment date for the
mstockstill on PROD1PC66 with NOTICES

of Hydropower Administration and copies) should be filed with: Secretary, particular application (see 18 CFR 4.36).
Compliance, Federal Energy Regulatory Federal Energy Regulatory Commission, Submission of a timely notice of intent
Commission, at the above-mentioned 888 First Street, NE., Washington, DC allows an interested person to file the
address. A copy of any notice of intent, 20426. Comments, protests, and competing preliminary permit
competing application or motion to interventions may be filed electronically application no later than 30 days after
intervene must also be served upon each via the Internet in lieu of paper; see 18 the specified comment date for the

VerDate Aug<31>2005 17:38 Dec 03, 2007 Jkt 214001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\04DEN1.SGM 04DEN1

S-ar putea să vă placă și