Sunteți pe pagina 1din 9

60272 Federal Register / Vol. 72, No.

205 / Wednesday, October 24, 2007 / Rules and Regulations

approval under the Paperwork publication of this final rule in the Parts per
Commodity
Reduction Act (PRA), 44 U.S.C. 3501 et Federal Register. This final rule is not million
seq., nor does it require any special a ‘‘major rule’’ as defined by 5 U.S.C.
considerations under Executive Order 804(2). * * * * *
12898, entitled Federal Actions to Strawberry ................................ 0.15
List of Subjects in 40 CFR Part 180 * * * * *
Address Environmental Justice in
Minority Populations and Low-Income [FR Doc. E7–20670 Filed 10–23–07; 8:45 am]
Populations (59 FR 7629, February 16, Environmental protection,
1994). Administrative practice and procedure, BILLING CODE 6560–50–S

Since tolerances and exemptions that Agricultural commodities, Pesticides


are established on the basis of a petition and pests, Reporting and recordkeeping
under section 408(d) of FFDCA, such as requirements. FEDERAL COMMUNICATIONS
the tolerance in this final rule, do not COMMISSION
Dated: October 5, 2007.
require the issuance of a proposed rule,
the requirements of the Regulatory Lois Rossi, 47 CFR Part 25
Flexibility Act (RFA) (5 U.S.C. 601 et Director, Registration Division, Office of
seq.) do not apply. Pesticide Programs. [IB Docket No. 06–123; FCC 07–174]
This final rule directly regulates ■Therefore, 40 CFR chapter I is
growers, food processors, food handlers, Establishment of Policies and Service
amended as follows: Rules for the Broadcasting-Satellite
and food retailers, not States or tribes,
nor does this action alter the Service
PART 180—[AMENDED]
relationships or distribution of power AGENCY: Federal Communications
and responsibilities established by ■ 1. The authority citation for part 180 Commission.
Congress in the preemption provisions continues to read as follows: ACTION: Final rule.
of section 408(n)(4) of FFDCA. As such,
Authority: 21 U.S.C. 321(q), 346a and 371.
the Agency has determined that this SUMMARY: In this Order on
action will not have a substantial direct Reconsideration, the Federal
effect on States or tribal governments, ■ 2. Section 180.579 is amended by Communications Commission
on the relationship between the national alphabetically adding the (Commission) reconsiders, in part, sua
government and the States or tribal commoditiesBrassica, head and stem, sponte, its Report and Order in this
governments, or on the distribution of subgroup 5A; Brassica, leafy greens, proceeding in which it adopted
power and responsibilities among the subgroup 5B;carrot; cotton, gin processing and service rules for the 17/
various levels of government or between byproducts; cotton, undelinted seed, 24 GHz Broadcasting-Satellite Service
the Federal Government and Indian pepper, nonbell; sunflower; vegetable, (BSS). In the Report and Order, the
tribes. Thus, the Agency has determined fruiting, group 8, except nonbell pepper; Commission adopted a framework in
that Executive Order 13132, entitled vegetable, leafy, except Brassica, group which 17/24 GHz BSS space stations
Federalism (64 FR 43255, August 10, 4; and by removing lettuce, head; would operate at orbital locations
1999) and Executive Order 13175, lettuce, leaf; and tomato from the table spaced at four-degree intervals, as set
entitled Consultation and Coordination in paragraph (a)(1) and by alphabetically forth in Appendix F of the Report and
with Indian Tribal Governments (65 FR adding strawberry to the table in Order. In this Order on Reconsideration,
67249, November 6, 2000) do not apply paragraph (d) to read as follows: the Commission provides additional
to this rule. In addition, This rule does flexibility to 17/24 GHz BSS space
not impose any enforceable duty or § 180.579 Fenamidone; tolerances for
residues. station operators by allowing them to
contain any unfunded mandate as operate their space stations, upon
described under Title II of the Unfunded (a) * * * request, at locations other than those
Mandates Reform Act of 1995 (UMRA) (1) * * * specified in Appendix F of the Report
(Public Law 104–4). and Order. Specifically, the
This action does not involve any Parts per Commission will assign space stations
technical standards that would require Commodity million to orbital locations that are offset from
Agency consideration of voluntary the Appendix F locations by up to one
consensus standards pursuant to section Brassica, head and stem, sub-
degree, without requiring them to
12(d) of the National Technology group 5A ............................... 5.0
Brassica, leafy greens, sub- reduce power or accept additional
Transfer and Advancement Act of 1995 interference, if there are no licensed or
(NTTAA), Public Law 104–113, section group 5B ............................... 55
Carrot ........................................ 0.15 prior-filed applications for 17/24 GHz
12(d) (15 U.S.C. 272 note). BSS space stations less than four
Cotton, gin byproducts ............. 0.02
VII. Congressional Review Act Cotton, undelinted seed ........... 0.02 degrees away from the proposed offset
The Congressional Review Act, 5
* * * * * space station.
Pepper, nonbell ........................ 3.5 DATES: Effective November 23, 2007.
U.S.C. 801 et seq., generally provides * * * * *
that before a rule may take effect, the Sunflower .................................. 0.02 ADDRESSES: You may submit comments,
agency promulgating the rule must * * * * * identified by IB Docket No. 06–123, by
submit a rule report to each House of Vegetable, fruiting, group 8, ex- any of the following methods:
the Congress and to the Comptroller cept nonbell pepper .............. 1.0 • Federal eRulemaking Portal: http://
General of the United States. EPA will Vegetable, leafy, except Bras- www.regulations.gov. Follow the
yshivers on PROD1PC62 with RULES

submit a report containing this rule and sica, group 4 ......................... 60 instructions for submitting comments.
other required information to the U.S. * * * * * • Federal Communications
Senate, the U.S. House of Commission’s Web Site: http://
Representatives, and the Comptroller * * * * * www.fcc.gov/cgb/ecfs/. Follow the
General of the United States prior to (d) * * * instructions for submitting comments.

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00046 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations 60273

• Mail: Office of the Secretary, previously received approval of the space stations be located precisely at the
Federal Communications Commission, associated information collection orbital locations specified in Appendix
445 Twelfth Street, SW., Washington, requirements from the Office of F. Nevertheless, we required applicants
DC 20554. Management and Budget (OMB) under seeking to operate a 17/24 GHz BSS
• People with Disabilities: Contact the OMB Control No. 3060–1097. The sua space station at a location offset from an
FCC to request reasonable sponte Order on Reconsideration does Appendix F location to make a technical
accommodations (accessible format not contain any new or modified showing that the proposed satellite will
documents, sign language interpreters, ‘‘information collection burden for not cause any more interference to a 17/
CART, etc.) by e-mail: FCC504@fcc.gov small business concerns with fewer than 24 GHz BSS space station operating at
or phone: 202–418–0530 or TTY: 202– 25 employees,’’ pursuant to the Small an Appendix F location than would be
418–0432. Business Paperwork Relief Act of 2002, caused if the proposed offset space
For detailed instructions for submitting Public Law 107–198, see 44 U.S.C. station were positioned precisely at an
comments and additional information 3506(c)(4). Appendix F location. Further, we stated
on the rulemaking process, see the that applicants seeking to operate at an
Summary of Report and Order
SUPPLEMENTARY INFORMATION section of offset location must agree to accept any
this document. 1. In this Order on Reconsideration increased interference that may result
(Reconsideration Order), we reconsider, from operating at that location.
FOR FURTHER INFORMATION CONTACT:
in part, sua sponte, our Report and 3. Following release of the Report and
Andrea Kelly (202) 418–7877, Satellite Order in this proceeding, in which we Order, we received a number of ex parte
Division, International Bureau, Federal adopted processing and service rules for filings commenting on the four-degree
Communications Commission, the 17/24 GHz Broadcasting-Satellite orbital spacing framework. Specifically,
Washington, DC 20554. For additional Service (BSS). In the Report and Order, EchoStar Satellite L.L.C. (EchoStar)
information concerning the information we adopted a framework in which 17/ requests that the Commission provide
collection(s) contained in this 24 GHz BSS space stations would additional flexibility by allowing 17/24
document, contact Judith B. Herman at operate at orbital locations spaced at GHz BSS space station operators to
202–418–0214, or via the Internet at four-degree intervals, as set forth in operate at locations that are offset from
Judith-B.Herman@fcc.gov. Appendix F of the Report and Order. In the Appendix F locations by up to one
SUPPLEMENTARY INFORMATION: This is a this Reconsideration Order, we provide degree, without reducing power or
summary of the Commission’s Order on additional flexibility to 17/24 GHz BSS accepting any additional interference, if
Reconsideration in IB Docket No. 06– space station operators by allowing the adjacent Appendix F location is
123, FCC 07–174, adopted September them to operate their space stations, unassigned. EchoStar also requests that
28, 2007 and released on September 28, upon request, at locations other than we require future applicants seeking to
2007. The full text of the Order on those specified in Appendix F. operate at an Appendix F location
Reconsideration is available for public Specifically, we will assign space adjacent to an offset location to protect
inspection and copying during regular stations to orbital locations that are the offset licensee from harmful
business hours at the FCC Reference offset from the Appendix F locations by interference. EchoStar states that this
Information Center, Portals II, 445 12th up to one degree, without requiring additional flexibility is necessary to
Street, SW., Room CY–A257, them to reduce power or accept compensate for the technical limitations
Washington, DC 20554. The document additional interference, if there are no of a small-dish satellite service such as
may also be purchased from the licensed or prior-filed applications for the 17/24 GHz BSS. Specifically,
Commission’s duplicating contractor, 17/24 GHz BSS space stations less than EchoStar states that a uniform four-
Best Copy and Printing, Inc., Portals II, four degrees away from the proposed degree spacing framework will not
445 12th Street, SW., Room CY–B402, offset space station. allow certain operators, particularly
Washington, DC 20554, telephone 202– 2. In the Report and Order, we those with in-orbit DBS space stations,
488–5300, facsimile 202–488–5563, or adopted a four-degree orbital spacing to utilize a small, single subscriber
via e-mail FCC@BCPIWEB.com. framework and a grid, in Appendix F of antenna that will allow customers to
Pursuant to the Regulatory Flexibility the Report and Order, specifying the receive service in both the DBS and 17/
Act, the Commission issued a Final locations that could be assigned to 17/ 24 GHz BSS frequency bands. EchoStar
Regulatory Flexibility Analysis (FRFA) 24 GHz BSS satellites. We recognized, states that a second consumer dish
in the Report and Order in this however, that it may not be possible to would be required to receive signals
proceeding. None of the rule revisions locate a 17/24 GHz BSS space station from two direct-to-home (DTH) satellites
adopted by the Commission in this sua precisely at some of the orbital locations located between 0.7 and 1.8 degrees
sponte Order on Reconsideration affect specified in Appendix F of the Report apart, which would be the case for the
the analysis in the Report and Order. and Order. For example, due to 110° W.L. DBS orbital location and the
We therefore incorporate by reference stationkeeping concerns, it may not be 111° W.L. 17/24 GHz BSS Appendix F
the Commission’s prior regulatory possible to locate a 17/24 GHz BSS location, as well as the 61.5° W.L. DBS
flexibility analysis. The text of the FRFA satellite at an Appendix F orbital orbital location and 63° W.L. 17/24 GHz
is set forth in Appendix A of the Report location already occupied by other BSS Appendix F location. As such,
and Order, 72 FR 49999, August 29, satellites operating in different EchoStar claims that it would be
2007. frequency bands. Further, because of required to implement a ‘‘two-dish’’
potential interference, it may not be solution or a larger dish at added
Paperwork Reduction Act possible to operate a 17/24 GHz BSS expense and complexity to dish design,
Requirements space station at or near locations where manufacturing, and installation.
The actions contained herein have another satellite, such as a U.S.-licensed EchoStar asserts this would disparately
yshivers on PROD1PC62 with RULES

been analyzed with respect to the Direct Broadcast Service (DBS) space impact its subscriber base.
Paperwork Reduction Act of 1995 at the station, is receiving feeder-link signals 4. DIRECTV, Inc. (DIRECTV) filed an
initiation of the Notice of Proposed in the 17.3–17.8 GHz band. Thus, in the ex parte letter stating that it supports
Rulemaking, 71 FR 43687, August 2, Report and Order, we stated that we EchoStar’s proposal in cases where the
2006, in this proceeding, and we have would not require that 17/24 GHz BSS adjacent Appendix F location remains

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00047 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
60274 Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations

unassigned. DIRECTV contends that the orbital spacing framework adopted in capacity relative to the current
Commission should not require future the Report and Order. EchoStar also Appendix F plan. DIRECTV also takes
operators assigned to Appendix F notes that the shift proposed by SES issue with EchoStar’s need for a one-
locations to protect operators at offset Americom would not address all of degree offset to remedy its problem, and
locations. DIRECTV does not claim that EchoStar’s concerns at the 110° W.L. proposed several alternative solutions
EchoStar’s proposal would harm its and 61.5° W.L. orbital locations. including: Operation at smaller offsets;
current plans to align its 17/24 GHz BSS 6. On July 20, 2007, EchoStar filed an operation from nearby orbital locations
space stations with its Ka-band fixed- ex parte letter in which it reiterated that with use of an additional feed on one of
satellite service (FSS)-DTH space the Commission should afford both EchoStar’s current antennas; or the use
stations. Rather, DIRECTV focuses on current and future applicants the of case-by-case waivers.
future applications, asserting that flexibility to operate at offset locations 10. On September 21, 2007, SES
EchoStar’s proposal would technically at full power. EchoStar asserts that this Americom filed an ex parte letter
compromise a number of orbital flexibility may be important for future reiterating its opposition to EchoStar’s
locations by rendering them less than applicants that are seeking to co-locate request for revisions to the orbital
optimally functional. DIRECTV existing or planned satellites with 17/24 spacing plan adopted in this proceeding
proposes a modified approach whereby GHz BSS space stations. EchoStar states and explains ‘‘that grant of the
a licensee operating at an offset location that its approach would level the flexibility requested by EchoStar would
would be allowed to operate at full playing field for all current and future fundamentally undermine the four-
power only until a 17/24 GHz BSS applicants. In addition, EchoStar degree spacing adopted in the Order.’’
operator is licensed at the adjacent contends that its proposal may provide SES Americom also notes ‘‘that [its]
Appendix F location, at which time the satellite operators with authorizations affiliate, Ciel Satellite LP, was selected
offset operator would have to modify its from other countries the flexibility to by Industry Canada to operate in 17/24
operations so that it will not cause integrate 17/24 GHz BSS service with GHz spectrum and is expected to seek
harmful interference to the licensee facilities operating from orbital U.S. market access once the current
operating at the Appendix F location. In locations that do not conform with those application freeze has been lifted.’’
response to DIRECTV’s modified in Appendix F. 11. On September 25, 2007, SES
approach, EchoStar asserts that 7. On September 12, 2007, Telesat Americom filed an ex parte letter
DIRECTV’s proposal does not provide Canada filed an ex parte letter urging opposing EchoStar’s proposal, arguing
sufficient certainty that full-power offset the Commission to include two that it would undermine the certainty
operators will be able to continue to conditions for each 17/24 GHz BSS established by the Commission’s
provide quality service using single authorization. The first condition would Appendix F plan, and proposing
make the grant subject to the licensee alternative solutions including small
subscriber antennas. EchoStar contends
coordinating with satellite operators offsets, alternate locations or the use of
that DIRECTV’s modified approach is
having International waivers.
essentially a reversion back to our 12. On September 26, 2007, Telesat
Telecommunication Union (ITU) date
Report and Order with respect to how filed an ex parte letter stating that it
priority. The second condition Telesat
we would treat space stations operating generally supports EchoStar’s proposal,
requests would make the orbital
at offset locations. Furthermore, because the resulting additional
location specified in the grant subject to
EchoStar asserts that its own proposal flexibility potentially could resolve
modification to an offset location if
would not adversely affect DIRECTV’s international coordination issues at
necessary to facilitate coordination with
planned use of the 17/24 GHz BSS band. orbital locations that are of concern to
a satellite operator having ITU date
5. Further, SES Americom, Inc. (SES priority. Telesat. Telesat asserts that a one degree
Americom) filed an ex parte letter 8. On September 14, 2007, EchoStar change may be insufficient for
opposing EchoStar’s proposal. SES filed an ex parte letter reiterating that international coordination purposes.
Americom states that EchoStar has licensees should have the flexibility to Telesat states that one of the four 17/24
exaggerated the technical challenges operate up to one degree offset from GHz BSS orbital locations for which it
inherent in a uniform four-degree orbital Appendix F locations on a permanent has been authorized, at 72.5° W.L., will
spacing framework, and asserts that, basis at full power and with full be 1.5° away from the nearest Appendix
with relatively simple system design interference protection. EchoStar also F location. Telesat asserts that in the
modifications, the framework can reiterates that ‘‘all satellite providers event that EchoStar’s proposal is
accommodate single subscriber should be on a level playing field for adopted, departures from Appendix F
antennas with dual-band receivers. In new spectrum,’’ and that ‘‘all satellite locations of more than one degree
addition, SES Americom agrees with providers need this spectrum as soon as should be permitted if needed to
DIRECTV that adopting EchoStar’s possible.’’ facilitate international coordination.
request would render a number of 9. On September 19, 2007, DIRECTV 13. On September 26, 2007, EchoStar
Appendix F locations unusable for DTH filed an ex parte letter restating its filed an ex parte letter stating that the
video service. Finally, SES Americom earlier argument that a number of current rules frustrate video
states that it would not object to a one- Appendix F locations would suffer competition, harm consumers, and
degree shift to the east for Appendix F reduced usefulness and claiming that jeopardize delivery of HD services.
locations in the orbital arc from 43° these locations would experience a 90% EchoStar also states that ‘‘DIRECTV’s
W.L. to 63° W.L. SES Americom further reduction in received signal quality, waiver proposal is not a viable solution’’
states that this shift would allow for thus requiring an antenna diameter of and that a uniform four degree spacing
utilization of a single-feed subscriber 1.1 meter to compensate for this loss. plan will lead to higher prices, delays in
antenna for DBS operations at the 61.5° DIRECTV also restates its claim that the provision of new services, and will
yshivers on PROD1PC62 with RULES

W.L. orbital location and 17/24 GHz operators will have increased incentive force ‘‘consumers to acquire a second
BSS operations at 62° W.L. In response, to apply for offset locations due to the dish.’’ EchoStar also contends that
EchoStar claims that SES Americom likelihood of wider orbital separation, DIRECTV’s DBS orbital location line up
underestimates the technical concerns and that the worst case scenario would with the Appendix F locations and
EchoStar has with the four-degree produce a 33% decrease in orbital EchoStar’s do not.

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00048 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations 60275

14. In response, on September 27, licensee would unfairly penalize in carrier-to-interference ratio (C/I) for
2007, DIRECTV filed an ex parte letter applicants whose existing infrastructure the 17/24 GHz BSS space station that is
stating that only three of its five full does not comport with a uniform four- required to protect the offset space
contiguous United States (CONUS) degree spacing framework. Allowing station. DIRECTV asserts that operators
orbital locations align with the applicants whose infrastructure is not at the Appendix F orbital locations
Appendix F locations. DIRECTV also compatible with the four-degree spacing closest to a one-degree offset satellite
argues that the fact that international framework to use the flexibility we would be so compromised in
coordination presents a challenge in this adopt here to operate at full power will performance that these locations would
band ‘‘is all the more reason not to provide consumer with the most be unlikely to be used. DIRECTV,
allow operators to compromise DTH competitive service options. We however, did not present an analysis of
orbital locations that could otherwise be recognize that all offset operators may the reduction in carrier-to-noise-plus-
used in the coordination process to the not need to take advantage of full one- interference ratio (C/(N+I)), which is the
benefit of all U.S. licensees.’’ DIRECTV degree offsets. Nevertheless, providing more appropriate signal quality metric
also notes that ‘‘EchoStar’s own analysis the flexibility for up to a one-degree that determines the satellite link
shows that consumers will not need a offset should accommodate the performance.
second dish to receive signals from a operating needs of most prospective 20. Waiver. Finally, both DIRECTV
reverse band satellite that is slightly applicants, such as antenna/dish and SES Americom suggest that where
offset from a DBS orbital location.’’ configuration, while maintaining the the existing flexibility adopted in our
15. As we explain below, we find, number of orbital slots and minimizing Report and Order is insufficient,
upon reconsideration, that it is in the the impact on satellite capability. EchoStar and other applicants should
public interest to provide additional 18. Orbital Efficiency. DIRECTV avail themselves of the waiver process
flexibility in the orbital spacing argues that up to a 33% reduction of under § 1.3 of our rules. As we have
framework adopted in the Report and spectrum efficiency could result from concluded, adopting the flexibility
Order. In adopting the four-degree allowing 17/24 GHz BSS space station proposed by EchoStar best serves the
framework, our primary consideration operators to locate their space stations public interest. There is no public
was to balance the dual goals of up to one degree from Appendix F policy benefit from resolving this issue
maximizing orbital capacity while locations at full power and with full in a piecemeal fashion through
minimizing interference into small- interference protection. DIRECTV bases individual waiver requests. Acting here,
diameter receive antennas. Based on the this assertion on a highly unlikely rather than through individual waiver
ex parte presentations we have received, scenario that assumes for every three requests, provides regulatory certainty
however, we are persuaded that this Appendix F locations, a space station is now to all parties.
balance would not be disrupted by offset by one degree, another location 21. Consequently, we conclude that
permitting applicants to operate at eight degrees away has a space station adopting the additional flexibility best
certain locations offset from the at the Appendix F location, and no addresses concerns regarding the
Appendix F locations by up to one operator files for the location in compatibility of 17/24 GHz BSS orbital
degree without being required to reduce between. DIRECTV’s scenario repeats locations with the existing DBS
power and accept additional this pattern across the Appendix F grid infrastructure. This additional flexibility
interference. of four-degree locations. In light of the will allow for an orbital assignment
16. Sour Spot. In the ex parte filings ex partes received and the interest framework that is better aligned with
received on this issue, there is uniform expressed by operators, we do not applicants’ existing infrastructure and
agreement that fundamental principles expect this scenario to occur. In plans for launching satellite systems in
of antenna design make it difficult for a addition, as discussed above, we do not this band. Providing both current and
small subscriber antenna to receive believe that many 17/24 GHz BSS space future applicants the flexibility to locate
signals from two space stations if those station operators will need for technical their 17/24 GHz BSS satellites at
space stations are located between 0.7 reasons to avail themselves of the full preferred orbital locations relative to
and 1.8 degrees apart. We will call this one-degree offset. Further, as a practical their existing infrastructure will enable
0.7 to 1.8 range a ‘‘sour spot.’’ The matter, because an applicant can only them to serve subscribers with one
parties that filed ex partes, however, utilize this flexibility if there are no small multiple-feed antenna. While we
draw different conclusions regarding licensed or prior-filed applications for acknowledge that this flexibility may
how to compensate for these sour spots. 17/24 GHz BSS space stations less than reduce the number of orbital locations
EchoStar requests the flexibility to offset four degrees away from the proposed capable of operating at full power, we
future 17/24 GHz BSS space stations at offset space station, use of this conclude that, on balance, the public
up to 1 degree while still retaining the flexibility is less likely. Finally, we note interest is best served by affording
ability to transmit at full power and to that in the scenario DIRECTV describes, operators the greatest opportunity to
receive full interference protection. the operator at the location between the provide expanded DTH service to
DIRECTV and SES Americom both offset satellite and the satellite at the customers using a small single antenna.
argue that EchoStar’s concerns could be precise Appendix F location could 22. Under our revised orbital spacing
addressed by an offset of less than 1 offset its satellite half a degree away framework, we will assign 17/24 GHz
degree and typically of between 0.3 to from the offset satellite and thus achieve BSS space stations to orbital locations
0.5 degrees. DIRECTV argues further 3.5-degree spacing relative to the other offset from Appendix F locations by up
that such offsets would require the two space stations. Based upon to one degree, and allow them to operate
offset operator to make only small DIRECTV’s analysis of a 0.5 offset, such at full power and with full interference
reductions in power and would have a 3.5-degree spacing should have protection, if there is no 17/24 GHz BSS
minimal impact on operations. minimal impact on any satellite space station assigned to, or a prior-filed
yshivers on PROD1PC62 with RULES

17. Assuming DIRECTV’s assertion operations. application requesting assignment to, an


that small offsets would only require 19. 10 dB Reduction. DIRECTV argues orbital location less than four degrees
small reductions in power is correct, we that allowing a one-degree offset at full from the applicant’s proposed offset
find that any reduction in power to power and with full interference location. Thus, a full-power offset space
protect a later authorized Appendix F protection results in a 10 dB reduction station operator may operate at the

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00049 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
60276 Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations

maximum power flux density levels 25. Section 25.140(b). Section cover the situation where there is no
specified in §§ 25.208(c) and (w) of our 25.140(b) of our rules addresses the other previously authorized or proposed
rules, and will be accorded the same interference analysis that must be 17/24 GHz BSS space station located
interference protection that it would submitted with each 17/24 GHz BSS less than four degrees away from the
receive if the space station were located application. As with all FSS space proposed offset space station and the
precisely at an Appendix F location. station applications, 17/24 GHz BSS applicant proposes to operate the offset
Further, once we have authorized a full- applicants are required to submit an space station at full-power and with full
power offset space station, subsequently interference analysis demonstrating the interference protection. In this case, we
licensed space stations operating less compatibility of their proposed system require the applicant to provide an
than four degrees away from the offset with satellite networks operating at the interference analysis demonstrating the
space station will be required to reduce two nearest adjacent orbital locations. compatibility of its proposed offset
transmitted power levels to protect the Under the uniform four-degree spacing network with other 17/24 GHz BSS
offset space station from excessive framework adopted in the Report and space stations at least four degrees away
interference. Moreover, the newly Order, we presumed that the nearest from its proposed location.
licensed reduced-power space station adjacent orbital positions would be no 28. Section 25.140(b)(4)(ii) reflects the
must accept any interference from the closer than four degrees away. As a situation where the applicant proposes
full-power offset space station that consequence of the more flexible to operate its space station at an offset
results from the reduced orbital spacing. licensing framework adopted in this location, but there is a licensed or a
This will be the case regardless of Order, this assumption is no longer prior-filed application for a space
whether the new space station is valid and the interference coordination station within four degrees of the
operating at an Appendix F location or scenario for 17/24 GHz BSS space proposed offset location. In this case,
an offset location. To accommodate this stations becomes more complex. the applicant must provide an
more flexible framework, we must make Specifically, the coordination interference analysis demonstrating that
several changes to the technical rules requirements and operating burdens its proposed space station will not cause
we adopted in the Report and Order. We will vary, depending upon a any more interference to adjacent 17/24
discuss these changes below. combination of factors including: (1) GHz BSS satellite networks than if it
23. Section 25.262. We make a Whether, and to what extent, the were located at the Appendix F location
number of changes to § 25.262 of the applicant seeks to operate at an offset from which it is offset.
rules, which governs domestic orbital location; and (2) the location and 29. Finally, § 25.140(b)(4)(iii) reflects
coordination requirements for space authorized power levels of other the situation where an applicant
stations operating in the 17/24 GHz licensed and proposed 17/24 GHz BSS proposes to operate an offset space
BSS. First, we redesignate § 25.262(a) as space stations. To provide 17/24 GHz station but does not seek to take
§ 25.262(f). Further, we add new BSS space station applicants with advantage of the full-power, full
§§ 25.262(a) and (b) to recognize the guidance when filing their applications, interference protection option in
classes of 17/24 GHz BSS space stations we modify § 25.140(b) to codify the § 25.262(b). In this case, we require the
that may operate at the maximum power multiple interference scenarios and applicant to provide an interference
flux density levels permitted by our associated filing requirements. analysis demonstrating that its proposed
rules, and with full interference 26. The first scenarios arise where an space station will not cause any more
protection. This includes both space applicant proposes to operate at an interference to adjacent 17/24 GHz BSS
stations operating at Appendix F Appendix F location. In most of these satellite networks than if it were at the
locations and full-power offset space cases, the applicant will be required to Appendix F location from which it is
stations. In addition, we add § 25.262(c) submit an interference analysis offset.
to govern power levels on replacement demonstrating its compatibility with 30. Section 25.140(c). Section
space stations and space stations current or future 17/24 GHz BSS space 25.140(c) of our rules requires 17/24
authorized at orbital locations stations at least four degrees away. GHz BSS space stations to be designed
previously assigned to 17/24 GHz BSS However, an applicant proposing to to be compatible with other 17/24 GHz
space stations that have become operate at an Appendix F orbital BSS space stations as close as four
available for reassignment. location that is less than four degrees degrees away. As discussed above,
24. We also add § 25.262(d) to our away from an operator authorized however, full-power offset satellites are
rules, which provides that space pursuant to § 25.262(b) of our rules, will entitled to interference protection from
stations located less than four degrees be required to reduce its power to adjacent space stations operating less
away from a space station authorized to protect the full-power offset operator’s than four degrees away. Accordingly,
operate at full power under § 25.262(b) network, and will be required to accept we modify § 25.140(c) of our rules to
may not cause any more interference to the additional interference that results reflect this. We also modify this rule to
the full-power network than would be from the full-power operation at the clarify that operators seeking to operate
caused if the proposed space station was adjacent offset location. Thus, in such at offset orbital locations, but at reduced
four degrees away. The rule also cases, the applicant must demonstrate powers and without full interference
requires the reduced-power space that it will cause no more interference protection, must design their systems to
station to accept any increased to the full-power offset operator’s 17/24 be compatible with adjacent space
interference from the full-power GHz BSS network than if the offset stations at reduced orbital separations.
Appendix F or full-power offset space operator’s space station were located 31. Section 25.114(d)(17). To facilitate
station than would be caused if the four degrees away. We amend processing, we adopt a new rule,
proposed reduced-power space station § 25.140(b)(3) of our rules, and add § 25.114(d)(17), that requires applicants
were located four degrees away. Finally, §§ 25.140(b)(5), and (b)(6), to reflect to indicate, in the narrative to their
yshivers on PROD1PC62 with RULES

we also add § 25.262(e), which requires these scenarios. application, whether they propose to
reduced-power satellites to accept any 27. Applicants that propose to operate operate pursuant to § 25.262(b) of our
increased interference from 17/24 GHz 17/24 GHz BSS space stations at offset rules. Given the different classes of 17/
BSS space stations operating in locations fall under one of three 24 GHz BSS space stations, e.g., full-
conformance with our rules. scenarios. We adopt § 25.140(b)(4)(i) to power Appendix F space station, full-

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00050 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations 60277

power offset space station, reduced- operate a satellite at an adjacent 37. Once the two deadlines for filing
power Appendix F space station, and Appendix F location. If we grant the amendments have passed, the Bureau
reduced-power offset space station, Appendix F request, we will not be in will review the amended applications to
requiring applicants to state explicitly a position to grant the application to determine whether they are
that they seek to operate a full-power operate at full power at the offset substantially complete and acceptable
space station with full interference location. In these situations, denying the for filing. The Bureau will place
protection will expedite staff review of application for the offset location or acceptable applications on public
the application. requiring the licensee to operate at notice. The Bureau will dismiss as
32. Other rule changes. We make a reduced powers would unfairly penalize defective any amended applications that
number of other rule changes to correct the applicant for not correctly are not substantially complete. In the
cross-references to rule sections anticipating another applicant’s filings. event that two or more amended
changed by this Reconsideration Order Consequently, in cases where an applications are filed at a single
and to add cross-references to new application for authority to operate at an Appendix F location or its associated
rules, as appropriate. Accordingly, we offset location at full power conflicts offsets, we direct the Bureau to consider
revise the application filing with an application for an Appendix F the applications together and, if the
requirements in § 25.114(d)(7) to require location, we will permit the offset applicants are qualified, to license them
applicants to include the interference applicant a second opportunity to to operate in an equal portion of the
analysis described in new rule amend its application. The full-power spectrum. For example, if Applicant A
§§ 25.140(b)(3), (b)(4), (b)(5), or (b)(6), as offset applicant may change the orbital requests authority to operate at the
appropriate for their circumstances. We location to the Appendix F orbital Appendix F location of 91° W.L. and
also remove the version of location from which it was offset or may Applicant B seeks authority to operate
§ 25.114(d)(15)(iii) that was adopted in remain at the offset location at reduced either a full-power offset or reduced-
the Report and Order as the showing power and with reduced interference power offset from 91° W.L. at 92° W.L.,
that was required by that rule is now protection. the Bureau would consider these
incorporated into § 25.140 of the rules. 35. To implement this decision, we applications together. In this example, if
33. In the Report and Order, we direct the Bureau to release a Public the applications are substantially
decided to treat all pending applications Notice shortly after these rules become complete and the applicants are
as simultaneously filed under effective, inviting current applicants to qualified, the Bureau would license
§ 25.158(d) of our rules. We also amend the applications pending as of each applicant in an equal portion of
recognized that all applicants will need the date of this Order consistent with spectrum. Thus, for purposes of
to amend their pending applications to the rules we adopt today. We further determining whether the spectrum
comply with the new 17/24 GHz BSS direct the Bureau to dismiss, as should be split, the Appendix F location
rules. Thus, we directed the defective, any application that is not and any offset from a particular
International Bureau to release a Public amended by the date specified in the Appendix F location are considered the
Notice after the effective date of the new Public Notice. These applicants can same orbital location.
rules, inviting applicants to file amend their choice of orbital locations 38. In the Report and Order, we
conforming amendments and to consistent with the modifications decided to treat future applications for
consider those applications that are adopted today. Applicants must specify 17/24 GHz BSS space stations under a
accepted for filing together. The Bureau in the narrative portion of their first-come, first-served procedure. We
would then process and grant those application the type of authorization will continue to follow this approach.
applications, provided that the being sought, e.g., an authorization to Given our decision in this Report and
applicant was otherwise qualified. In operate at an Appendix F location, an Order to award licenses for offset space
the event two or more applicants authorization to operate at a full-power stations with full power and
requested authority to operate at the offset location, or an authorization to interference protection, we provide
same orbital location, we directed the operate at an offset location at reduced further clarification here as to how the
Bureau to consider the applications power and without full interference first-come, first-served procedure will
concurrently and, if the applicants were protection. Applicants seeking to work.
qualified, to license them to operate in operate at an offset location must 39. Initially, we note that the freeze
an equal portion of the spectrum. We specify the Appendix F location from on new applications established in the
will continue to follow this approach. which they propose to be offset. Report and Order remains in effect.
Nevertheless, as the result of the Applicants must provide the Once we lift the freeze, applicants may
modifications to the orbital spacing appropriate technical showing to file applications for new 17/24 GHz BSS
framework we adopt here, we support the request. space stations. We will consider these
implement an additional processing 36. Any applicant proposing a full- applications on a first-come, first-served
step under which we will permit certain power offset space station that conflicts basis. This means that we will grant the
applicants an opportunity to amend with an application for an adjacent application if the applicant is qualified
their applications for a second time. Appendix F space station will have and the proposed space station is not
Adding this additional step does not thirty days after the deadline for technically incompatible with any
change our decision to treat the pending amended applications discussed in the licensed space station or a space station
applications as simultaneously filed preceding paragraph to amend its proposed in a previously-filed
under § 25.158(d). application as discussed above. No application. For example, if we have
34. Specifically, we recognize that other applicants will be permitted to file authorized a full-power offset space
some current applicants may wish to second amendments. In this regard, station to a particular offset location, we
take advantage of the flexibility to each applicant bears the burden of will deny, as technically incompatible,
yshivers on PROD1PC62 with RULES

operate full-power offset satellites. discerning, through the Bureau’s an application for authority to operate a
These applicants will not know, electronic filing system, other full-power space station at the adjacent
however, when filing their initial potentially conflicting applications after Appendix F location. We would,
amendments, whether another existing the first deadline for amended however, grant the Appendix F
applicant will request authority to applications. application if the applicant is otherwise

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00051 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
60278 Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations

qualified, proposes to operate the the existing DBS infrastructure. We List of Subjects in 47 CFR Part 25
Appendix F space station at reduced emphasize that this approach provides Satellites.
power, and demonstrates that the the same advantages to both current and
proposed operations will not interfere future 17/24 GHz BSS applicants. This Federal Communications Commission.
with those of the full-power offset space additional flexibility will also allow for Marlene H. Dortch,
station. Further, we would consider an orbital assignment framework that is Secretary.
granting an application for a full-power better aligned with applicants’ business Rule Changes
space station at an Appendix F location plans and existing infrastructure and
if the adjacent offset operator is will thus afford operators the greatest ■ For the reasons discussed in the
authorized to operate at reduced power opportunity to provide expanded DTH preamble, the Federal Communications
only and without interference service using a single multiple-feed Commission amends 47 CFR part 25 to
protection. antenna. read as follows:
40. We also recognize that additional 42. As required by the Regulatory
17/24 GHz BSS orbital locations may PART 25—SATELLITE
Flexibility Act (RFA), the Commission COMMUNICATIONS
become available as licensees decide to issued a Final Regulatory Flexibility
surrender licenses or lose their licenses Analysis (FRFA) in the Report and ■ 1. The authority citation for part 25
for failure to meet the required Order in this proceeding. None of the continues to read as follows:
implementation milestones. Where we rule revisions adopted by the
do not issue an Order cancelling the Authority: 47 U.S.C. 701–744. Interprets or
Commission in this Sua Sponte applies Sections 4, 301, 302, 303, 307, 309
license, we will announce the
Reconsideration Order affect the and 332 of the Communications Act, as
cancellation through a Public Notice. As amended, 47 U.S.C. Sections 154, 301, 302,
analysis in the Report and Order. We
is our custom, once the Order or Public 303, 307, 309 and 332, unless otherwise
therefore incorporate by reference the
Notice has been issued, applicants may noted.
Commission’s prior regulatory
file applications for new space stations,
flexibility analysis. The Commission
modification applications for licensed ■ 2. Amend § 25.114 by revising
will provide a copy of this certification
space stations, or amendments to paragraphs (d)(7) and (d)(15), and by
to the Chief Counsel for Advocacy of the
pending applications that take the adding paragraph (d)(17) to read as
SBA, and include it in the report to
cancellation into account. Thus, if a follows:
Congress pursuant to the SBREFA.
license for a space station at an
Appendix F location is cancelled, the 43. Accordingly, it is ordered that, § 25.114 Applications for space station
pursuant to the authority contained in authorizations.
licensee of an adjacent offset location
space station authorized to operate at sections 1, 4(i), 4(j), 7(a), 301, 303(c), * * * * *
reduced power and without full 303(f), 303(g), 303(r), 303(y), and 308 of (d) * * *
interference protection may file a the Communications Act of 1934, as (7) Applicants for authorizations for
modification application to increase the amended, 47 U.S.C. 151, 154(i), 154(j), space stations in the fixed-satellite
power and receive full interference 157(a), 301, 303(c), 303(f), 303(g), 303(r), service must also include the
protection. Similarly, another applicant 303(y), 308, this Order on information specified in §§ 25.140(b)(1)
may apply for a license for a new space Reconsideration is adopted. and (2) of this part. Applicants for
station at the Appendix F location. As 44. It is further ordered that part 25 authorizations for space stations in the
with all applications processed under a of the Commission’s rules is amended as 17/24 GHz broadcasting-satellite service
first-come, first-served framework, set forth in Appendix A. An must also include the information
processing will be governed by the announcement of the effective date of specified in § 25.140(b)(1) and
applicant’s position in the processing these rule revisions will be published in §§ 25.140(b)(3), (b)(4), (b)(5), or (b)(6) of
queue. Thus, if the modification request the Federal Register. this part.
to increase power on an offset space 45. It is further ordered that the * * * * *
station is filed first, and the applicant is International Bureau is delegated (15) Each applicant for a space station
qualified, we will grant it; if the authority to issue Public Notices license in the 17/24 GHz broadcasting-
application for a new space station at consistent with this Order on satellite service shall include the
the Appendix F location is filed first, Reconsideration. following information as an attachment
and the applicant is qualified, we will to its application:
grant that application. In this manner, 46. It is further ordered that the (i) Except as set forth in paragraph
we will maintain an interference-free Commission’s Consumer and (d)(15)(ii) of this section, an applicant
operating environment for 17/24 GHz Governmental Affairs Bureau, Reference proposing to operate in the 17.3–17.7
BSS space stations, while still providing Information Center shall send a copy of GHz frequency band, must provide a
licensees the opportunity to design their this Order on Reconsideration, demonstration that the proposed space
satellite networks to best serve their including the final regulatory flexibility station will comply with the power flux
customers. act certification, to the Chief Counsel for density limits set forth in § 25.208(w) of
41. Conclusion. With this Order, we Advocacy of the Small Business this part.
provide additional flexibility to 17/24 Administration, in accordance with (ii) In cases where the proposed space
GHz BSS space station operators by section 603(a) of the Regulatory station will not comply with the power
allowing them, under certain Flexibility Act, 5 U.S.C. 601, et seq. flux density limits set forth in
circumstances, to operate their space (1981). § 25.208(w) of this part, the applicant
stations at full power and with full 47. It is further ordered that the will be required to provide a
interference protection at locations Commission shall send a copy of this certification that all potentially affected
yshivers on PROD1PC62 with RULES

other than those specified in Appendix Order on Reconsideration in a report to parties acknowledge and do not object
F to the Report and Order. We find that be sent to Congress and the General to the use of the applicant’s higher
this approach best addresses applicants’ Accountability Office pursuant to the power flux densities. The affected
concerns regarding the compatibility of Congressional Review Act, see 5 U.S.C. parties with whom the applicant must
17/24 GHz BSS orbital locations with 801(a)(1)(A). coordinate are those GSO 17/24 GHz

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00052 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations 60279

BSS satellite networks located up to ±6° two degrees from any authorized space interference to the adjacent 17/24 GHz
away for excesses of up to 3 dB above station. An applicant should provide BSS satellite networks operating in
the power flux-density levels specified details of its proposed r.f. carriers which compliance with the technical
in § 25.208(w) of this part, and up to it believes should be taken into account requirements of this part, than if the
±10° away greater for excesses greater in this analysis. At a minimum, the applicant were located at the precise
than 3 dB above those levels. applicant must include, for each type of Appendix F orbital location from which
(iii) An applicant proposing to r.f. carrier, the link noise budget, it seeks to offset;
provide international service in the modulation parameters, and overall link (iii) In cases where there is no
17.7–17.8 GHz band must demonstrate performance analysis. (See, e.g., previously licensed or proposed 17/24
that it will meet the power flux density appendices B and C to Licensing of GHz BSS space station to be located
limits set forth in § 25.208(c) of this Space Stations in the Domestic Fixed- within four degrees of the applicant’s
part. Satellite Service (available at address in proposed space station, and the
* * * * * Sec. 0.445)). applicant does not seek to operate
(17) An applicant seeking to operate (3) Except as described in paragraph pursuant to § 25.262(b) of this part, the
a space station in the 17/24 GHz (b)(5) of this section, an applicant for a applicant must provide an interference
broadcasting-satellite service pursuant license to operate a 17/24 GHz BSS analysis of the kind described in
to the provisions of § 25.262(b) of this space station that will be located paragraph (b)(2) of this section, except
part, at an offset location no greater than precisely at one of the 17/24 GHz BSS that the applicant must demonstrate that
one degree offset from an orbital orbital locations specified in Appendix its proposed operations will not cause
location specified in Appendix F of the F of the Report and Order adopted May more interference to any current or
Report and Order adopted May 2, 2007, 2, 2007, IB Docket No. 06–123, FCC 07– future 17/24 GHz BSS satellite networks
IB Docket No. 06–123, FCC 07–76, must 76, must provide an interference operating in compliance with the
submit a written request to that effect as analysis of the kind described in technical requirements of this part, than
part of the narrative portion of its paragraph (b)(2) of this section, except if the applicant were located at the
application. that the applicant must demonstrate the precise Appendix F orbital location
compatibility of its proposed network from which it seeks to offset.
* * * * * with any current or future authorized (5) An applicant for a license to
■ 3. Amend § 25.117 by adding space station in the 17/24 GHz BSS that operate a 17/24 GHz BSS space station,
paragraph (d)(2)(v) to read as follows: complies with the technical rules in this in cases where there is a previously
part and that will be located at least four licensed or proposed space station
§ 25.117 Modification of station license.
degrees from the proposed space station. operating pursuant to § 25.262(b) of this
* * * * * (4) Except as described in paragraph part located within four degrees of the
(d) * * * (b)(5) of this section, an applicant for a applicant’s proposed 17/24 GHz BSS
(2) * * * license to operate a 17/24 GHz BSS space station, must provide an
(v) Any 17/24 GHz BSS space station space station that will not be located interference analysis of the kind
operator whose license is conditioned to precisely at one of the nominal 17/24 described in paragraph (b)(2) of this
operate at less than the power level GHz BSS orbital locations specified in section, except that the applicant must
otherwise permitted by §§ 25.208(c) Appendix F of the Report and Order demonstrate that its proposed
and/or (w) of this part, and is adopted May 2, 2007, IB Docket No. 06– operations will not cause more
conditioned to accept interference from 123, FCC 07–76, must make one of the interference to the adjacent 17/24 GHz
a neighboring 17/24 GHz BSS space following showings: BSS satellite network than if the
station, may file a modification (i) In cases where there is no adjacent space station were located four
application to remove those two previously licensed or proposed space degrees from the applicant’s space
conditions in the event that the license station to be located closer than four station.
for that neighboring space station is degrees from the applicant’s space (6) In addition to the requirements of
cancelled or surrendered. In the event station, and the applicant seeks to paragraphs (b)(3), (b)(4), and (b)(5) of
that two or more such modification operate pursuant to § 25.262(b) of this this section, the link budget for any
applications are filed, and those part, the applicant must provide an satellite in the 17/24 GHz BSS must take
applications are mutually exclusive, the interference analysis of the kind into account longitudinal stationkeeping
modification applications will be described in paragraph (b)(2) of this tolerances and, where appropriate, any
considered on a first-come, first-served section, except that the applicant must existing orbital location offsets from the
basis pursuant to the procedure set forth demonstrate the compatibility of its 17/24 GHz BSS orbital locations of the
in § 25.158 of this part. proposed network with any current or adjacent prior-authorized 17/24 GHz
* * * * * future authorized space stations in the BSS space stations. In addition, any 17/
■ 4. Amend § 25.140 by revising 17/24 GHz BSS that are operating in 24 GHz BSS satellite applicant that has
paragraphs (b)(2) and (b)(3), by adding compliance with the technical rules of reached a coordination agreement with
paragraphs (b)(4), (b)(5), and (b)(6), and this part and that will be located at least an operator of another 17/24 GHz BSS
by revising paragraph (c) to read as four degrees from the applicant’s satellite to allow that operator to exceed
follows: proposed space station; the pfd levels specified in the rules for
(ii) In cases where there is a this service, must use those higher pfd
§ 25.140 Qualifications of fixed-satellite previously licensed or proposed 17/24 levels for the purposes of this showing.
space station licensees. GHz BSS space station to be located (c) Operators of satellite networks
* * * * * within four degrees of the applicant’s using 17/24 GHz BSS space stations
(b) * * * proposed space station, the applicant must design their satellite networks to
yshivers on PROD1PC62 with RULES

(2) Except as set forth in paragraphs must provide an interference analysis of be capable of operating with another 17/
(b)(3), (b)(4), (b)(5), and (b)(6) of this the kind described in paragraph (b)(2) of 24 GHz BSS space station as follows:
section, all applicants must provide an this section, except that the applicant (1) Except as described in paragraphs
interference analysis to demonstrate the must demonstrate that its proposed (b)(4)(ii) and (b)(4)(iii) of this section, all
compatibility of their proposed system network will not cause more satellite network operators using 17/24

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00053 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1
60280 Federal Register / Vol. 72, No. 205 / Wednesday, October 24, 2007 / Rules and Regulations

GHz BSS space stations must design for authority to operate a satellite at the (3) If no good faith agreement can be
their satellite networks to be capable of same power level and interference reached, the operator of the 17/24 GHz
operating with another 17/24 GHz BSS protection as the previous licensee at BSS satellite network that does not
space station as close as four degrees that orbit location, to the extent that comply with § 25.208(w) of this part
away. their proposed operations are consistent shall reduce its space-to-Earth power
(2) Satellite network operators located with the provisions of this part. Such flux-density levels to be compliant with
less than four degrees away from a space applications will be considered those specified in § 25.208(w) of this
station to be operated pursuant to pursuant to the first-come, first-served part.
§ 25.262(b) of this part must design their procedures set forth in § 25.158 of this
satellite networks to be capable of part. [FR Doc. E7–20971 Filed 10–23–07; 8:45 am]
operating with that adjacent 17/24 GHz (d) Any U.S. licensee or permittee BILLING CODE 6712–01–P
BSS space station. using a 17/24 GHz BSS space station
(3) Satellite network operators using that is located less than four degrees
17/24 GHz BSS space stations located at away from a prior-authorized 17/24 GHz DEPARTMENT OF COMMERCE
an orbital location other than those BSS space station that is authorized to
specified in Appendix F of the Report operate in accordance with paragraph National Oceanic and Atmospheric
and Order adopted May 2, 2007, IB (b) of this section: Administration
Docket No. 06–123, FCC 07–76, and that (1) may not cause any more
are not operating pursuant to § 25.262(b) interference to the adjacent satellite 50 CFR Part 229
of this part, must design their satellite network than would be caused if the
[Docket No. 071011590–7610–02]
networks to be capable of operating with adjacent 17/24 GHz BSS space station
another 17/24 GHz BSS space station were located four degrees away from the RIN 0648–XD38
closer than four degrees away, as a proposed space station; and
result of the operator’s offset position. (2) must accept any increased Taking of Marine Mammals Incidental
* * * * * interference that results from the to Commercial Fishing Operations;
adjacent space station network Atlantic Large Whale Take Reduction
■ 5. Revise § 25.262 to read as follows:
operating at the offset orbital location Plan
§ 25.262 Licensing and domestic less than four degrees away. AGENCY: National Marine Fisheries
coordination requirements for 17/24 GHz (e) Any 17/24 GHz BSS U.S. licensee
BSS space stations. Service (NMFS), National Oceanic and
or permittee that is required to provide
Atmospheric Administration (NOAA),
(a) Except as described in paragraphs information in its application pursuant
Commerce.
(b), (c) or (e) of this section, applicants to §§ 25.140(b)(4)(ii) or (b)(4)(iii) of this
seeking to operate a space station in the part must accept any increased ACTION: Notification of rescission of
17/24 GHz BSS must locate that space interference that may result from temporary rule and reopening of DAM
station at one of the orbital positions adjacent 17/24 GHz BSS space stations zone to normal fishing operations.
described in Appendix F of the Report that are operating in compliance with SUMMARY: The Assistant Administrator
and Order adopted May 2, 2007, IB the rules for this service. for Fisheries (AA), NOAA, announces
Docket No. 06–123, FCC 07–76. (f) Any 17/24 GHz BSS U.S. licensee
the rescission of temporary restrictions
(b) An applicant may be authorized to or permittee that does not comply with
consistent with the requirements of the
operate a 17/24 GHz BSS space station the power flux-density limits set forth in
Atlantic Large Whale Take Reduction
at an orbital location described in § 25.208(w) of this part shall bear the
Plan’s (ALWTRP) implementing
Appendix F as set forth in paragraph (a) burden of coordinating with any future
regulations. These regulations applied
of this section, or at a location with a co-frequency licensees and permittees of
to lobster trap/pot and anchored gillnet
geocentric angular separation of one a 17/24 GHz BSS network under the
fishermen in an area totaling
degree or less from an Appendix F following circumstances:
(1) If the operator’s space-to-Earth approximately 841 nm2 (2,885 km2),
location, and may operate at the
power flux-density levels exceed the southeast of Machias, Maine, for 15
maximum power flux density limits
power flux-density limits set forth in days. The purpose of this action is to
defined in §§ 25.208(c) and (w) of this
§ 25.208(w) of this part by 3 dB or less, provide notice that an October 17, 2007
part, without coordinating its power
the operator shall bear the burden of survey indicated that North Atlantic
flux density levels with adjacent
coordinating with any future operators right whales (right whales) are no longer
licensed or permitted operators, only if
proposing a 17/24 GHz BSS space present in the Dynamic Area
there is no licensed 17/24 GHz BSS
station in compliance with power flux- Management (DAM) zone; therefore,
space station or prior-filed application
density limits set forth in § 25.208(w) of NMFS has rescinded the temporary
at a location less than four degrees from
this part and located within ±6 degrees restrictions on lobster trap/pot and
the offset orbital location at which the
of the operator’s 17/24 GHz BSS space anchored gillnet fishing gear and
applicant proposes to operate.
(c)(1) Notwithstanding the provisions station. reopened the DAM zone to normal
of this section, licensees and permittees (2) If the operator’s space-to-Earth fishing operations.
will be allowed to apply for a license or power flux-density levels exceed the DATES: The DAM zone and associated
authorization for a replacement satellite power flux-density limits set forth in gear restrictions are removed effective
that will be operated at the same power § 25.208(w) of this part by more than 3 October 19, 2007.
level and interference protection as the dB, the operator shall bear the burden ADDRESSES: Copies of the proposed and
satellite to be replaced. of coordinating with any future final Dynamic Area Management (DAM)
(2) In addition, applicants for licenses operators proposing a 17/24 GHz BSS rules, Environmental Assessments
yshivers on PROD1PC62 with RULES

or authority for a satellite to be operated space station in compliance with power (EAs), Atlantic Large Whale Take
at an orbit location that was made flux-density limits set forth in Reduction Team (ALWTRT) meeting
available after a previous 17/24 GHz § 25.208(w) of this part and located summaries, and progress reports on
BSS license was cancelled or within ±10 degrees of the operator’s 17/ implementation of the ALWTRP may
surrendered will be permitted to apply 24 GHz BSS space station. also be obtained by writing Diane

VerDate Aug<31>2005 15:22 Oct 23, 2007 Jkt 214001 PO 00000 Frm 00054 Fmt 4700 Sfmt 4700 E:\FR\FM\24OCR1.SGM 24OCR1

S-ar putea să vă placă și