Documente Academic
Documente Profesional
Documente Cultură
PLACE: Board Room, 7th Floor, Room Juan Lopez-Bautista, Permit No. 2008– located in West Feliciana Parish,
7047, 1775 Duke Street, Alexandria, VA 018 Louisiana.
22314–3428. Sam Feola, Permit No. 2008–019 The proposed amendment would
STATUS: Open. William R. Fraser, Permit No. 2008–020 have revised the facility Technical
MATTERS TO BE CONSIDERED:
Specifications and the operating license.
Nadene G. Kennedy, The proposed change would have added
1. Quarterly Insurance Fund Report. Permit Officer.
2. Board Briefing: Part 717 of NCUA’s a License Condition 2.C to the Facility
[FR Doc. E7–20668 Filed 10–19–07; 8:45 am] Operating License NPF–47 that allows
Rules and Regulations, Interagency
Final Rule and Guidelines on Identity BILLING CODE 7555–01–P River Bend Station, Unit 1, Technical
Theft Red Flags and Address Specifications surveillance intervals to
Discrepancies. be extended on a one-time basis for the
3. Board Briefing: Part 717 of NCUA’s NEIGHBORHOOD REINVESTMENT 14th Fuel Cycle to account for the
Rules and Regulations, Interagency CORPORATION effects of a delayed refueling outage.
Final Rule on Affiliate Marketing. The Commission had previously
4. Final Rule: Section 701.2 of Neighborworks America Regular issued a Notice of Consideration of
NCUA’s Rules and Regulations, Federal Board of Directors Meeting; Sunshine Issuance of Amendment published in
Credit Union Bylaws. Act the Federal Register on October 9, 2007
(72 FR 57354). However, by letter dated
RECESS: 11 a.m. TIME AND DATE: 2 p.m., Wednesday, October 3, 2007, the licensee withdrew
TIME AND DATE: 11:15 a.m., Thursday, October 24, 2007. the proposed change.
October 25, 2007. PLACE: 1325 G Street, NW., Suite 800, For further details with respect to this
PLACE: Board Room, 7th Floor, Room Boardroom, Washington, DC 20005. action, see the application for
7047, 1775 Duke Street, Alexandria, VA amendment dated September 13, 2007,
STATUS: Open.
22314–3428. and the licensee’s letter dated October 3,
CONTACT PERSON FOR MORE INFORMATION:
STATUS: Closed. 2007, which withdrew the application
Erica Hall, Assistant Corporate for license amendment. Documents may
MATTERS TO BE CONSIDERED: Secretary, (202) 220–2376;
1. One (1) Merger Application under be examined, and/or copied for a fee, at
ehall@nw.org. the NRC(s Public Document Room
Parts 704 and 708b of NCUA’s Rules
AGENDA: (PDR), located at One White Flint North,
and Regulations. Closed pursuant to
Exemption (8). I. Call to Order. Public File Area O1 F21, 11555
2. One (1) Insurance Appeal. Closed II. Approval of the Minutes. Rockville Pike (first floor), Rockville,
pursuant to Exemption (6). III. Summary Report of the Finance, Maryland. Publicly available records
Budget and Program Committee. will be accessible electronically from
FOR FURTHER INFORMATION CONTACT:
IV. Summary Report of the Audit the Agencywide Documents Access and
Mary Rupp, Secretary of the Board,
Committee. Management System (ADAMS) Public
Telephone: 703–518–6304.
V. Summary Report of the Audit Electronic Reading Room on the internet
Mary Rupp, Committee. at the NRC Web site, http://
Secretary of the Board. VI. Summary Report of the Corporate www.nrc.gov/reading-rm.html. Persons
[FR Doc. 07–5230 Filed 10–18–07; 3:18 pm] Administration Committee. who do not have access to ADAMS or
BILLING CODE 7535–01–M VII. Financial Report. who encounter problems in accessing
VIII. Corporate Scorecard. the documents located in ADAMS
IX. Chief Executive Officer’s Quarterly should contact the NRC PDR Reference
NATIONAL SCIENCE FOUNDATION Management Report. staff by telephone at 1–800–397–4209,
X. Field Operations Presentation. or 301–415–4737 or by e-mail to
Notice of Permits Issued Under the Adjournment. pdr@nrc.gov.
Antarctic Conservation Act of 1978 Erica L. Hall Dated at Rockville, Maryland, this 15th day
of October 2007.
AGENCY: National Science Foundation. Assistant Corporate Secretary.
For the Nuclear Regulatory Commission.
ACTION: Notice of permits issued under [FR Doc. 07–5225 Filed 10–18–07; 2:12 pm]
Bhalchandra Vaidya,
the Antarctic Conservation of 1978, BILLING CODE 7570–02–M
Project Manager, Plant Licensing Branch IV,
Public Law 95–541. Division of Operating Reactor Licensing,
SUMMARY: The National Science Office of Nuclear Reactor Regulation.
NUCLEAR REGULATORY [FR Doc. E7–20738 Filed 10–19–07; 8:45 am]
Foundation (NSF) is required to publish COMMISSION
notice of permits issued under the BILLING CODE 7590–01–P
Antarctic Conservation Act of 1978. [Docket No. 50–458]
This is the required notice.
Entergy Operations, Inc.; Notice of NUCLEAR REGULATORY
FOR FURTHER INFORMATION CONTACT:
Withdrawal of Application for COMMISSION
Nadene G. Kennedy, Permit Office,
Amendment to Facility Operating [Docket No. 40–9027]
Office of Polar Programs, Rm. 755,
License
National Science Foundation, 4201
Wilson Boulevard, Arlington, VA 22230. Notice of Availability of Final
The U.S. Nuclear Regulatory
Environmental Assessment and
SUPPLEMENTARY INFORMATION: On Commission (the Commission) has
Finding of No Significant Impact for
September 7, 2007 and September 13, granted the request of Entergy
ebenthall on PRODPC61 with NOTICES
VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices 59559
ACTION: Notice of availability and measurements, and performing historic and cultural resources. The
finding of no significant impact. radiological analysis of surface and proposed action can be viewed as a
subsurface samples. Contaminated areas continuation of impacts and can be
SUMMARY: Notice is hereby given that
of the main building area were evaluated based on the previous impacts
the U.S. Nuclear Regulatory remediated in a series of cleanup from past operations. In making this
Commission (NRC) is issuing a final actions in the early 1990s. Cabot determination, the staff considered
Environmental Assessment (EA) for originally submitted the impacts to such areas as public and
Cabot Corporation (Cabot or the decommissioning plan (DP) in 1998 and occupational health, transportation,
licensee) Decommissioning Plan (DP), has revised it several times to address socioeconomics, ecology, water quality,
dated August 21, 2006, which requested various NRC concerns. On August 21, and the effects of natural phenomena.
authorization to commence 2006, Cabot submitted Revision 4 of its Further details regarding the staff’s
decommissioning activities to achieve
proposed DP which proposes environmental evaluation of the
unrestricted release of a site in Reading,
installation of a riprap erosion barrier at proposed action are set forth in the EA
Pennsylvania. The final EA makes a
the site. The NRC has prepared an (ML072390296)
finding of no significant impact (FONSI)
environmental assessment (EA) in
for the proposed action, and is being Agencies and Persons Consulted
support of this action in accordance
issued as part of the NRC’s decision-
with the requirements of 10 CFR part The staff completed consultations
making process on whether to issue an
51. Based on the EA, the NRC has with the U.S. Fish and Wildlife Service
amendment to license SMC–1562,
concluded that a Finding of No (FWS) for consideration under Section 7
pursuant to Title 10 of the U.S. Code of
Significant Impact is appropriate. If of the Endangered Species Act and with
Federal Regulations Part 40, ‘‘Domestic
Licensing of Source Material Licenses.’’ approved, the license amendment the Pennsylvania State Historic
The proposed DP specifies installation incorporating the DP would be issued Preservation Office (SHPO) for
of a riprap erosion barrier on the site following publication of this Notice. consideration under Section 106 of the
slope. The site is owned by the City of National Historic Preservation Act. In
II. EA Summary
Reading and is located in a large addition the staff provided the draft EA
redevelopment area. Tentative City The Proposed Action to the Pennsylvania Department of
plans are for industrial activities in a Cabot requested approval of its DP, Environmental Protection (PADEP)
new structure to be built on top of the which would allow it to conduct officials for comment. An addendum to
slope, adjacent to the Cabot site. The decommissioning activities at the site. If the final EA sets forth the PADEP
site itself will not be developed. approved and properly implemented, comments and the NRC’s responses, and
FOR FURTHER INFORMATION CONTACT: the DP would eventually lead to the provides a history of operations at the
Theodore Smith, Project Manager, termination of its NRC source materials site.
Reactor Decommissioning Branch, license. In its DP, Cabot proposed to III. Finding of No Significant Impact
Division of Waste Management and place a riprap erosion cover on the slag
Environmental Protection, Mail Stop pile’s slope and provided analysis to The final EA supports the proposed
T8–F5, U.S. Nuclear Regulatory demonstrate that the site will be action to issue a license amendment
Commission, Washington, DC 20555– acceptable for license termination under approving Cabot’s DP for the Reading
0001. Telephone: (301) 415–6721; unrestricted release. site. On the basis of this EA, NRC has
e-mail: tbs1@nrc.gov. concluded that there are no significant
Need for the Proposed Action environmental impacts from the
SUPPLEMENTARY INFORMATION:
The purpose of this action is to proposed action, and that preparation of
I. Introduction decommission an NRC-licensed site, an Environmental Impact Statement is
Cabot Corporation (Cabot) holds U.S. allowing for its unrestricted use and not warranted. Accordingly, it has been
Nuclear Regulatory Commission (NRC) termination of the source material determined that a Finding of No
Source Materials License SMC–1562, license. This action is required by 10 Significant Impact is appropriate.
allowing the storage of radioactive CFR 40.42, ‘‘Expiration and Termination IV. Further Information
materials at Cabot’s Reading, of Licenses and Decommissioning of
Pennsylvania, site. Former ore Sites and Separate Buildings or Outdoor Documents related to this action,
processing in the 1960s at the facility Areas.’’ including the application for
generated waste slag contaminated with amendment and supporting
Environmental Impacts of the Proposed documentation, are available
uranium and thorium. A smaller
Action electronically at the NRC’s Electronic
amount of debris from facility
decontamination was added to the site The NRC staff concluded that the Reading Room at http://www.nrc.gov/
in the late 1970s. In the 1980s, Cabot proposed decommissioning activities reading-rm/adams.html. From this site,
began onsite decommissioning activities will not result in a significant impact to you can access the NRC’s Agencywide
at the main processing building at its the environment. No significant impacts Document Access and Management
Reading site, and began preparing for to the site ecology are anticipated System (ADAMS), which provides text
decommissioning activities at Reading because of the proposed action. The and image files of NRC’s public
site slag pile by conducting site proposed action will not adversely documents. The ADAMS accession
characterization, determining slag leach affect Federal or State-listed threatened numbers for the documents related to
rate constants, taking surface gamma or endangered species, or regional this notice are:
VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
59560 Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices
If you do not have access to ADAMS or accordance with Entergy’s application The proposed action will not
if there are problems in accessing the dated April 24, 2007. significantly increase the probability or
documents located in ADAMS, contact consequences of accidents. No changes
The Need for the Proposed Action
the NRC’s Public Document Room (PDR) are being made in the types of effluents
Reference staff at 1–800–397–4209, 301– The NRC’s regulations in 10 CFR part that may be released off site. There is no
415–4737, or by e-mail to pdr@nrc.gov. 50, section 50.46 and Appendix K, make significant increase in the amount of
These documents may also be viewed no provision for use of fuel rod clad in any effluent released off site. There is no
electronically on the public computers a material other than Zircaloy or significant increase in occupational or
located at the NRC’s PDR, O1–F21, One ZIRLOTM. Optimized ZIRLOTM has a public radiation exposure. Therefore,
White Flint North, 11555 Rockville lower tin content than either Zircaloy or there are no significant radiological
Pike, Rockville, MD 20852. The PDR ZIRLOTM; therefore, use of Optimized environmental impacts associated with
reproduction contractor will copy ZIRLOTM fuel rod clad calls for an the proposed action.
documents for a fee. exemption from 10 CFR part 50, section With regard to potential non-
Dated at Rockville, Maryland, this 12th day 50.46 and Appendix K. radiological impacts, the proposed
of October 2007. For cladding with a lower tin content, action does not have a potential to affect
For the Nuclear Regulatory Commission. corrosive resistance has been found to any historic sites. It does not affect non-
Andrew Persinko, improve, as indicated by available radiological plant effluents and has no
industry data from the American other environmental impact. Therefore,
Branch Chief, Reactor Decommissioning
Branch, Division of Waste Management and Nuclear Society, the International there are no significant non-radiological
Environmental Protection, Office of Federal Atomic Energy Agency, the Electric environmental impacts associated with
and State Materials and Environmental Power Research Institute, and the proposed action.
Management Programs. Westinghouse Electric Corporation. The Accordingly, the NRC concludes that
[FR Doc. E7–20746 Filed 10–19–07; 8:45 am] optimum tin level provides a reduced there are no significant environmental
BILLING CODE 7590–01–P corrosion rate while maintaining the impacts associated with the proposed
benefits of mechanical strength and action.
resistance to accelerated corrosion from Environmental Impacts of the
NUCLEAR REGULATORY abnormal chemistry conditions. In Alternatives to the Proposed Action
COMMISSION addition, fuel rod internal pressures
(resulting from increased fuel duty, use As an alternative to the proposed
[Docket No. 50–382] action, the staff considered denial of the
of integral fuel burnable absorbers and
corrosion/temperature feedback effects) proposed action (i.e., the ‘‘no-action’’
Entergy Operations, Inc.; Waterford alternative). Denial of the application
Steam Electric Station, Unit 3 have become more limiting with respect
to fuel rod design criteria. Reducing the would result in no change in current
Environmental Assessment and environmental impacts. The
Finding of No Significant Impact associated corrosion buildup, and thus,
minimizing temperature feedback environmental impacts of the proposed
The U.S. Nuclear Regulatory effects, provides additional margin to action and the ‘‘no-action’’ alternative
Commission (NRC) is considering fuel rod internal pressure design are similar.
issuance of exemptions from Title 10 of criteria. The NRC previously granted a Alternative Use of Resources
the Code of Federal Regulations (10 similar exemption in July 2004 for
CFR) Part 50, Section 50.46 and The action does not involve the use of
Waterford 3 for use of Optimized any different resources than those
Appendix K, for Facility Operating ZIRLOTM in four lead-test assemblies.
License No. NPF–38, issued to Entergy previously considered in the Final
Operations, Inc. (Entergy, the licensee), Environmental Impacts of the Proposed Environmental Statement for Waterford
for operation of the Waterford Steam Action 3, dated September 1981.
Electric Station, Unit 3 (Waterford 3), The NRC staff has completed its safety Agencies and Persons Consulted
located in St. Charles Parish, Louisiana. evaluation of the proposed action and In accordance with its stated policy,
Therefore, as required by 10 CFR 51.21, concludes that the proposed exemptions on August 17, 2007, the staff consulted
the NRC is issuing this environmental would continue to satisfy the with the Louisiana State official, Ms.
assessment and finding of no significant underlying purpose of 10 CFR part 50, Nan Calhoun of the Louisiana
impact. sections 50.46 and Appendix K, and Department of Environmental Quality,
Environmental Assessment will not increase the probability or regarding the environmental impact of
consequences of accidents previously the proposed action. The State official
Identification of the Proposed Action analyzed and would not affect facility had no comments.
The proposed action would exempt radiation levels or facility radiological
the licensee from the requirements of 10 effluents. Finding of No Significant Impact
ebenthall on PRODPC61 with NOTICES
CFR part 50, section 50.46 and The details of the staff’s safety On the basis of the environmental
Appendix K to allow the use of evaluation will be provided in the assessment, the NRC concludes that the
Optimized ZIRLOTM fuel rod cladding exemption that will be issued as part of proposed action will not have a
as the allowable fuel rod cladding the letter to the licensee approving the significant effect on the quality of the
material. The proposed action is in amendment to the regulation. human environment. Accordingly, the
VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00050 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1