Sunteți pe pagina 1din 2

59574 Federal Register / Vol. 72, No.

203 / Monday, October 22, 2007 / Notices

staff (301–415–8439), between 7:30 a.m. Commission, Washington, DC 20555– 20852–2738. The PDR’s mailing address
and 4 p.m., (ET). ACRS meeting agenda, 0001, telephone: 301–415–6373 or e- is U.S. NRC PDR, Washington, DC
meeting transcripts, and letter reports mail MPO1@nrc.gov. 20555–0001. The PDR staff can be
are available through the NRC Public SUPPLEMENTARY INFORMATION: reached by telephone at 301–415–4737
Document Room at pdr@nrc.gov, or by or 800–397–4209, by fax at 301–415–
calling the PDR at 1–800–397–4209, or I. Introduction 3548, and by e-mail to pdr@nrc.gov.
from the Publicly Available Records The U.S. Nuclear Regulatory Regulatory Guides are not copyrighted
System (PARS) component of NRC’s Commission (NRC) is withdrawing and NRC approval is not required to
document system (ADAMS) which is Regulatory Guide 9.1, ‘‘Regulatory Staff reproduce them.
accessible from the NRC Web site at Position Statement on Antitrust
http://www.nrc.gov/reading-rm/ Matters,’’ published December 1973; Dated at Rockville, Maryland, this 12th day
Regulatory Guide 9.2, ‘‘Information of October, 2007.
adams.html or http://www.nrc.gov/
reading-rm/doc-collections/ (ACRS & Needed by the NRC Staff in Connection For the Nuclear Regulatory Commission.
ACNW Mtg schedules/agendas). with its Antitrust Review of Michael R. Johnson,
Video teleconferencing service is Construction Permit Applications for Deputy Director, Office of Nuclear Regulatory
available for observing open sessions of Nuclear Power Plants,’’ initially Research.
ACRS meetings. Those wishing to use published October 1974, and revised [FR Doc. E7–20730 Filed 10–19–07; 8:45 am]
this service for observing ACRS June 1976; and Regulatory Guide 9.3, BILLING CODE 7590–01–P
meetings should contact Mr. Theron ‘‘Information Needed by the AEC
Brown, ACRS Audio Visual Technician Regulatory Staff in Connection with its
(301–415–8066), between 7:30 a.m.–and Antitrust Review of Operating License NUCLEAR REGULATORY
3:45 p.m., (ET), at least 10 days before Applications for Nuclear Power Plants,’’ COMMISSION
the meeting to ensure the availability of published October 1974. The NRC is
this service. Individuals or withdrawing these three regulatory Withdrawal of Regulatory Guide
organizations requesting this service guides because they are no longer
will be responsible for telephone line required. AGENCY:Nuclear Regulatory
charges and for providing the These three regulatory guides address Commission.
equipment and facilities that they use to the antitrust review conducted by the
staff during the evaluation of new plant ACTION: Withdrawal of Regulatory Guide
establish the video teleconferencing 9.4.
link. The availability of video construction and operating license
teleconferencing services is not applications. The review was required
by Section 105.c of the Atomic Energy FOR FURTHER INFORMATION CONTACT:
guaranteed.
Act of 1954, as amended. Section 625 of Marquis P. Orr, U.S. Nuclear Regulatory
The ACRS meeting dates for Calendar
the Energy Policy Act of 2005 (Pub. L. Commission, Washington, DC 20555–
Year 2008 are provided below:
109–058) removed the NRC’s authority 0001, telephone: 301–415–6373 or e-
ACRS Meeting to perform these antitrust reviews for mail MPO1@nrc.gov.
Meeting dates applications submitted after the date of
No. SUPPLEMENTARY INFORMATION:
enactment of the law. The Energy Policy
— ................... January 2008 (No Meeting). Act of 2005 was passed by the U.S. I. Introduction
549 ................. February 7–9, 2008. Congress on July 29, 2005, and signed
550 ................. March 6–8, 2008. into law by President George W. Bush The U.S. Nuclear Regulatory
551 ................. April 3–5, 2008. Commission (NRC) is withdrawing
on August 8, 2005. Consequently, the
552 ................. May 8–10, 2008. Regulatory Guide 9.4, ‘‘Suggested
553 ................. June 4–6, 2008 (Wed—Fri). staff has determined that Regulatory
Guides 9.1, 9.2, and 9.3 are no longer Format for Cash Flow Statements
554 ................. July 9–11, 2008 (Wed—Fri).
— ................... August (No Meeting). required. Submitted as Guarantees of Payment of
555 ................. September 4–6, 2008. Retrospective Premiums,’’ which was
II. Further Information issued for comment in September 1978.
556 ................. October 2–4, 2008.
557 ................. November 6–8, 2008. The withdrawal of Regulatory Guides Regulatory Guide 9.4 proposes a format
558 ................. December 4–6, 2008. 9.1, 9.2, and 9.3 does not, in and of for cash flow statements to be submitted
itself, alter any prior or existing by the licensee to demonstrate
Dated: October 16, 2007. licensing commitments based on their compliance with title 10 of the Code of
Andrew L. Bates, use. The guidance provided in these Federal Regulations (10 CFR), subpart
regulatory guides is no longer 140.21, ‘‘Licensee guarantees of
Advisory Committee Management Officer.
applicable. Regulatory guides may be payment of deferred premiums.’’ The
[FR Doc. E7–20773 Filed 10–19–07; 8:45 am] method described in Regulatory Guide
withdrawn when their guidance is
BILLING CODE 7590–01–P 9.4 unnecessarily duplicates other
superseded by congressional action or
otherwise no longer provides useful financial and insurance verification
information. documents submitted by the licensees to
NUCLEAR REGULATORY
Regulatory guides are available for demonstrate compliance with other
COMMISSION
inspection or downloading through the sections of 10 CFR part 140. Rather than
Withdrawal of Regulatory Guides NRC’s public Web site under submit separate cash flow and financial
‘‘Regulatory Guides’’ in the NRC’s assurance statements, licensees may
AGENCY: Nuclear Regulatory Electronic Reading Room at http:// submit proof of sufficient insurance
Commission. www.nrc.gov/reading-rm/doc- bonding through American Nuclear
ebenthall on PRODPC61 with NOTICES

ACTION: Withdrawal of Regulatory collections. Regulatory guides are also Insurers or similar insurance groups.
Guides 9.1, 9.2, and 9.3. available for inspection at the NRC’s This insurance bond meets the
Public Document Room (PDR), Room O– requirements of 10 CFR 140.21(a) and
FOR FURTHER INFORMATION CONTACT: 1F21, One White Flint North, 11555 eliminates the need for a separate cash
Marquis P. Orr, U.S. Nuclear Regulatory Rockville Pike, Rockville, Maryland flow statement.

VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00064 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1
Federal Register / Vol. 72, No. 203 / Monday, October 22, 2007 / Notices 59575

II. Further Information performance review boards. The board Section 304(d) of the 1939 Act, in
Withdrawal of Regulatory Guide 9.4 reviews and evaluates the initial part, authorizes the Commission to
does not, in and of itself, alter any prior appraisal of a senior executive’s exempt conditionally or
or existing licensing commitments performance by the supervisor, and unconditionally any indenture from one
based on its use. The guidance provided considers recommendations to the or more provisions of the 1939 Act. The
in this regulatory guide is no longer appointing authority regarding the Commission may provide an exemption
necessary. Regulatory guides may be performance of the senior executive. under Section 304(d) if it finds that the
withdrawn when their guidance is U.S. Office of Personnel Management. exemption is necessary or appropriate
superseded by congressional action, the Linda M. Springer,
in the public interest and consistent
methods or techniques described in the with the protection of investors and the
Director.
regulatory guide no longer describe a purposes fairly intended by the 1939
The following have been designated Act.
preferred approach, or the regulatory as members of the Performance Review
guide does not provide useful Section 314(d) requires the obligor to
Board of the U.S. Office of Personnel furnish to the indenture trustee
information. Management:
Regulatory guides are available for certificates or opinions of fair value
Howard C. Weizmann, Deputy from an engineer, appraiser or other
inspection or downloading through the Director—Chair
NRC’s public Web site under expert upon any release of collateral
Patricia L. Hollis, Chief of Staff and from the lien of the indenture. The
‘‘Regulatory Guides’’ in the NRC’s Director of External Affairs
Electronic Reading Room at http:// engineer, appraiser or other expert must
Mark Reger, Chief Financial Officer opine that the proposed release will not
www.nrc.gov/reading-rm/doc- Robert F. Danbeck, Managing Director,
collections. Regulatory guides are also impair the security under the indenture
Retirement Systems Modernization in contravention of the provisions of the
available for inspection at the NRC’s Nancy H. Kichak, Associate Director,
Public Document Room (PDR), Room O– indenture. The application requests an
Strategic Human Resources Policy exemption from Section 314(d) for
1F21, One White Flint North, 11555 Division
Rockville Pike, Rockville, MD 20852– specified dispositions of collateral that
Kevin E. Mahoney, Associate Director, are made in Iusacell Celular’s and the
2738. The PDR’s mailing address is U.S. Human Capital Leadership and Merit
NRC PDR, Washington, DC 20555–0001. guarantors’ ordinary course of business.
System Accountability Division In its application, Iusacell Celular
The PDR staff can be reached by Kathy L. Dillaman, Associate Director,
telephone at 301–415–4737 or 800–397– alleges that:
Federal Investigative Services 1. The indentures permit Iusacell
4209, by fax at 301–415–3548, and by e- Division Celular and the guarantors to dispose of
mail to pdr@nrc.gov. Ronald C. Flom, Associate Director,
Regulatory guides are not copyrighted collateral in the ordinary course of their
Management Services Division and business;
and NRC approval is not required to Chief Human Capital Officer 2. Iusacell Celular and the guarantors
reproduce them. Kerry B. McTigue, General Counsel will deliver to the trustee annual
Dated at Rockville, Maryland, this 12th day Mark D. Reinhold, Deputy Associate consolidated financial statements
of October 2007. Director for Human Capital audited by certified independent
For the Nuclear Regulatory Commission. Management Services—Executive accountants; and
Michael R. Johnson, Secretariat 3. Iusacell Celular and the guarantors
Deputy Director, Office of Nuclear Regulatory [FR Doc. E7–20636 Filed 10–19–07; 8:45 am]
will deliver to the trustee a semi-annual
Research. certificate stating that all dispositions of
BILLING CODE 6325–45–P
[FR Doc. E7–20742 Filed 10–19–07; 8:45 am] collateral during the relevant six-month
BILLING CODE 7590–01–P period occurred in Iusacell Celular’s
and the guarantors’ ordinary course of
SECURITIES AND EXCHANGE business and that all of the proceeds
COMMISSION were used as permitted by the
OFFICE OF PERSONNEL
MANAGEMENT [Release No. 39–2449; File No. 22–28859] indentures.
Any interested persons should look to
SES Performance Review Board Application and Opportunity for the application for a more detailed
Hearing: Grupo Iusacell Celular, S.A. statement of the asserted matters of fact
AGENCY: Office of Personnel de C.V. and law. The application is on file in
Management. the Commission’s Public Reference
ACTION: Notice. October 15, 2007.
Section, File Number 22–28859, 100 F
The Securities and Exchange Street, NE., Washington, DC 20549.
SUMMARY: Notice is hereby given of the Commission gives notice that Grupo The Commission also gives notice that
appointment of members of the OPM Iusacell Celular, S.A. de C.V. has filed any interested persons may request, in
Performance Review Board. an application under section 304(d) of writing, that a hearing be held on this
FOR FURTHER INFORMATION CONTACT: the Trust Indenture Act of 1939. Iusacell matter. Interested persons must submit
Mark Reinhold, Center for Human Celular asks the Commission to exempt those requests to the Commission no
Capital Management Services, Office of from the certificate or opinion delivery later than November 14, 2007. Interested
Personnel Management, 1900 E Street, requirements of section 314(d) of the persons must include the following in
NW., Washington, DC 20415, (202) 606– 1939 Act certain provisions of their request for a hearing on this
1402. indentures between Iusacell Celular, matter:
SUPPLEMENTARY INFORMATION: Section certain guarantors and Law Debenture —The nature of that person’s interest;
ebenthall on PRODPC61 with NOTICES

4314(c)(1) through (5) of Title 5, U.S.C., Trust Company of New York, as trustee. —The reasons for the request; and
requires each agency to establish, in The indentures relate to Senior Floating —The issues of law or fact raised by
accordance with regulations prescribed Rate First Lien Notes due 2011 and 10% the application that the interested
by the U.S. Office of Personnel Senior Subordinated Second Lien Notes person desires to refute or request a
Management, one or more SES due 2012. hearing on.

VerDate Aug<31>2005 15:02 Oct 19, 2007 Jkt 214001 PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 E:\FR\FM\22OCN1.SGM 22OCN1

S-ar putea să vă placă și