Sunteți pe pagina 1din 2

59084 Federal Register / Vol. 72, No.

201 / Thursday, October 18, 2007 / Notices

[FR Doc. 07–4828 Filed 10–17–07; 8:45 am] SUMMARY: Pursuant to section 102(2)(c) published in the Federal Register on
BILLING CODE 5001–06–C of the National Environmental Policy February 8, 2000 (65 FR 6181). The
Act (NEPA) of 1969, and the regulations limited purpose of this SEIS is to
implemented by the Council on supplement the traffic analysis
DEPARTMENT OF DEFENSE Environmental Quality (40 CFR parts contained in the 1999 FEIS, to assess
1500 through 1508), the Department of potential new information, validate
Department of the Navy the Navy (DON) announces its intent to impacts to traffic and to analyze the
prepare a Supplemental Environmental effectiveness of existing traffic
Notice of Intent To Prepare a
Impact Statement (SEIS). This SEIS mitigation measures implemented per
Supplemental Environmental Impact
supplements the Navy’s 1999 Final the 2000 ROD when three CVNs home
Statement to the Final Environmental
mstockstill on PROD1PC66 with NOTICES

Environmental Impact Statement (FEIS), ported at Naval Air Station North Island
Impact Statement and Notice of
‘‘Developing Home Port Facilities for (NASNI), California are simultaneously
Request for Public Scoping Comments
Three NIMITZ-Class Aircraft Carriers in in port.
AGENCY: Department of the Navy, DoD. Support of the U.S. Pacific Fleet,’’ as Completion of the SEIS is necessary
authorized by the Record of Decision under 40 CFR 1502.9 to assess potential
ACTION: Notice.
EN18OC07.002</GPH>

(ROD) dated January 28, 2000 and new information and to validate impacts

VerDate Aug<31>2005 21:55 Oct 17, 2007 Jkt 214001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\18OCN1.SGM 18OCN1
Federal Register / Vol. 72, No. 201 / Thursday, October 18, 2007 / Notices 59085

to traffic during infrequent periods FOR FURTHER INFORMATION CONTACT: Ms. number excluding the last three digits in
when three CVNs home ported at Ann Rosenberry, Naval Facilities the docket number field to access the
NASNI are simultaneously in port. The Engineering Command Southwest, 2730 document. For assistance, call (866)
SEIS will analyze the effectiveness of McKean St., Building 291, San Diego, 208–3676 or TTY, (202) 502–8659.
existing traffic mitigation measures CA 92136; telephone: 619–556–7368, Any questions regarding the
implemented per the 2000 ROD under facsimile: 619–556–0195. application should be directed to:
these conditions. The SEIS will evaluate SUPPLEMENTARY INFORMATION: The Navy Richard L. Derryberry, Director of
impacts such as changes in local traffic is initiating the scoping process to Regulatory Affairs, El Paso Natural Gas
conditions, changes in personnel identify community concerns and local Company, P.O. Box 1087, Colorado
loading and potential changes in CVN issues to be addressed in the SEIS. Springs, Colorado 80944 at (719) 520–
operational deployment and Federal agencies, State agencies, local 3782 or by fax at (719) 667–7534.
maintenance schedules that could affect agencies, and interested persons are Pursuant to section 157.9 of the
the average number of days three encouraged to provide comments to the Commission’s rules, 18 CFR.157.9,
carriers are simultaneously in port. The Navy to identify specific issues or topics within 90 days of this Notice the
SEIS will also evaluate the effects of of environmental concern that should be Commission staff will either: Complete
traffic mitigation measures implemented addressed in the SEIS. Written its environmental assessment (EA) and
pursuant to the 2000 ROD. Past, present comments must be postmarked within place it into the Commission’s public
and reasonably foreseeable future thirty days from the publication of this record (eLibrary) for this proceeding, or
regional actions impacting traffic will be notice in the Federal Register. Notices issue a Notice of Schedule for
examined from a cumulative impacts announcing the intent to prepare a SEIS Environmental Review. If a Notice of
perspective. will also appear in local newspapers in Schedule for Environmental Review is
In addition, the SEIS will address both English and Spanish. As the SEIS issued, it will indicate, among other
infrastructure improvements for Berth milestones, the anticipated date for the
process progresses, the public may
LIMA, which include utilities upgrades Commission staff’s issuance of the final
obtain updates by logging on to http://
previously analyzed under the 1999 environmental impact statement (FEIS)
www.nimitzcarriersseis.com which is
FEIS and newly defined site or EA for this proposal. The filing of the
linked to the Commander, Naval Air
improvements and other minor EA in the Commission’s public record
Force Pacific Public Affairs Web site
alterations to existing infrastructure. for this proceeding or the issuance of a
found at http://www.cnaf.navy.mil.
Utilities upgrades include: repairs and Notice of Schedule for Environmental
Dated: October 11, 2007. Review will serve to notify federal and
upgrades to electrical power,
T.M. Cruz, state agencies of the timing for the
communications and information
systems, security lighting, fire
Lieutenant, Judge Advocate General’s Corps, completion of all necessary reviews, and
U.S. Navy, Federal Register Liaison Officer. the subsequent need to complete all
protection, steam, compressed air,
[FR Doc. E7–20577 Filed 10–17–07; 8:45 am] federal authorizations within 90 days of
potable water, wastewater and fueling
BILLING CODE 3810–FF–P the date of issuance of the Commission
systems. Site improvements and other
staff’s FEIS or EA.
alterations include: Demolition of There are two ways to become
existing fenders, moorings, and pier involved in the Commission’s review of
pavement; installation of new fender DEPARTMENT OF ENERGY
this project. First, any person wishing to
pile system (with 200–300 fender piles) obtain legal status by becoming a party
Federal Energy Regulatory
and mooring fittings; construction of to the proceedings for this project
Commission
Anti-Terrorism/Force Protection (AT/ should, on or before the below listed
FP) features (watch tower, guard kiosk, [Docket No. CP08–2–000]
comment date, file with the Federal
fencing and surveillance equipment); Energy Regulatory Commission, 888
and demolition, repair and paving of the El Paso Natural Gas Company; Notice
of Application First Street, NE., Washington, DC 20426,
wharf, sidewalks, curbing, storm water a motion to intervene in accordance
drainage features and vehicle parking October 11, 2007. with the requirements of the
areas; and landscaping. It is anticipated Take notice that on October 2, 2007, Commission’s Rules of Practice and
that the construction of infrastructure El Paso Natural Gas Company (El Paso), Procedure (18 CFR 385.214 or 385.211)
improvements to Berth LIMA will take Post Office Box 1087, Colorado Springs, and the Regulations under the NGA (18
approximately one year to accomplish. Colorado 80944, filed in Docket No. CFR 157.10). A person obtaining party
Public input is requested to ensure CP08–2–000, an application under status will be placed on the service list
the scope of the SEIS analysis section 7 of the Natural Gas Act (NGA) maintained by the Secretary of the
incorporates public concerns and and Part 157 of the Federal Energy Commission and will receive copies of
affords the public an input in the Regulatory Commission’s (Commission) all documents filed by the applicant and
decision making process. regulations for a certificate of public by all other parties. A party must submit
DATES AND ADDRESSES: The agency must convenience and necessity authorizing 14 copies of filings made with the
receive comments on or before the construction and operation of new Commission and must mail a copy to
November 19, 2007. Comments may be compression facilities and authorization the applicant and to every other party in
submitted by mail or electronically to abandon, in place, its existing Eunice the proceeding. Only parties to the
through the project Web site. Comments Mainline Compressor Station located in proceeding can ask for court review of
may be mailed to the following address: Lea County, New Mexico. Commission orders in the proceeding.
Naval Facilities Engineering Command El Paso’s proposal is more fully However, a person does not have to
mstockstill on PROD1PC66 with NOTICES

Southwest, Attention: Ms. Ann described as set forth in the application intervene in order to have comments
Rosenberry (Code OPME.AR), 2730 that is on file with the Commission and considered. The second way to
McKean St., Building 291, San Diego, open to public inspection. The instant participate is by filing with the
CA 92136. Comments may be submitted filing may be also viewed on the Web Secretary of the Commission, as soon as
electronically at the project Web site at: at http://www.ferc.gov using the possible, an original and two copies of
http://www.nimitzcarriersseis.com. ‘‘eLibrary’’ link. Enter the docket comments in support of or in opposition

VerDate Aug<31>2005 21:55 Oct 17, 2007 Jkt 214001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\18OCN1.SGM 18OCN1

S-ar putea să vă placă și