From exploration of andesitic rock deposit, following geodetic topographical points were
measured over the hill of the deposit.
Point
13
46
79
10 12
12 15
Xlocal Ylocal
10
95
15
90
25
85
35
80
55
75
Elev.
8.75
16.75
21.50
23.75
13.50
According to geodetic survey above, the topographical surface can be expressed as:
z = f(x,y) = - 0.01 x2 - 0.01 y2 + 100
Weathering zone of deposit was observed arround 1.5 m below the topographical surface of
the deposit. In general, groundwater is leveled 5 m below the ground surface, which is
averagely leveled at 0 m.asl. The deposit will be mined by means of surface mining. The
ultimate quary will be at level 20 m.asl. The unit weight of andesitic rock is about 2.6
ton/m3. The overall slope of pit can be designed approaching 90o as ground condition is very
stable. The hydraulic conductivity of rock mass was assumed to be isotropic at arround 10 -4
m/sec. From this information, please complete following task.
Give:
1.
2.
3.
Project 2
Micky Kololu
22114028
JAWAB
1. Persamaan umum
z = - 0.01 x2 - 0.01 y2 + 100
= - 0.01 x2 - 0.01 y2 + 100-1.5
the equation of andesite deposit surface :
z = - 0.01 x2 - 0.01 y2 + 98.5
Persamaan permukaan groundwater apabila dipotongkan terhadap bidang datar z 0 , maka
bidang potong tersebut berbentuk lingkaran seperti yang terlihat dibawah ini:
0 = -0.01 x2 -0.01 y2 +98.5
X2 +Y2 = 9850
Persamaan lingkaran yang dimaksud mempunyai titik pusat (0,0) dengan jari-jari = 9850.
9850
9850 y 2
V 4
9850
9850 y 2
Project 2
Micky Kololu
22114028
x
r cos
r
y
r sin
x
( x, y ) r
J
y
(u , v)
r
r cos
r sin
cos
r sin
sin
r cos
cos 2 r ( sin 2 r )
cos 2 r sin 2 r
r (cos 2 sin 2 )
r x 1
J r
Jika fungsi f (x, y) kita nyatakan dalam fungsi (r, ), maka limit integral akan berubah.
r akan dinyatakan mulai dari 0 - x/y maksimum sehingga limit r = dari 0 - 9850
V 4
/2
V 4
/2
V 4
/2
V 4
/2
V 4
/2
V 4
/2
9850
( 0,01 r 2 98,5) r dr d
9850
0,01 r 3 98,5 r dr d
0,01 r 4 98,5 r 2
4
2
9850
2
0,01( 9850 )
98,5 ( 9850)
4
2
242556,25 485112.5 d
242556.25 d
V 4 x727668,5
/2
1 d
Project 2
Micky Kololu
22114028
V 970225 x
/2
V1 = 1524025.866 m3
Resource = 2.6 ton/m3 x 152425.866 m3 = 3962467.252 ton
2.
= V 1 + V2
V1
= 1524025.866 m3
3.
= V 1 + V2
= 1524025.866 m3+ 618580 m3
= 2142605.866 m3
= 2142605.866 m3 x 2.6 ton/m3
h
l
5
20
0,25 x10 4 m / det ik
10 4 .
Q = A.q (m3/s)
Q = 3.14 x 9850 m2 x 0.25x10-4 m/s
Q = 0.7736 m3/s
= 5570775.252 ton