MEETING OBJECTIVES
1. To have feed back and improvement for QA / QC Program
2. To validate and to ensure the proposed QA / QC Program meeting with
PGEs requirements and comply with applicable regulations
3. To know that QA / QC Program as Part of Asset Integrity Management
Process
PROGRAM OBJECTIVES
Objectives of this program :
1. To ensure compliance with project requirements (target HSE, quality &
PROGRAM SCOPE
1. Project Description
To develop QA / QC program for Karaha Project, geothermal power plant
(GPP) including switchyard, the associated fluid collection and reinjection
system (FCRS) and 150 km Transmission System in Karaha, West Java,
Indonesia.
2. Scope of QA / QC Program
1.
2.
3.
4.
5.
Piping
Mechanical
Civil
Electrical
Instrumentation & Controller
WHAT IS QA / QC ?
(ISO 9000, 3.2.10 11)
_____________________________________________
QUALITY ASSURANCE
A part of quality
management focused
on providing confidence
that quality
requirements will be
fulfilled
QUALITY CONTROL
A part of quality
management focused
on fulfilling quality
requirements
WHAT IS QA / QC ?
(ISO 9000, 3.2.10 11)
_____________________________________________
These techniques and activities are agreed with customers and/or stakeholders
before project work is commenced.
QUALITY ASSURANCE
QUALITY CONTROL
A Strategy of Prevention
A Strategy of Detection
It is focused on planning,
documenting and guidelines to
assure quality.
specifications and
industry or company standards.
Activities
are
quality
plans,
inspection and test plans, the
selection of defect tracking tools
No
Description
Material
Spec
Receiving
Storage and
Handling
ASME II,ASME
B36.10,ASME
B36.19M, etc.
Design
ASME B 31.1.
Welding
Procedure
Personnel
ASME IX
Ver.
Mill
Certificate
and
PMI (If
needed)
Stress
Analysis
QUALITY CONTROL
Code
/Standard
No
Description
Material
Receiving
Storage and
Handling
Approval
Procedure
Report
Integrity
ASME B 31.1.
Hydro test
WPS /
PQR
WPQT
3
Welding
Consumable
Control
Purity Gas
Fit Up
Welding
Inspection
Preheating
PWHT
Hardness
ASME II Part C
ASME B 31.1
ASME V
Ver.
Certificate
Electrode
Certificate
Gas
(Argon)
Report (Fit
Up, Visual)
NDE
(RT,PT,UT,
MT)
No
Description
Cleaning
Before Paint
ISO 8501-1
SSPC
Approval
Procedure
Painting &
Coating
NACE
Approval
Procedure
Insulation
7
8
Pickling
Steam Blow
Reinstate
ASTM C1696
Ver.
Approval
Procedure
Approval
Procedure
Approval
Procedure
QUALITY CONTROL
No
6
7
Approval
Procedure
Description
Ver.
Report
Visual
Compare
ISO pic
Sand
Blasting
ISO 8501-1
SSPC
Painting &
Coating
Inspection
NACE
Ultra
Thickness
Measurem
ent
Insulation
ASTM C1696
Report
Pickling
Approval
Procedure
Endoscopic
Steam Blow
Approval
Procedure
Report
Target
Plate
Approval
Procedure
Line Check
Torque
Report
Code
/Standard
Reinstate
Description
Code
/Standard
Material
Spec
Receiving
Storage and
Handling
Design
Fabricator
Pressure
Vessel
Welding
Procedure
Personnel
ASME IX
Ver.
Mill Cert
Certificate
Guarantee
QUALITY CONTROL
No
Description
Material
Receiving
Storage and
Handling
Approved
Drawing
ASME Stamp
U
WPS /
PQR
WPQT
Code
/Standard
Ver.
Report
Integrity
Hydro test
Fabricator
Expire
ASME
Stamp U
Welding
Consumable
Control
Purity Gas
Fit Up
Welding
Inspection
Preheating
PWHT
Hardness
ASME II Part C
ASME B 31.1
ASME V
Certificate
Electrode
Certificate
Gas
(Argon)
Report (Fit
Up, Visual)
NDE
(RT,PT,UT,
MT)
Description
Installation
Grouting
Code
/Standard
Ver.
QUALITY CONTROL
No
Description
Approved
Procedure
Manufacture
Standard
Approved
Procedure
Certificate
Grouting
Installation
Grouting
Final Check
Final Check
Code
/Standard
Approved
Procedure
Approved
Procedure
Ver.
Report
Orientation,
Leveling,
Elevation,
Centerline
Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Anchor Bolt
Punch list
Description
Code
/Standard
Material
Spec
Receiving
Storage and
Handling
Design
Installation
Ver.
Mill Cert
Certificate
Guarantee
Approved
Drawing
QUALITY CONTROL
No
Description
Material
Receiving
Storage and
Handling
Integrity
Code
/Standard
Report
FAT
ASME B 31.1.
Approved
Procedure
Installation
Ver.
Approved
Procedure
Perform
test
Report
Leveling,
Elevation,
Centerline
Report PreAlignment
First
Alignment
(after
grouting)
Final
Alignment
Description
Grouting
Final Check
Code
/Standard
Manufacture
Standard
Ver.
QUALITY CONTROL
No
Approved
Procedure
Certificate
Grouting
Approval
Procedure
Description
Code
/Standard
Grouting
Approved
Procedure
Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Ancor Bolt
Final Check
Approved
Procedure
Punch list
Ver.
Description
Survey
Soil
Investigation
Code
/Standard
Excavation
Design
Ver.
Investigatio
n Existing
Facility
Approval
Procedure
QUALITY CONTROL
No
Description
Code
/Standard
Ver.
Survey
Report
Coordinate
s, Elevation
Soil
Investigation
Report
SPT,
DCPT,
Electric
Resistivity
Excavation
Report
Depth and
with
excavation,
Slope
ASCE 7
Description
Material
Spec
Receiving
Storage and
Handling
Code
/Standard
SNI 03-17292002
Foundation
Ver.
Grouting
Manufacture
Standard
Concrete
Work
No
Description
Code
/Standard
Ver.
Material
Receiving
Storage and
Handling
SNI 03-17292002
Report
Mill Cert
Approved
Procedure
Approved
Drawing
QUALITY CONTROL
Foundation
Report
Elevation,
Padding
Grouting
Approved
Procedure
Check
Material,
Surface
Preparation
, Mix of
Grout,
Curing,
Tightening
Anchor Bolt
Concrete
Work
Mechanical
Testing
Approved
Procedure
Certificate
Grouting
Description
Code
/Standard
Ver.
QUALITY CONTROL
No
Description
Code
/Standard
Ver.
Form Work
ACI 347
ACI 318
Mill Cert
Form Work
ACI 347
ACI 318
Material
Inspection
10
Reinforcing
Bar Work
Mill Cert
10
Reinforcing
Bar Work
Mechanical
Testing
11
Anchor Bolt
Mill Cert
11
Anchor Bolt
Mechanical
Testing
12
Steel Structure
Welding
Painting
Erection
Final
WPS,PQR,
WPQT
12
Steel Structure
Welding
Painting
Erection
Final
Report VT
NDE
Report
Paint thick
Report
Plumbness
, centerline,
elevation
Punch List
AWS D1.1
SSPC
AWS D1.1
SSPC