Sunteți pe pagina 1din 15

Maersk Oil North Sea

3rd Party Assurance Project


<ALD>
<October 2008>

Agenda

Introduction

Avoiding a Conflict of Interest

Work processes

Software options

Project Team options considered

Recommended solution

Discussion

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 2

Avoiding a Conflict of Interest


3rd Party Verification
Maersk Assurance Project

Independent Competent Person

Compliance with
UK Offshore Safety Legislation

Review of Designs / Workpacks

Maersk Oil
Contract Rep

Any change to a safety critical


element, plant, equipment,
procedures, maintenance or
inspection routines, operation,
process or controls which requires
engineering input of any sort or
that deviates from the original
design intent

Includes Class / Flag

MAP

Activities will be defined in a PQP.

Performance standards will make


reference to International
codes and standards including
DNV Offshore Standards

Contract Rep

Only Maersk Technical Standards


will be applied

Confirm on-going suitability of


SCEs against defined
Performance Standards
through Review, Audit, Test
and Inspection activities

ICP

Activities defined in a Verification


Scheme / 5 Year Plan

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 3

Work flow process


ICP

3rd Party

Maersk Oil

Review and
comment

Technical
Standards

SCEs

Review
and accept
MONS GATE 1

Review and
comment
Review and
comment

Performance
Standards

BOD/SOR

Engineering
Contractors

Verification
Scheme

Review / audit /
test / inspect
Det Norske Veritas AS. All rights reserved

Verify
compliance
MONS GATE 3

Fabricators

Survey

Offshore HUC

Inspect / Test

Verification
Activities

Review / audit /
test / inspect

Audit

Work
packs

When involving SCE

Review / audit /
test / inspect

MONS GATE 2

MONS GATE 4

Planned Shutdowns

Inspect / Test

Normal Operations
28 August 2015

Slide 4

Software options

Nauticus Production System (NPS)

DNV Energy Portal

Microsoft SharePoint

Maersk systems

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 5

Nauticus Production System

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 6

DNV Energy Portal

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 7

SharePoint

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 8

Options 3 solutions considered

Option 1
- Full-time PM + Admin assistant supplied at fixed monthly cost
- All other resources supplied as required in accordance with a schedule of
rates.
Project
Manager

Fixed cost

100% availability
(2 persons)

Technical Admin
Assistant

Variable Cost
Aberdeen
Engineering
and Survey
Resources

Det Norske Veritas AS. All rights reserved

Esbjerg
Engineering
and Survey
Resources

London
Engineering
Resources

28 August 2015

Hvik
Engineering
Resources

Schedule of Rates
(as-used basis)

Slide 9

Options 3 solutions considered

Option 2
- Full-time Core Team of 5 at fixed monthly cost. Resources guaranteed:
- PM, Admin, Mechanical Eng, E&I Eng, Surveyor (covering both
On/Offshore)
- Additional resources supplied in accordance with a schedule of rates
Mechanical Eng
Elec & Instr Eng

Aberdeen
Engineering
and Survey
Resources
Det Norske Veritas AS. All rights reserved

Project
Manager

Surveyor

100% availability
(5 persons)

Technical Admin
Assistant

Esbjerg
Engineering
and Survey
Resources

London
Engineering
Resources

28 August 2015

Fixed cost

Hvik
Engineering
Resources

Variable Costs
Schedule of Rates
(as-used basis)

Slide 10

Options 3 solutions considered

Option
- Full-time Team of 10 at fixed monthly cost.
- Additional resources supplied in accordance with schedule of rates

Mechanical Eng

Project
Manager

Onshore Surveyor

Elec & Instr Eng


Structural Eng

Fixed cost

Offshore Surveyor
Technical Admin
Assistant

NA / Marine Eng

100% availability

Subsea Eng

(10 persons)

Pipeline Eng

Aberdeen
Engineering
and Survey
Resources
Det Norske Veritas AS. All rights reserved

Esbjerg
Engineering
and Survey
Resources

London
Engineering
Resources
28 August 2015

Hvik
Engineering
Resources

Variable Costs

Schedule of Rates
(as-used basis)
Slide 11

Recommended solution

Option 1 in place as of 1 November 2008


- Preparation of Administrative Routines (1 Nov 1 Dec)
- Review and acceptance of Maersk Technical Standards (1 Nov 1 Dec)

Option 2 in place as of 1 December 2008


- MAP Project Team in place and operational

Work towards Option 3 bringing in additional resources on a full /part time


basis as required and approved by Maersk Oil

Continue to develop and build project resources as workload demands

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 12

Offshore Class Europe Organisation


May, Roslyne

Offshore Classification Europe


EOCUK 310
Bert Droy
Head of Department

Admin Support

Janet Wilson
SHEQ Manager

Charlotte Cornhill
Business Support Manager

LDN Approval & Service


Centre
EOCUK312

ABD Approval & Service


Centre
EOCUK311

Rotterdam Approval & Service


Centre
EOCNL 460

Offshore Units in
Operation
EOCUK 351

Angus Milne
Operations Manager

Graham Duff
Operations Manager

Frits Hagenaar
Operations Manager

Operations Manager

Bittencourt, Claudio
Blanc, Alderic
Blewett, Wade
Clewes,Nicola
Diaz, Jaime
Evans, James
Flinn, Jonathan
Harper, John
Harrison, Richard
Jackson, Denise
Martin, Paul
Mavromatakis, Emmanuel (c)
Manley, Anne
Mays, Michael (c)
McFarlane, Darren
MacKenzie, Alastair
Ng, Edwardus
Palmer, Liam
Parsons, Stephen
Raymond, Douglas (c)
Rothery, Nicola
Royet, Olivier (c)
Shaw, David

Det Norske Veritas AS. All rights reserved

Ali, Shahid
Baird, Gillian
Black, Sandy
Bragg, Mark
Davison, Jim (c)
Doig, Alex
Fowlie, Martin
Uri, Roald
Giannopoulus, Vasileous
Gray, Timothy
Green, Andrew
Jensen, Bente
Kerimbekov, Murat
Legg, Elisabeth
Reid, Margaret (c)
MacAngus-Gerrard, Geoff
MacKenzie, Margaret
MacKenzie, Martin
Manson, Stuart

Marius, Popa
McIntosh, Karen
McLean, Keith
Cockburn, Ian
Bruce, Stanley
Hardingham, Nicola
Foyen, Lars
Steven. James
Wilson, Allan
Antle, Lindsay
Blundon, Allison
Thomson, Mark
Kennedy, Margaret-Rose

28 August 2015

Angenent,Maurice
Berg,Chris van den
Beus,Ruud de
Bollermann,Sandra
Damme,Gillis van
Eman,Ronald
Groot,Arnold de
Holsteijn,Marc van
Kersten,Erik
Kleijwegt,Leo
Kranendonk,Tamara
Loon,Jos van
Melsted,Johann
Overweel-Minelli,Patricia
Ossewaarde-Bakker,Rianne
Pattynama,Wouter
Rijssemus,Regina
Roffel,Guus
Vecht-Huibers,Ria van der
Veer,Jeroen van der
Ven - Brand,Mariska van der
Vente,Marco de
Witsenburg,Edwin
Zande,Hans van de
Zuidema,Martijn

Bean, Marcus
Boswell, Jacqueline
Cashin, Brendan
Chadwick, Samuel
Craigmyle, Paul
Esin, Prosper
Ewing, Eric
Karner, Amund
Kavouras,Anargyros
Kelman, Ian
Legg, Ray
McGregor, Lisa
Niven, Ian
Reynolds, John
Roberts, Mark
Taylor, Richard
Watt, Donna

Slide 13

Discussion

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 14

Det Norske Veritas AS. All rights reserved

28 August 2015

Slide 15

S-ar putea să vă placă și