Federal Register / Vol. 72, No.

164 / Friday, August 24, 2007 / Notices 48631

state, and local government agencies; Environmental Assessment (EA) for the DEPARTMENT OF ENERGY
elected officials; environmental and project. The project occupies about 674
public interest groups; Indian tribes and acres of federal lands in the Custard Federal Energy Regulatory
Native American organizations with an National Forest managed by the U.S. Commission
interest in the project area; local Forest Service. [Docket No. PF07–9–000]
libraries and newspapers; intervenors;
The EA contains Commission staff’s
and other individuals that expressed an Steckman Ridge, L.P.; Notice of Intent
analysis of the potential environmental
interest in the proposed Project. To Prepare an Environmental
Additional information about the effects of the project and concludes that
Assessment for the Proposed
proposed Project is available from the licensing the project, with appropriate
Steckman Ridge Storage Project and
Commission’s Office of External Affairs, environmental protective measures,
Request for Comments on
at 1–866–208-–FERC or on the FERC would not constitute a major federal
Environmental Issues
Internet Web site (http://www.ferc.gov). action that would significantly affect the
To access information via the FERC Web quality of the human environment. August 20, 2007.
site click on the ‘‘eLibrary’’ link then A copy of the EA is available for The staff of the Federal Energy
click on ‘‘General Search’’ and enter the review at the Commission in the Public Regulatory Commission (FERC or
docket number (CP06–365) excluding Reference Room or may be viewed on Commission) will prepare an
the last three digits in the Docket the Commission’s Web site at http:// environmental assessment (EA) that will
Number field. Be sure you have selected address the environmental impacts of
www.ferc.gov using the ‘‘eLibrary’’ link.
an appropriate date range. The the Steckman Ridge Storage Project
Enter the docket number excluding the
‘‘eLibrary’’ link provides access to the proposed by Steckman Ridge, L.P.
last three digits in the docket number
texts of formal documents issued by the (Steckman). The Commission will use
field to access the document. For the EA in its decision-making process to
Commission, such as orders, notices,
assistance, contact FERC Online determine whether or not to authorize
and rulemakings. For assistance with
Support at the project. This notice explains the
‘‘eLibrary’’, please contact FERC Online
FERCOnlineSupport@ferc.gov or toll- scoping process the FERC staff will use
Support at FercOnlineSupport@ferc.gov
or toll free at 1–866–208–3676, or for free at (866) 208–3676, or for TTY, (202) to gather input from the public and
TTY, contact (202) 502–8659. 502–8659. interested agencies on the project. Your
In addition, the Commission now You may also register online at http:// input will help us determine the issues
offers a free service called eSubscription ferc.gov/docs-filing/esubscription.asp to that need to be evaluated in the EA.
which allows you to keep track of all be notified via email of new filings and Please note that the scoping period will
formal issuances and submittals in issuances related to this or other close on September 20, 2007.
specific dockets. This can reduce the pending projects. For assistance, contact This notice is being sent to affected
amount of time you spend researching FERC Online Support. landowners; federal, state, and local
proceedings by automatically providing government agencies; elected officials;
Consistent with the schedule environmental and public interest
you with notification of these filings,
document summaries and direct links to included in the Commission’s March 5, groups; Native American tribes; other
these documents. To learn more about 2007, notice, any comments on the EA interested parties; and local libraries
eSubscription and to sign-up for this should be filed by October 1, 2007. Note and newspapers. We 1 encourage
service please go to http://www.ferc.gov/ that the due date in the process plan for government representatives to notify
esubscribenow.htm. comments on the EA was based on a 30- their constituents of this planned
day comment period. We are project and encourage them to comment
Kimberly D. Bose, maintaining the process plan schedule on their areas of concern.
Secretary. notwithstanding the early issuance of If you are a landowner receiving this
[FR Doc. E7–16751 Filed 8–23–07; 8:45 am] the EA. Comments on the EA should be notice, you may be contacted by a
BILLING CODE 6717–01–P addressed to Kimberly D. Bose, Steckman representative about the
Secretary, Federal Energy Regulatory acquisition of an easement to construct,
Commission, 888 First Street, NE., operate, and maintain the proposed
DEPARTMENT OF ENERGY Washington, DC 20426. Please affix project facilities. The pipeline company
Project No. 2301–022 to all comments. would seek to negotiate a mutually
Federal Energy Regulatory acceptable agreement. However, if the
Commission Comments may be filed electronically
via the Internet in lieu of paper. The project is approved by the FERC, that
[Project No. 2301–022, Montana] Commission strongly encourages approval conveys with it the right of
electronic filings. See 18 CFR eminent domain. Therefore, if easement
PPL Montana; Notice of Availability of negotiations fail to produce an
Environmental Assessment 385.2001(a)(1)(iii) and the instructions
agreement, the pipeline company could
on the Commission’s Web site (http://
initiate condemnation proceedings in
August 17, 2007. www.ferc.gov) under the ‘‘e-Filing’’ link. accordance with state law.
In accordance with the National For further information, contact Steve A fact sheet prepared by the FERC
Environmental Policy Act of 1969 and Hocking at (202) 502–8753 or entitled ‘‘An Interstate Natural Gas
the Federal Energy Regulatory steve.hocking@ferc.gov. Facility on My Land? What Do I Need
Commission’s (Commission) To Know?’’ is available for viewing on
regulations, 18 CFR Part 380 (Order No. Kimberly D. Bose,
the FERC Internet Web site (http://
486, 52 FR 47897), the Office of Energy
yshivers on PROD1PC66 with NOTICES

Secretary. www.ferc.gov). This fact sheet addresses


Projects has reviewed the application [FR Doc. E7–16750 Filed 8–23–07; 8:45 am] a number of typically asked questions,
for license for the Mystic Lake
BILLING CODE 6717–01–P
Hydroelectric Project, located on West 1 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
Rosebud Creek, in Stillwater and Carbon environmental staff of the FERC’s Office of Energy
counties, Montana, and has prepared an Projects.

VerDate Aug<31>2005 14:35 Aug 23, 2007 Jkt 211001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1
48632 Federal Register / Vol. 72, No. 164 / Friday, August 24, 2007 / Notices

including the use of eminent domain The proposed storage field would be agencies with jurisdiction and/or
and how to participate in the FERC’s located on about 1,800 acres, and a special expertise with respect to
proceedings. buffer zone surrounding the filed would environmental issues, to express their
be established on about 2,900 acres. interest in becoming cooperating
Summary of the Proposed Project
Construction of the proposed agencies for the preparation of the EA.
Steckman proposes to convert a compressor station would require about These agencies may choose to
depleted natural gas production field 35 acres of land, and operation of the participate once they have evaluated the
into a multi-cycle natural gas storage station would require maintaining about proposal relative to their
facility located in Bedford County, 23 acres of the affected land. responsibilities. Agencies that would
Pennsylvania. The proposed facility like to request cooperating status should
The EA Process
would have about 17.7 billion cubic feet follow the instructions for filing
(Bcf) total capacity (up to 12 Bcf would The National Environmental Policy comments provided below (see Public
be working capacity and 5.7 Bcf would Act (NEPA) requires the Commission to Participation).
be base gas). The proposed project take into account the environmental
would include: impacts that could result from an action Currently Identified Environmental
Removal and/or abandonment of when it considers whether or not an Issues
existing production field piping and interstate natural gas pipeline should be The EA will discuss impacts that
aboveground equipment; Conversion of approved. The FERC will use the EA to could occur as a result of the
5 depleted production wells into storage consider the environmental impact that construction and operation of the
wells; Drilling and development of 18 could result if the Steckman Ridge proposed project. We have already
new storage wells and construction of Storage Project is authorized under identified several issues that we think
wellhead facilities; Construction of a section 7 of the Natural Gas Act. NEPA deserve attention based on a
storage field pipeline network and also requires us to discover and address preliminary review of the project site
associated aboveground facilities concerns the public may have about and the facility information provided by
including launcher/receiver facilities proposals to be considered by the Steckman. This preliminary list of
and valve sites; and Construction of one Commission. This process is referred to issues may be changed based on your
9,000 horsepower compressor station, as ‘‘scoping.’’ The main goal of the comments and our analysis.
including a meter and regulator station, scoping process is to focus the analysis • Potential impacts on perennial and
common launcher and receiver facility, in the EA on the important intermittent streams and waterbodies.
and other associate appurtenances. environmental issues. With this Notice • Evaluation of temporary and
The storage field piping network of Intent, the Commission staff is permanent impacts on wetlands.
would include the Trunk Line 91 (about requesting public comments on the • Potential effect on federally and
3.13 miles of 16-inch diameter scope of the issues to be addressed in state-listed species.
pipeline), Trunk Line 90 (about 4.36 the EA. All comments received will be • Potential visual effects of the
miles of 16-inch diameter pipeline), and considered during preparation of the aboveground facilities on surrounding
23 well laterals totaling 3.6 miles of 6- EA. areas.
inch, 8-inch, and 10-inch diameter Our independent analysis of the • Potential impacts to local air and
pipeline. Steckman plans to file its issues will be included in the EA. We noise quality associated with
certificate application in November will also evaluate possible alternatives construction and operation.
2007 and anticipates receiving a to the proposed project or portions of • Public safety and potential hazards
Commission certificate by April 2008. the project, and make recommendations associated with the transport of natural
A general location of the proposed on how to lessen or avoid impacts on gas and the proposed compressor
project is provided in Appendix 1.2 affected resources. facilities.
The EA will be mailed to federal,
Land Requirements for Construction state, and local government agencies; Public Participation
The Steckman Ridge Storage Project is elected officials; environmental and You can make a difference by
in the preliminary planning stage. The public interest groups; Native American providing us with your specific
precise facility design, pipeline route, tribes; affected landowners; comments or concerns about the
rights-of-way, and other details have not commentors; other interested parties; proposed project. By becoming a
yet been finalized. The proposed storage local libraries and newspapers; and the commenter, your concerns will be
field piping network is being planned to FERC’s official service list for this addressed in the EA and considered by
follow routes of the existing production proceeding. A 30-day comment period the Commission. Your comments
rights-of-way where possible. Specific will be allotted for review of the EA. We should focus on the potential
information on the proposed project will consider all comments on the EA environmental effects, reasonable
location and the land used by it will be before we make our recommendations to alternatives (including alternative
made available to the public when it is the Commission. To ensure that your facility sites and pipeline routes), and
finalized. comments are considered, please follow measures to avoid or lessen
the instructions in the Public environmental impact. The more
2 The appendices referenced in this notice are not Participation section of this notice. specific your comments, the more useful
being printed in the Federal Register. Copies of all Although no formal application has they will be. To ensure that your
appendices, other than Appendix 1 (maps), are been filed, the FERC staff has already comments are timely and properly
available on the Commission’s website at the initiated its NEPA review under its Pre- recorded, please mail your comments so
‘‘eLibrary’’ link or from the Commission’s Public
Reference Room, 888 First Street, N.E., Washington, filing Process. The purpose of the Pre- that they will be received in
filing Process is to encourage the early Washington, DC on or before September
yshivers on PROD1PC66 with NOTICES

D.C. 20426, or call (202) 502–8371. For instructions


on connecting to eLibrary refer to the Public involvement of interested stakeholders 20, 2007 and carefully follow these
Participation section of this notice. Copies of the and to identify and resolve issues before instructions:
appendices were sent to all those receiving this
notice in the mail. Requests for detailed maps of the an application is filed with the FERC. Send an original and two copies of
proposed facilities should be made directly to With this notice, we are asking your letter to: Kimberly D. Bose,
Iroquois. federal, state, and local governmental Secretary, Federal Energy Regulatory

VerDate Aug<31>2005 14:35 Aug 23, 2007 Jkt 211001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1
Federal Register / Vol. 72, No. 164 / Friday, August 24, 2007 / Notices 48633

Commission, 888 First St., NE., Room environmental mailing list for this ENVIRONMENTAL PROTECTION
1A, Washington, DC 20426. project. AGENCY
Label one copy of your comments for
Additional Information [EPA–HQ–OPPT–2006–0807; FRL–8459–4]
the attention of Gas Branch 2, DG2E.
Reference Docket No. PF07–9–000 on Additional information about the Agency Information Collection
the original and both copies. The project is available from the Activities; Submission to OMB for
Commission strongly encourages Commission’s Office of External Affairs, Review and Approval; Comment
electronic filing of any comments in at 1–866–208–FERC (3372) or on the Request; Request for Contractor
response to this Notice of Intent. For FERC Internet Web site (http:// Access to TSCA Confidential Business
information on electronically filing Information (CBI); EPA ICR No.
www.ferc.gov) using the ‘‘eLibrary link.’’
comments, please see the instructions 1250.08, OMB No. 2070–0075
Click on the eLibrary link, select
on the Commission’s Web site at http://
‘‘General Search’’ and enter the project AGENCY: Environmental Protection
www.ferc.gov under the ‘‘e-Filing’’ link
and the link to the User’s Guide, as well docket number excluding the last three Agency (EPA).
as information in 18 CFR digits (i.e., PF07–9) in the ‘‘Docket ACTION: Notice.
385.2001(a)(1)(iii). Before you can Number’’ field. Be sure you have
submit comments, you will need to selected an appropriate date range. For SUMMARY: In compliance with the
create a free account, which can be assistance, please contact FERC Online Paperwork Reduction Act (44 U.S.C.
created on-line. Support at 3501 et seq.), this document announces
Based on the comments we receive on FERCOnlineSupport@ferc.gov or toll that an Information Collection Request
the project, we may hold a public free at 1–866–208–3676, or TTY, contact (ICR) has been forwarded to the Office
scoping meeting. A public scoping (202) 502–8659. The eLibrary link on of Management and Budget (OMB) for
meeting is designed to provide another the FERC Internet Web site also review and approval. This is a request
opportunity to offer comments on the provides access to the texts of formal to renew an existing approved
proposed project. Interested groups and documents issued by the Commission, collection. The ICR, which is abstracted
individuals are encouraged to attend the such as orders, notices, and rule below, describes the nature of the
meeting and to present comments on the makings. information collection activity and its
issues they believe should be addressed expected burden and costs.
In addition, the FERC now offers a
in the EA. A transcript of the meeting DATES: Additional comments may be
free service called eSubscription that
would be generated so that your submitted on or before September 24,
allows you to keep track of all formal 2007.
comments would be accurately
issuances and submittals in specific
recorded. ADDRESSES: Submit your comments,
dockets. This can reduce the amount of
When Steckman submits its referencing docket ID Number EPA–
time you spend researching proceedings
application for authorization to HQ–OPPT–2006–0807 to (1) EPA online
by automatically providing you with
construct and operate the Steckman using http://www.regulations.gov (our
Ridge Storage Project, the Commission notification of these filings, document
summaries, and direct links to the preferred method), by e-mail to
will publish a Notice of Application in oppt.ncic@epa.gov or by mail to:
the Federal Register and will establish documents. To register for this service,
Document Control Office (DCO), Office
a deadline for interested persons to go to http://www.ferc.gov/
of Pollution Prevention and Toxics
intervene in the proceeding. Because the esubscribenow.htm. Public meetings or
(OPPT), Environmental Protection
Commission’s Pre-filing Process occurs site visits will be posted on the Agency, Mail Code: 7407T, 1200
before an application to begin a Commission’s calendar located at http:// Pennsylvania Ave., NW., Washington,
proceeding is officially filed, petitions www.ferc.gov/EventCalendar/ DC 20460, and (2) OMB at: Office of
to intervene during this process are EventsList.aspx along with other related Information and Regulatory Affairs,
premature and will not be accepted by information. Office of Management and Budget
the Commission. Finally, Steckman has established an (OMB), Attention: Desk Officer for EPA,
Environmental Mailing List Internet Web site for this project at 725 17th Street, NW., Washington, DC
www.steckmanridgestorage.com. The 20503.
An effort is being made to send this Web site includes a description of the FOR FURTHER INFORMATION CONTACT:
notice to all individuals, organizations, project, maps of the proposed pipeline
and government entities interested in Barbara Cunningham, Director,
facilities, and answers to frequently Environmental Assistance Division,
and/or potentially affected by the
asked questions. You can also request Office of Pollution Prevention and
proposed project. This includes all
additional information or provide Toxics, Environmental Protection
landowners who are potential right-of-
way grantors, whose property may be comments directly to Steckman by Agency, Mailcode: 7408–M, 1200
used temporarily for project purposes, phone at 1–877–379–0338. Pennsylvania Ave., NW., Washington,
or who own homes within distances DC 20460; telephone number: 202–554–
Kimberly D. Bose,
defined in the Commission’s regulations 1404; e-mail address: TSCA-
Secretary. Hotline@epa.gov.
of certain aboveground facilities. If you
[FR Doc. E7–16743 Filed 8–23–07; 8:45 am]
received this notice, you are currently SUPPLEMENTARY INFORMATION: EPA has
BILLING CODE 6717–01–P
on the environmental mailing list for submitted the following ICR to OMB for
this project. If you want to remain on review and approval according to the
our mailing list, please return the procedures prescribed in 5 CFR 1320.12.
yshivers on PROD1PC66 with NOTICES

attached Information Request On November 9, 2006 (71 FR 65809),


(Appendix 2). All individuals who EPA sought comments on this renewal
provide written comments, attend the ICR pursuant to 5 CFR 1320.8(d). EPA
scoping meetings, or return the received no comments during the
Information Request will remain on our comment period. Any additional

VerDate Aug<31>2005 14:35 Aug 23, 2007 Jkt 211001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1

S-ar putea să vă placă și