PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
0 of 6
REVISION :
00
00
18/09/12
FOR APPROVAL
REV
DATE
DESCRIPTION
PT
PREPARE
D
MTS
SBY
CHECKED
APPD PM
APPD BY
KDL
0
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
1 of 6
1.
REVISION :
00
Purpose :
The main purpose of this safety plan is to prevent any kind of accident that will affect the
property, the environment, and worker to achieve Zero Accident during construction
activities at the project site.
2.
Scope :
The Safety Plan steps for this project are describe below :
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
2 of 6
REVISION :
00
c. Ensure the ground condition is free from sink hole and hard enough for positioning
of equipment/machine prior commencement work. The crane outriggers shall be
positioned onto steel plate or wood if found soft ground.
d. Pre-job safety meeting/pre lift briefing shall be held prior commencing work with
all crew involved. All worker shall be concentrated to the job especially on their
technique and will do observation on before, during and after doing the job.
e. Erection area will be closed with sign or barricade.
3. Working at height :
a. Worker shall be provided with personnel protective equipment such as safety
helmet, chain stap, hand glove, eye protection, safety shoes and ear protection
necessary as possible. Avoid using of detective, improperly connected apparatus.
b. Working at height shall be provided with full body harness and its lanyard shall
be tied off on strong materials or life line. Full body harness completed with
double lanyard. All access shall be provided for worker required to work at height.
c. Work permit requirements to be completed and signed before commencement of
any work.
d. Lifting worker will use man basket (especially to release webbing rope for erect
column)
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
3 of 6
REVISION :
00
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
4 of 6
Warehouse &
Workshop Building
Electrial, Admin and
Control Building
REVISION :
00
Electrical Switchyard
Building
Power Building
GTG & STG
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
5 of 6
REVISION :
00
Mobile crane
45 ton
Barricade or safety
sign
Construction
Area
STOCK AREA
Barricade or safety
sign
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
6 of 6
REVISION :
00
STOCK AREA
Construction
Area
Mobile crane
25 ton
STOCK AREA
PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT
DATE REVISION :
-
UNIT ISSUING:
QSHE
APPROVED BY:
PROJECT MANAGER
PAGE :
7 of 6
REVISION :
00
STOCK AREA
Mobile crane
25 ton
Construction
Area