SAFETY PLAN of STEEL STRUCTURE

ERECTION for BUILDING PACKAGE


PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
0 of 6

REVISION :
00

SAFETY PLAN of STEEL STRUCTURE ERECTION


For
BUILDING PACKAGE

00

18/09/12

FOR APPROVAL

REV

DATE

DESCRIPTION

PT
PREPARE
D

MTS

SBY

CHECKED

APPD PM

APPD BY
KDL
0

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
1 of 6

1.

REVISION :
00

Purpose :
The main purpose of this safety plan is to prevent any kind of accident that will affect the
property, the environment, and worker to achieve Zero Accident during construction
activities at the project site.

2.

Scope :
The Safety Plan steps for this project are describe below :

1. Personel and equipment mobilization :


a. Equipment operation must be competent licensed and checked to conforming
safety by supervision.
b. HSE audit and inspection of equipment to be carried out in accordance with steel
structure erection procedure.
c. Ensure personnel were physically fit, competent and qualified for the job complete
PT.PP (Persero) Tbk induction and job orientation.
d. Ensure all personnel were equipped with prescribe PPE requirement (safety glass,
safety shoes, helmet, etc) and fire extinguisher and first aid kit were provided at
job site.

2. Loading, Unloading and Erect material and equipment :


a. Good and clear job instruction to all persons involved assign a rigger to ensure that
equipment or material position is as close as possible to lifting and raise.
b. Ensure the load weight prior lift is not exceeding with crane capacity. Never walk
crossing under the load. The leader shall closely monitor the measurement of the
required wire rope standard and aware of the potential hazards with good rigging
technique.

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
2 of 6

REVISION :
00

c. Ensure the ground condition is free from sink hole and hard enough for positioning
of equipment/machine prior commencement work. The crane outriggers shall be
positioned onto steel plate or wood if found soft ground.
d. Pre-job safety meeting/pre lift briefing shall be held prior commencing work with
all crew involved. All worker shall be concentrated to the job especially on their
technique and will do observation on before, during and after doing the job.
e. Erection area will be closed with sign or barricade.

3. Working at height :
a. Worker shall be provided with personnel protective equipment such as safety
helmet, chain stap, hand glove, eye protection, safety shoes and ear protection
necessary as possible. Avoid using of detective, improperly connected apparatus.
b. Working at height shall be provided with full body harness and its lanyard shall
be tied off on strong materials or life line. Full body harness completed with
double lanyard. All access shall be provided for worker required to work at height.
c. Work permit requirements to be completed and signed before commencement of
any work.
d. Lifting worker will use man basket (especially to release webbing rope for erect
column)

4. Erection and lifting use scaffolding & bucket :


a. Scafollder or worker must use full body harness to prevent accident fall.
b. The scaffold must be erected, inspected, certified and tagged by competent and
qualified person.

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
3 of 6

REVISION :
00

5. Welding, grinding and cutting :


a. Hot work permit requirements is to be completed and signed before
commencement of any work as required.
b. Welding, grinding and cutting must be used special PPE requirement.

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
4 of 6

Warehouse &
Workshop Building
Electrial, Admin and
Control Building

REVISION :
00

Electrical Switchyard
Building

Power Building
GTG & STG

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
5 of 6

REVISION :
00

Electrical, Admin and Control Building

Mobile crane
45 ton

Barricade or safety
sign

Power Plant Fence

Construction
Area

STOCK AREA

Barricade or safety
sign

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
6 of 6

REVISION :
00

Electrical Switcyard Building


Barricade or safety
sign

STOCK AREA

Construction
Area
Mobile crane
25 ton

STOCK AREA

SAFETY PLAN of STEEL STRUCTURE


ERECTION for BUILDING PACKAGE
PP IMECO Consortium
DOCUMENT NO. :
781102-0000-SHE-0001

PROJECT NAME:
KDL 120 MW COMBINED CYCLE
POWER PLANT

DATE REVISION :
-

UNIT ISSUING:
QSHE

APPROVED BY:
PROJECT MANAGER

PAGE :
7 of 6

REVISION :
00

Warehouse & Workshop


Power Plant Fence

STOCK AREA

Mobile crane
25 ton

Construction
Area