Sunteți pe pagina 1din 2

45044 Federal Register / Vol. 72, No.

154 / Friday, August 10, 2007 / Notices

aquatic resources and wildlife habitat Implementation, Alturas Field Office ongoing need for appropriate storage
from new road construction and impacts Project, Resource Management Plan, and ultimate disposition of radioactive
from existing roads need maintenance, Implementation, Lassen, Modoc, waste generated on-site. EPA also has
and suggested that the final EIS include Shasta and Siskiyou Counties, CA concerns about the lack of measures to
additional information on implementing Summary: EPA continues to have limit bioentrainment and other impacts
proposed road closures. environmental concerns about water to aquatic species from surface water
Rating EC2. quality, soil condition and rangeland withdrawals and discharges.
EIS No. 20070222, ERP No. D–AFS– habitat, and requested that BLM focus Dated: August 7, 2007.
J65484–MT, Grizzly Vegetation and on relieving grazing pressure in Robert W. Hargrove,
Transportation Management Project, Category 1 rangelands until these areas
Director, NEPA Compliance Division, Office
Proposes Timber Harvest, Prescribed improve. EPA also requested the closure of Federal Activities.
Burning, Road Maintenance, and of OHV route segments adjacent to
[FR Doc. E7–15714 Filed 8–9–07; 8:45 am]
Transportation Management Actions, waters to improve soil conditions,
BILLING CODE 6560–50–P
Three Rivers Ranger District, Kootenai habitat, and water quality.
National Forest, Lincoln County, MT EIS No. 20070236, ERP No. F–BLM–
Summary: EPA expressed K65307–00, Eagle Lake Field Office ENVIRONMENTAL PROTECTION
environmental concerns about Project, Resource Management Plan, AGENCY
potential adverse impacts to soil and Implementation, Lassen, Plumas,
Sierra Counties, CA and Washoe [ER–FRL–6689–7]
water quality.
Rating EC2. County, NV
Environmental Impacts Statements;
EIS No. 20070238, ERP No. D–AFS– Summary: EPA continues to have Notice of Availability
K65328–00, Mt. Ashland Late- environmental concerns about water
Successional Reserve Habitat quality and soil condition and Responsible Agency: Office of Federal
Restoration and Fuels Reduction rangeland habitat, and requested that Activities, General Information (202)
Project, To Promote and Maintain BLM focus on relieving grazing pressure 564–7167 or http://www.epa.gov/
Late-Successional Habitat, Oak Ranger in Category 1 rangelands until these compliance/nepa/.
District, Klamath National Forest, areas improve. EPA also requested the Weekly receipt of Environmental Impact
Siskiyou County, CA and Jackson closure of additional OHV route Statements
County, OR segments adjacent to waters to improve Filed 07/30/2007 Through 08/03/2007
soil conditions, habitat, and water Pursuant to 40 CFR 1506.9.
Summary: EPA expressed
quality. EIS No. 20070328, Final Supplement,
environmental concerns about
impacts to riparian areas and the EIS No. 20070240, ERP No. F–AFS– BLM, MT, Golden Sunlight Mine Pit
watershed from proposed silviculture J65401–00, Northern Rockies Lynx Reclamation Alternatives, Preferred
treatments and recommended that the Management Direction, Selected Alternative Selected is the
Final EIS include information about Alternative F, Conservation and Underground Sump Alternative,
potential source water locations in the Promote Recovery of the Canada Operating Permit No. 00065 and Plan-
project area, and identify Alternative Lynx, NFS and BLM to Amend Land of-Operations #MTM 82855,
5 as the Preferred Alternative. Resource Management Plans for 18 Whitehall, Jefferson County, MT, Wait
National Forests (NF), MT, WY, UT, Period Ends: 09/10/2007, Contact:
Rating EC2.
and ID David Williams 406–533–7655.
Final EISs Summary: EPA continues to have EIS No. 20070329, Final EIS, GSA, OH,
EIS No. 20070219, ERP No. F–AFS– environmental concerns about Cincinnati National Institute for
J65478–00, Norwood Project, Proposes mitigation measures to protect the lynx Occupational Safety and Health
to Implement Multiple Resource and its habitat. (NIOSH) Laboratories Consolidation,
Management Actions, Black Hills EIS No. 20070283, ERP No. F–AFS– Site Selection, Hamilton and
National Forest, Hell Canyon Ranger L65532–OR, Five Buttes Project, Clermont Counties, OH, Wait Period
District, Pennington County, SD and Conduct Vegetation Management Ends: 09/10/2007, Contact: Phil
Weston and Crook Counties, WY Activities, Implementation, Deschutes Youngberg 404–433–8393.
National Forest, Crescent Ranger EIS No. 20070330, Draft EIS, IBW, CA,
Summary: The final EIS and additional
District, Deschutes County, OR PROGRAMMATIC—Tijuana River
information adequately addressed
Summary: No formal comment letter Flood Control Project, Proposing a
EPA’s concerns with impacts to water
was sent to the preparing agency. Range of Alternatives for Maintenance
quality soils and wetlands, roads,
Activities and Future Improvements,
sedimentation and OHV use, invasive EIS No. 20070293, ERP No. F–SFW–
San Diego County, CA, Comment
and noxious weeds, and wildlife A65170–00, Light Goose Management
Period Ends: 09/24/2007, Contact:
habitat; therefore, EPA does not object Plan, Reducing and Stabilizing
Daniel Borunda 915–832–4767.
to this proposed action. Specific Populations ‘‘Light Geese’’ in EIS No. 20070331, Draft EIS, IBW, TX,
EIS No. 20070233, ERP No. F–NPS– North America, Implementation PROGRAMMATIC—Rio Grande Flood
J65461–CO, Great Sand Dunes Summary: EPA does not object to the Control Projects, Proposing a Range of
National and Preserve. General proposed action. Alternatives for Maintenances
Management Plan/Wilderness Study, EIS No. 20070254, ERP No. FS–TVA– Activities and Future Improvements,
Implementation, Alamos and E06008–TN, Watts Bar Nuclear Plant along the Texas-Mexico Border,
sroberts on PROD1PC70 with PROPOSALS

Saguache Counties, CO Unit 2, Completion and Operation, Comment Period Ends: 09/24/2007,
Summary: No formal comment letter Updated Information on Extensive Contact: Daniel Borunda 915–832–
was sent to the preparing agency. Environmental Record, Rhea County, 4767.
EIS No. 20070235, ERP No. F–BLM– TN EIS No. 20070332, Draft EIS BLM, OR,
K65306–CA, Alturas Field Office Summary: EPA continues to have Western Oregon Bureau of Land
Project, Resource Management Plan, environmental concerns about the Management Districts of Salem,

VerDate Aug<31>2005 16:37 Aug 09, 2007 Jkt 211001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1
Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices 45045

Eugene, Roseburg, Coos Bay, and Draft Wharf and Fill Improvements, and Honolulu Counties, HI;
Medford Districts, and the Klamath Implementation, Piti, Guam, Anchorage and Southeast Fairbanks
Falls Resource Area of Lakeview Comment Period Ends: 09/24/2007, Boroughs, AK; El Paso, Pueblo, and
District, Revision of the Resource Contact: James Hatashima 808–438– Fremont Counties, CO, Comment
Management Plans, Implementation, 2264. Period Ends: 10/30/2007, Contact:
OR, Comment Period Ends: 11/09/ EIS No. 20070340, Final EIS, FRC, 00, Michael Ackerman 410–436–2522.
2007, Contact: Dick Prather 503–808– Southeast Expansion Project, Revision of FR Notice Published 07/
6627. Construction and Operation of 110.8 20/2007; Extending Comment Period
EIS No. 20070333, Final EIS, AFS, OR, miles for Natural Gas Pipeline and from 09/04/2007 to 10/30/2007.
Spears Vegetation Management Associated Ancillary Facilities, TX EIS No. 20070322, Draft EIS, NPS, AZ,
Project, Proposal to Use Commercial and LA, Wait Period Ends: 09/10/ Saguaro National Park General
Timber Harvest, Precommercial 2007, Contact: Andy Black 1–866– Management Plan, Implementation,
Thinning, Prescribed Fire, Grapple 208–3372. Rincon Mountain District and Tucson
Piling and Hand Piling in the Mark EIS No. 20070341, Final EIS, NPS, MA, Mountain District, Pima County, AZ,
Creek Watershed and Veaqie Creek Cape Cod National Seashore (CACO) Comment Period Ends: 10/02/2007,
Subwatershed, Lookout Mountain Hunting Program, General Contact: Mary McVeigh 303–969–
Ranger District, Ochoco National Management Plan, Implementation, 2442. Revision of FR Notice Published
Forest, Crook and Wheeler Counties, Barnstable County, MA, Wait Period 08/03/2007: Correction to Comment
OR, Wait Period Ends: 09/10/2007, Ends: 09/10/2007, Contact: Carrie Period from 09/17/2007 to 10/02/
Contact: Katherine Farrell 541–416– Phillips 508–349–3785 Ext. 216. 2007.
6500. EIS No. 20070342, Final EIS, FRC, GA,
EIS No. 20070334, Final EIS, AFS, CO, Elba III Project, Construct, Operate Dated: August 6, 2007.
Lizard Head Road Easement, and Acquire Facilities to move Re- Robert W. Hargrove,
Application from Private Landowners Vaporized Liquefied Natural Gas Director, NEPA Compliance Division, Office
Requesting a Permit to Cross Public (LNG), U.S. Army COE Section 10 and of Federal Activities.
Lands to Access Non-Federal Lands, 404 Permits and U.S. Coast Guard [FR Doc. 07–3921 Filed 8–9–07; 8:45 am]
San Juan National Forest, Dolores Permit, Elba Island, Chatham County, BILLING CODE 6560–50–M
Ranger District, Dolores County, CO, GA, Wait Period Ends: 09/10/2007,
Wait Period Ends: 09/10/2007, Contact: Andy Black 1–866–208–
Contact: Jim Powers 970–385–1211. 3372. ENVIRONMENTAL PROTECTION
EIS No. 20070335, Final EIS, NRC, VT EIS No. 20070343, Draft EIS, STA, 00, AGENCY
Generic—License Renewal of Nuclear Keystone Oil Pipeline Project, [FRL–8453–2; Docket ID No. EPA–HQORD–
Plants, Supplement 30 to Proposed Construction, Connection, 2007–0667]
NUREG1437, Regarding Vermont Operation and Maintenance,
Yankee Nuclear Power Station, Applicant for Presidential Permit, ND, Climate and Land Use Change Effects
Vernon, VT, Wait Period Ends: 09/10/ SD, NE, KS, MO, IL and OK, on Ecological Resources in Three
2007, Contact: Richard L. Emch 301– Comment Period Ends: 09/24/2007, Watersheds: A Synthesis Report
415–1570. Contact: Elizabeth Orlando 202–647–
EIS No. 20070336, Final EIS, FHW, UT, 4284. AGENCY: Environmental Protection
South Logan to Providence EIS No. 20070344, Draft EIS, FHW, VT, Agency (EPA).
Transportation Corridor Project, Circ-Williston Transportation Project, ACTION: Notice of public comment
Improvements to 100 East Street Improvements between I–89 and the period.
between 300 South (Logan) to Towns Williston and Essex and the
SUMMARY: EPA is announcing a 30-day
Providence Lane (100 North) in Village of Essex Junction, City of
Providence, Funding and Right-of- public comment period for the draft
Burlington, Chittenden County, VT,
Way Grant, Cities of Logan and document titled, ‘‘Climate and Land Use
Comment Period Ends: 11/08/2007,
Providence, Cache County, UT, Wait Change Effects on Ecological Resources
Contact: Kenneth R. Sikora, Jr. 802–
Period Ends: 09/10/2007, Contact: in Three Watersheds: A Synthesis
828–4424.
Doug Atkin 801–963–0182. Report’’ (EPA/600/R–07/086). The
EIS No. 20070337, Final EIS, TVA, AL, Amended Notices document was prepared by the National
Bear Creek Dam Leakage Resolution EIS No. 20070266, Draft EIS, SFW, 00, Center for Environmental Assessment
Project, To Modify Dam and Maintain Lake Umbagog National Wildlife within EPA’s Office of Research and
Summer Pool Level of 576 Feet, Bear Refuge, Comprehensive Conservation Development.
Creek Dam, Franklin County, AL, Plan, 15 Year Guidance for EPA is releasing this draft document
Wait Period Ends: 09/10/2007, Management of Refuge Operations, solely for the purpose of pre-
Contact: Charles P. Nicholson 865– Habitat and Visitor Services, dissemination peer review under
632–3582. Implementation, Coos County, NH applicable information quality
EIS No. 20070338, Draft Supplement, and Oxford County, ME, Comment guidelines. This document has not been
TVA, TN, Watts Bar Reservoir Land Period Ends: 09/21/2007, Contact: formally disseminated by EPA. It does
Management Plan, Amend and Nancy McGarigal 413–253–8562 not represent and should not be
Update the 2005 Plan, Guide Land Revision of FR Notice Published 07/ construed to represent any Agency
Use Approvals, Private Water Use 06/2007: Extending Comment Period policy or determination. EPA intends to
Facility, and Resource Management from 08/20/2007 to 09/21/2007. consider any public comments
sroberts on PROD1PC70 with PROPOSALS

Decisions, Loudon, Meigs, Rhea and EIS No. 20070307, Draft EIS, USA, 00, submitted in accordance with this
Roane Counties, TN, Comment Period Permanent Home Stationing of the notice when revising the document.
Ends: 09/24/2007, Contact: Richard L. 2/25th Stryker Brigade Combat Team DATES: The 30-day public comment
Toennisson 865–632–8517. (SBECT), to Address a Full Range of period begins August 10, 2007, and ends
EIS No. 20070339, Draft EIS, COE, GU, Alternatives for Permanently September 10, 2007. Technical
Apra Harbor Master Plan for Deep- Stationing the 2/25th SBCT, Hawaii comments should be in writing and

VerDate Aug<31>2005 16:37 Aug 09, 2007 Jkt 211001 PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 E:\FR\FM\10AUN1.SGM 10AUN1

S-ar putea să vă placă și